Important Notice: Procurement Posting Guidelines During Federal Elections

During a federal government election, it is the buyer’s responsibility to obtain proper approval prior to posting procurement activities on CanadaBuys. For more information on obtaining approval prior to posting on CanadaBuys, buyers should contact their supervisor. For technical questions regarding publications or urgent requirements regarding postings, contact the Service Desk.

Archived - Standard Acquisition Clauses and Conditions Manual - D - Delivery, Inspection and Acceptance


Version: 06-2023

This page has been archived

Information below is provided for reference, research or recordkeeping purposes. It is not subject to the Government of Canada Web Standards and has not been altered or updated since it was archived. Contact the CanadaBuys Service Desk to request a format other than those available or if you require support.

The Standard Acquisition Clauses and Conditions (SACC) Manual is no longer being maintained as of June 2023. Clauses previously labelled as “Active” in the manual are now shown as archived. Contracts issued with SACC Manual clauses remain valid. This is part of Public Services and Procurement Canada’s modernization efforts. Read a news article for more information.

How to search for clauses

  1. Type a keyword, clause title, ID or effective date in the search bar below and press “Enter” or click the search button
  2. Navigate through search results using the up or down arrow buttons
  3. Click the title of the clause of interest to view the content
  4. Clear your search at any time or begin a new search by clicking the X button

Other tips

Main Content

Table of contents

Delivery, Inspection and Acceptance

D0001C

Effective Date
Item Status
ID
Title
2008-05-12ActiveD0001CPhased Delivery

Remarks – Recommended Use of SACC Item

Use the following clause in contracts with phased delivery, if applicable. The term "calendar days" may be replaced by "weeks" or "months", as appropriate, and "weekly" may be replaced by "daily" or "monthly", as appropriate.

Legal text for SACC item

The first delivery must be made within _____ calendar days from the effective date of the Contract. The quantity delivered must be _____ . The balance must be delivered at the rate of _____ weekly after the first delivery until completion of the Contract.

2007-11-30SupersededD0001CARCHIVED Phased Delivery

D0001D

Effective Date
Item Status
ID
Title
1997-09-15SupersededD0001DARCHIVED Delivery - Phased

Remarks – Recommended Use of SACC Item

When the following clause is used, "days" may be replaced by "weeks" or "months" 
as appropriate, and "per week" may be replaced by "per day" or "per month" as 
appropriate.

Legal text for SACC item

The first delivery shall be made within _____ days from the date of the 
Contract.  The quantity delivered shall be _____.  The balance shall be 
delivered at the rate of _____ per week thereafter until completion.

1991-06-01SupersededD0001DARCHIVED Delivery - Phased

D0002T

Effective Date
Item Status
ID
Title
2014-06-26ActiveD0002TBest Delivery Date - Bid

Remarks – Recommended Use of SACC Item

Use the following clause in bid solicitations when "best delivery" may be offered by the bidder.

Legal text for SACC item

While delivery is requested by ________ , the best delivery that could be offered is ________ .

2007-11-30SupersededD0002TARCHIVED Delivery
2004-12-10SupersededD0002TARCHIVED Delivery
2000-05-12SupersededD0002TARCHIVED Delivery
1997-09-15SupersededD0002TARCHIVED Delivery
1991-06-01SupersededD0002TARCHIVED Delivery

D0003C

Effective Date
Item Status
ID
Title
2007-11-30ActiveD0003CPhased Delivery - Inspection

Remarks – Recommended Use of SACC Item

Use the following clause in contracts when samples are required. The term "calendar days" may be replaced by "weeks" or "months", as appropriate; and "by week" may be replaced by "by day" or "by month", as appropriate.

Legal text for SACC item

The first delivery must be made within _____ calendar days from the date on which the samples were inspected and accepted. The quantity delivered must be _____ . The balance must be delivered at the rate of _____ per week after the first delivery until completion.

D0003D

Effective Date
Item Status
ID
Title
1998-02-16SupersededD0003DARCHIVED Delivery, Phased - Inspection

Remarks – Recommended Use of SACC Item

Use the following clause when samples are required. "Days" may be replaced by 
"weeks" or "months" as appropriate, and "per week" may be replaced by "per day" 
or "per month" as appropriate.

Legal text for SACC item

The first delivery shall be made within _____ days from the date on which 
the samples have passed inspection. The quantity delivered shall be _____. 
The balance shall be delivered at the rate of _____ per week thereafter 
until completion.

1997-09-15SupersededD0003DARCHIVED Delivery, Phased - Inspection
1991-06-01SupersededD0003DARCHIVED Delivery - Phased

D0004T

Effective Date
Item Status
ID
Title
1991-06-01CancelledD0004TARCHIVED Delivery - Best Possible

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

THIS IS AN URGENT REQUIREMENT.  THE ABILITY TO MAKE EARLY DELIVERY IS OF 
   PRIMARY CONSIDERATION IN AWARDING A CONTRACT - SET OUT BEST POSSIBLE 
   DELIVERY. 

D0005C

Effective Date
Item Status
ID
Title
2007-11-30ActiveD0005CComplete Delivery

Remarks – Recommended Use of SACC Item

Use the following clause in contracts when complete delivery is applicable. The term "calendar days" may be replaced by "weeks" or "months", as appropriate.

Legal text for SACC item

The Contractor must make the complete delivery within _____ calendar days from the effective date of the Contract.

D0005D

Effective Date
Item Status
ID
Title
1997-09-15SupersededD0005DARCHIVED Delivery

Remarks – Recommended Use of SACC Item

When the following clause is used, "days" may be replaced by "weeks" or "months" 
as appropriate.

Legal text for SACC item

The Contractor shall make the complete delivery within _____ days from the 
date of the Contract.


1991-06-01SupersededD0005DARCHIVED Delivery

D0006D

Effective Date
Item Status
ID
Title
1997-09-15CancelledD0006DARCHIVED Delivery - Mandatory

Remarks – Recommended Use of SACC Item

Use this clause when the specified delivery date is a mandatory requirement.

Legal text for SACC item

The Contractor shall make the complete delivery by _____.


1991-06-01SupersededD0006DARCHIVED Delivery

D0007C

Effective Date
Item Status
ID
Title
2014-06-26ActiveD0007CPreparation for Delivery - Canadian Forces Transportation Packaging Order

Remarks – Recommended Use of SACC Item

Use the following clause in contracts when preparation for delivery must be in accordance with Canadian Forces Transportation Packaging Order.

Legal text for SACC item

Preparation for delivery for item(s) _____________ (insert the contract item number(s) must be in accordance with Canadian Forces Transportation Packaging Order _______ , dated ___________ (insert the number and the date).

2012-07-16SupersededD0007CARCHIVED Preparation for Delivery
2008-05-12SupersededD0007CARCHIVED Preparation for Delivery

D0007D

Effective Date
Item Status
ID
Title
2004-05-14SupersededD0007DARCHIVED Preparation for Delivery

Remarks – Recommended Use of SACC Item

Contracting officers are to insert the specified information in the blanks as 
follows:
(1) - Contract Item number(s);
(2) - CFTPO number;
(3) - Date on the CFTPO.

Legal text for SACC item

Preparation for delivery for item(s) __(1)___ shall be in accordance with 
Canadian Forces Transportation Packaging Order - CFTPO- ___(2)___, dated__(
3)___.



2000-05-12SupersededD0007DARCHIVED Preparation for Delivery
1996-05-01SupersededD0007DARCHIVED Preparation for Delivery

D0008C

Effective Date
Item Status
ID
Title
2000-12-01CancelledD0008CARCHIVED Delivery

Remarks – Recommended Use of SACC Item

Use this clause in contracts when the deliverables must arrive on or before a 
specific date.

Legal text for SACC item

All deliverables shall be received by the Technical Authority on or before _____. 


1998-06-15SupersededD0008CARCHIVED Delivery
1991-06-01SupersededD0008CARCHIVED Delivery

D0009C

Effective Date
Item Status
ID
Title
2014-06-26ActiveD0009CDelivery - Contract

Remarks – Recommended Use of SACC Item

Use the following clause in contracts for goods when inspection and shipment dates are required. This clause should not be used for Department of National Defence contracts.

Legal text for SACC item

Goods must be ready for inspection within _____ days from effective date of the Contract, and shipment must be made _____ days from date of approval by Canada.

2007-11-30SupersededD0009CARCHIVED Delivery

D0009D

Effective Date
Item Status
ID
Title
1995-12-15SupersededD0009DARCHIVED Delivery

Remarks – Recommended Use of SACC Item

This clause should not be used in National Defence contracts.

Legal text for SACC item

Goods shall be ready for inspection within _____ days from date of Contract, 
and shipment shall be made _____ days from date of approval by Inspection 
Authority.

1991-06-01SupersededD0009DARCHIVED Delivery

D0010D

Effective Date
Item Status
ID
Title
1991-06-01SupersededD0010DARCHIVED Delivery

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

It is a condition of the bid that, should the Bidder be awarded a contract, 
   delivery will be made by _____. 

D0010T

Effective Date
Item Status
ID
Title
1992-12-01SupersededD0010TARCHIVED Delivery

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

It is a condition of the bid that, should the Bidder be awarded a contract, 
   delivery will be made by _____. 

D0011T

Effective Date
Item Status
ID
Title
1991-06-01CancelledD0011TARCHIVED Delivery

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

Delivery shall be made within _____ days from receipt of demand on stocked 
   items.  The consignee is to be advised within 72 hours of any delays and 
   prior to back-ordering.  Approved back orders only to be noted on 
   packing slips. 

D0012T

Effective Date
Item Status
ID
Title
1991-06-01CancelledD0012TARCHIVED Delivery

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

While delivery is required by _____, the very best delivery we can make is _____ 
   days from date of order, on the understanding that delivery will be one 
   of the factors considered in the evaluation of bids/proposals. 

D0013D

Effective Date
Item Status
ID
Title
1991-06-01SupersededD0013DARCHIVED Delivery

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

Delivery shall be made within _____ days from receipt of a demand. 

D0014C

Effective Date
Item Status
ID
Title
2007-11-30ActiveD0014CDelivery of Fresh Chilled or Frozen Products

Remarks – Recommended Use of SACC Item

Use the following clause in contracts for fresh chilled or frozen products, if applicable.

Legal text for SACC item

Fresh chilled or frozen products must be delivered in accordance with Canadian Food Inspection Agency requirements stipulating that frozen products must be maintained at -18o C or lower, and fresh chilled products between 4o C and 1o C until delivery. All fresh chilled or frozen products must be delivered in refrigerated vehicles and show no evidence of deterioration. Frozen products must not have been frozen for longer than 90 days since the date of processing in the fresh state.

D0014D

Effective Date
Item Status
ID
Title
1999-06-21SupersededD0014DARCHIVED Fresh Chilled or Frozen Products, Delivery of

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

Fresh chilled or frozen products must be delivered in accordance with 
Canadian Food Inspection Agency definitions stipulating that frozen 
products shall be maintained at -18°C or lower, and fresh chilled preserved 
products no higher than 4°C and no lower than 1°C until delivery.  All 
frozen or fresh chilled preserved products shall be delivered in 
refrigerated vehicles, show no evidence of deterioration and, if a frozen 
product, shall not have been frozen for longer than 90 days since the date 
of processing in the fresh state.


1991-06-01SupersededD0014DARCHIVED Meats, Delivery of

D0015T

Effective Date
Item Status
ID
Title
1991-06-01SupersededD0015TARCHIVED Delivery

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

It is a condition of this bid that all delivery/work must be completed by_____.  
   Failure to indicate agreement to comply with this delivery condition 
   will render your bid non-responsive and no further consideration will be 
   given.  

D0016D

Effective Date
Item Status
ID
Title
1991-06-01CancelledD0016DARCHIVED Ordering Procedures

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

Delivery will be called up by consignee on Request for Delivery, form 
   DSS-MAS 10047 during the period _____ to _____ on a monthly basis in 
   minimum lots per Supply Centre. 

D0017D

Effective Date
Item Status
ID
Title
1991-06-01CancelledD0017DARCHIVED Ordering Procedures

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

Delivery  will  be  called  up by one control source  (i.e. headquarters, 
outside plants branch) for all locations on a monthly basis using form 
DSS-MAS 10047, Request for Delivery.

 

D0018C

Effective Date
Item Status
ID
Title
2007-11-30ActiveD0018CDelivery and Unloading

Remarks – Recommended Use of SACC Item

Use the following clause in contracts for goods when unloading is required without Canada's assistance.

Legal text for SACC item

  1. Delivery trucks must be equipped with an unloading device which will permit unloading at sites with no hydraulic, stationary or other type of unloading facility.
  2. When making deliveries, sufficient personnel must be provided to permit unloading of any type of vehicle without the assistance of federal government personnel.
  3. At some sites, the delivery truck must be unloaded while parked at the curb. When material is placed on the sidewalk, it must be placed in proximity to the designated entrance so as to be readily accessible to transport by mechanical handling equipment utilized by site personnel.

D0018D

Effective Date
Item Status
ID
Title
1998-06-15SupersededD0018DARCHIVED Delivery and Unloading

Remarks – Recommended Use of SACC Item

Use this clause when unloading is required without Canada's assistance.

Legal text for SACC item

1.     Delivery trucks shall be equipped with an unloading device which 
       will permit unloading at sites with no hydraulic, stationary or 
       other type of unloading facility.

2.     When making deliveries, sufficient personnel shall be provided to 
       permit unloading of any type of vehicle without the assistance of 
       federal government personnel.

3.     At some sites, the delivery truck shall be unloaded while parked at 
       the curb. When material is placed on the sidewalk, it shall be 
       placed in proximity to the designated entrance so as to be readily 
       accessible to transport by mechanical handling equipment utilized by 
       site personnel.

1991-06-01SupersededD0018DARCHIVED Delivery to Outside Plants

D0019D

Effective Date
Item Status
ID
Title
2004-12-10CancelledD0019DARCHIVED Handling of Trucks

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

In view of operating problems that may result from handling trucks 
exceeding 3.66 m x 15.24 cm (12 ft. x 6 in.) in height in the lower level 
of the Printing Bureau, Gatineau, Quebec, it is mandatory that deliveries 
be made in vehicles not exceeding 3.66 m x 15.24 cm (12 ft. x 6 in.) when 
empty.


1991-06-01SupersededD0019DARCHIVED Trucks, Handling of

D0020D

Effective Date
Item Status
ID
Title
1998-06-15CancelledD0020DARCHIVED Delivery Responsibility - Contractor

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

Rental equipment will be delivered and picked up from Consignee at no 
charge to Canada.
 
1991-06-01SupersededD0020DARCHIVED Delivery

D0021D

Effective Date
Item Status
ID
Title
2003-05-30CancelledD0021DARCHIVED Delivery Responsibility - Canada

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

The Consignee shall pick up the equipment and return same at Canada's 
expense.

1998-06-15SupersededD0021DARCHIVED Delivery Respondibility - Canada
1991-06-01SupersededD0021DARCHIVED Delivery

D0022D

Effective Date
Item Status
ID
Title
1991-06-01CancelledD0022DARCHIVED Metered Trucks

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

1.  Delivery trucks must be equipped with meters capable of giving printed 
meter slips.

2. The Contractor is to provide printed meter slips for each delivery of 
petroleum products.

3. Meters will measure in litres. 

D0023D

Effective Date
Item Status
ID
Title
1991-06-01CancelledD0023DARCHIVED Vessel - Delivery

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

The vessel shall be delivered to the Contractor's facility on _____ and on 
   completion of the Work delivered to the Crown at the Contractor's 
   facility on or before _____.

D0024C

Effective Date
Item Status
ID
Title
2008-05-12ActiveD0024CLiquidated Damages

Remarks – Recommended Use of SACC Item

Use the following clause in contracts for goods or services when liquidated damages will be included in the contract.

Legal text for SACC item

  1. If the Contractor fails to _________ (insert "deliver the goods" or "perform the services") within the time specified in the Contract, the Contractor agrees to pay to Canada liquidated damages in the amount of $ _____ for each calendar day of delay. The total amount of the liquidated damages must not exceed _____ percent of the contract price.
  2. Canada and the Contractor agree that the amount stated above is their best pre-estimate of the loss to Canada in the event of such a failure, and that it is not intended to be, nor is it to be interpreted as, a penalty.
  3. Canada will have the right to hold back, drawback, deduct or set off from and against the amounts of any monies owing at any time by Canada to the Contractor, any liquidated damages owing and unpaid under this section.
  4. Nothing in this section must be interpreted as limiting the rights and remedies which Canada may otherwise have under the Contract.

D0024D

Effective Date
Item Status
ID
Title
1997-09-15SupersededD0024DARCHIVED Liquidated Damages

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

In the event the Contractor fails to deliver the supplies or perform the 
services within the time specified in the Contract, the Contractor agrees 
to pay to Canada as liquidated damages the sum of $ _____ for each calendar 
day of delay up to a maximum of _____ days, subject to the limitation that 
the total amount of liquidated damages shall not exceed _____ percent of 
the Contract Price.  The Parties agree that the aforesaid amount is their 
best pre-estimate of the loss to Canada in the event of such a failure, and 
that it is not intended to be, nor is it to be construed as, a penalty.

Canada shall have the right to hold back, drawback, deduct or set off from 
and against the amounts of any monies owing at any time by Canada to the 
Contractor, any liquidated damages owing and unpaid under this article.

Nothing in this article is to be interpreted as limiting the rights and 
remedies which Canada or the Minister may otherwise be entitled to under 
the Contract.



1993-10-29SupersededD0024DARCHIVED Liquidated Damages

D0025D

Effective Date
Item Status
ID
Title
1997-09-15SupersededD0025DARCHIVED Period of Work

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

The Work is to be performed during the period _____ to _____.  
1993-10-29SupersededD0025DARCHIVED Period of Contract

D0030D

Effective Date
Item Status
ID
Title
2004-12-10CancelledD0030DARCHIVED Supplier Contacts

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

Name and telephone number of the person responsible for :

General enquiries

Name: __________________________

Telephone No. _____________

Facsimile No. ______________

E-mail address: ___________________

Delivery follow-up

Name: ___________________________

Telephone No. ______________

Facsimile No. _______________

E-mail address: ____________________


2001-05-25SupersededD0030DARCHIVED Supplier Contacts
1995-03-31SupersededD0030DARCHIVED Supplier Contacts

D0035C

Effective Date
Item Status
ID
Title
2022-12-01ActiveD0035CShipping instructions (Department of National Defence): Foreign-based contractors

Remarks – Recommended Use of SACC Item

Use the following clause in contracts described below when the contractor is located outside of Canada and the Department of National Defence (DND) is responsible for shipping:

  1. sole source contracts for goods;
  2. all repair and overhaul contracts where transportation was not part of the competitive bid; and
  3. contracts for United States Foreign Military Sales.

Use this clause in conjunction with C2608C for all shipments when DND will be the importer; and with C2610C when DND will be the importer and the contract value is CAN$250,000 or more.

Legal text for SACC item

  1. Delivery will be FCA Free Carrier at _________ (insert the named place, e.g. Contractor's facility) Incoterms 2000. The Contractor must load the goods onto the carrier designated by the Department of National Defence (DND). Onward shipment from the delivery point to the consignee will be Canada's responsibility
  2. Before shipping the goods, the Contractor must contact the following DND Inbound Logistics Coordination Center by facsimile or email, to arrange for shipment, and provide the information detailed at paragraph 3.
    Instruction to contracting officers: Before contract award, choose either shipping option (a), (b), (c), or (d), and delete the unused options and this instruction.
    1. Insert the following when the Contractor is located in the United States (U.S.):
      Inbound Logistics Coordination Center (ILCC):
      Telephone: 1-877-447-7701 (toll free)
      Facsimile: 1-877-877-7409 (toll free)
      Email: ILHQOttawa@forces.gc.ca
      OR
    2. Insert the following when the Contractor is located in United Kingdom (UK) and Ireland:
      Inbound Logistics United Kingdom (ILUK):
      Telephone: 011-44-1895-613023, or 011-44-1895-613024, or
      Facsimile: 011-44-1895-613046
      Email: CFSUEDetUKMovements@forces.gc.ca
      In addition, the Contractor must send to ILUK the completed form "Shipping Advice and Export Certificate" by email to: CFSUEDetUKMovements@forces.gc.ca.
      The shipment of any items above the value of 600 GBP (pound sterling) being exported from the United Kingdom and Ireland will be cleared by DND using His Majesty's Customs & Excise (HMCE) New Export Systems (NES). The Contractor must comply with HMCE requirements by registering with HMCE or by having a freight forwarder complete the entry. A printed copy of the NES entry Export Declaration clearly displaying the Declaration Unique Consignment Reference Number must be provided by the Contractor and attached to the consignment. The Contractor must ensure that this procedure is carried out for all stores whether they be initial purchase or repair and overhaul export items. HMCE will authorize Canadian Forces Support Unit (Europe) to ship the goods only if the procedure has been adhered to completely and properly by the Contractor. Note: To ensure you receive a reply on any contracting information such as Incoterms etc, always include the email address: ILHQcontract-ILHQcontrat@forces.gc.ca in carbon copy (cc).
      OR
    3. Insert the following when the Contractor is located in a country other than Canada, the U.S., the UK and Ireland:
      Inbound Logistics Europe Area (ILEA):
      Telephone: +49-(0)-2203-908-1807 or 2748 or 5304
      Facsimile: +49-(0)-2203-908-2746
      Email: ILEA@forces.gc.ca
      Note: To ensure you receive a reply on any contracting information such as Incoterms etc, always include the email address: ILHQcontract-ILHQcontrat@forces.gc.ca in carbon copy (cc).
      OR
    4. Insert the following for U.S. Foreign Military Sales (FMS):
      Inbound Logistics Coordination Center (ILCC):
      Telephone: 1-877-447-7701 (toll free)
      Facsimile: 1-877-877-7409 (toll free)
      Email: ILHQOttawa@forces.gc.ca
      Canada is responsible for the carrier selection for shipments of the goods supplied under this FMS contract. Instructions on how to obtain carrier selection from Canada are contained in U.S. Department of Defense 4000.25-8-M, Military Assistance Program Address Directory, and Canadian Special Instructions Indicator (SII). The Contractor must not ship the goods until the SII has been complied with.
    Instruction to contracting officers: Insert the following paragraphs 3 through 7 with all options above, except (d) - U.S. FMS, and delete this instruction.
  3. The Contractor must provide the following information to the DND Inbound Logistics contact when arranging for shipment:
    1. the Contract number;
    2. consignee address (if multiple addresses, items must be packaged and labeled separately with each consignee address);
    3. description of each item;
    4. the number of pieces and type of packaging (e.g. carton, crate, drum, skid);
    5. actual weight and dimensions of each piece type, including gross weight;
    6. copy of the commercial invoice (in accordance with clause C2608C, section 4, of the Standard Acquisition Clauses and Conditions Manual) or a copy of the Canada Border Services Agency form CI1 Canada Customs Invoice (PDF 429KB) - (Help on File Formats);
    7. Schedule B codes (for exports) and the Harmonized Tariff Schedule codes (for imports);
    8. Canada-United States-Mexico Agreement Certification of Origin (in accordance with clause C2608C, section 2) for the U.S. and Mexico only;
    9. full details of dangerous material, as required for the applicable mode of transportation, signed certificates for dangerous material as required for shipment by the International Maritime Dangerous Goods Code, or International Air Transport Association regulations or the applicable Canadian Dangerous Goods Shipping Regulations and a copy of the safety data sheet.
  4. Following receipt of this information by Canada, Canada will provide the appropriate shipping instructions, which may include the requirement for specific consignee address labelling, the marking of each piece with a Transportation Control Number and customs documentation.
  5. The Contractor must not ship goods before receiving shipping instructions from the DND Inbound Logistics contact.
  6. If the Contractor delivers the goods at a place and time that are not in accordance with the given delivery instructions or fail to fulfill reasonable delivery instructions given by Canada, the Contractor must reimburse Canada any additional expenses and costs incurred.
  7. If Canada is responsible for delays in delivering the goods, ownership and risk will be transferred to Canada upon expiry of either 30 days following the date on which a duly completed shipping application is received by Canada or by its appointed forwarding agent, or 30 days following the delivery date specified in the Contract, whichever is later.
2020-07-01SupersededD0035CARCHIVED Shipping instructions (Department of National Defence): Foreign-based contractors
2018-06-21SupersededD0035CARCHIVED Shipping instructions (Department of National Defence): Foreign-based contractors
2017-08-17SupersededD0035CARCHIVED Shipping instructions (Department of National Defence): Foreign-based contractors
2010-01-11SupersededD0035CARCHIVED Shipping Instructions (Department of National Defence) - Foreign-based Contractors
2007-11-30SupersededD0035CARCHIVED Shipping Instructions (DND) - Foreign-based Contractors

D0035D

Effective Date
Item Status
ID
Title
2005-12-16SupersededD0035DARCHIVED DND Shipping Instructions - International - Delivery at Origin

Remarks – Recommended Use of SACC Item

Use the following clause for Department of National Defence (DND) sole source 
contracts, and all repair and overhaul contracts where transportation is not 
part of the competitive bid and when DND is responsible for shipping (clauses 
C2608D and C2610D may apply). 

This clause does not apply to United States Foreign Military Sales contracts 
(see clause D0038D).

Legal text for SACC item

For contracts let on behalf of the Department of National Defence, delivery 
shall be FCA Free Carrier _________ (Insert the named place, e.g. 
Contractor's Facility) Incoterms 2000, and onward shipment from the 
delivery point to the consignee shall be the responsibility of Canada.  
(Choose only one of the shipping options under(a) and delete 
the others.)

(a)    At least ten (10) working days prior to the goods being available 
       for shipment, or as soon as possible thereafter, the Contractor 
       shall send notification in writing, or when urgency dictates by 
       telephone or facsimile message confirmed in writing, to:

       (i)    For contracts let in United Kingdom (UK) and Ireland

              Canadian Forces Support Unit (Europe) * (CFSU[E])
              ATTENTION:  WO IC Movements
              CFSU(E) Daws Hill
              RAF Daws Hill
              P.O. Box 5051
              High Wycombe, UK
              Buckinghamshire HP11 1UY England

              Telephone:    011 44 1494 795668, OR
                            011 44 1494 795669, OR
                            011 44 1494 795670
              Facsimile:    011 44 1494 795784
              Email:        DawsHillMovement@forces.gc.ca
              Web site:     http://www.cfsue.de/DawsHill/Welcome_e.htm

              * For all UK and Ireland shipments, the Contractor shall send 
              notification in writing by completing the form "Shipping 
              Advice and Export Certificate" available by e-mail at: 
              DawsHillMovement@forces.gc.ca, and at a later date at the 
              following Website address: http://www.cfsue.de/DawsHill/
              Welcome_e.htm.

       (ii)   For contracts let in Continental Europe, including 
              Scandinavian Countries

              Inbound Logistics Europe Area
              ATTENTION: Canadian Forces Support Unit (Europe) (CFSU[E])
              Selfkant Kaserne
              Quimperle Str 100
              D-52511 Geilenkirchen, Germany

              Telephone:    +49-(0)-2451-910625
              Facsimile:    +49-(0)-2451-910626
              Email:               CFSUEMovement@forces.gc.ca.

       (iii)  For contracts let in the United States (not including FMS) 
              and in all other locations (excluding those locations 
              detailed above and Canada)

              Inbound Logistics Headquarters
              ATTENTION: Canadian Forces Director Supply Chain Operations 
              (DSCO)
              4900 Yonge Street
              Toronto, Ontario
              Canada   M2M 6B7

              Telephone:    DSCO Auto Attendant: (416) 635-4405, ext. 6077 
                            / 6103 / 6104 / 6111 / 6112. 
                            Supervisor at 1-877-447-7701 (Toll free), ext. 
                            6101 

              Facsimile:    (416) 635-2757 / 2758 or 1-877-877-7409 (Toll 
              free)

              Email:        QA Toronto@forces.gc.ca.

(b)    The Contractor shall provide the following information:

       (i)    the Contract number and financial coding;

       (ii)   the consignee address;

       (iii)  a description of each item including item number, quantity, 
              NATO Stock Number, export / harmonized tariff number, part 
              number and serial number (if applicable);

              Note:  In the United States, the export tariff is commonly 
                     called "Schedule B" and can be found at: http://www.customs.ustreas.gov
                     /xp/cgov/export and/or 
                     http://www.census.gov/foreign-trade/schedules/
                     b/index.html.

       (iv)   the number of pieces or cases;

       (v)    the actual weights and dimensions including gross weight and 
              total cubic measurement;

       (vi)   the total value; and

       (vii)  full details of, and signed certificates for, dangerous 
              material, as required for shipment by the International 
              Maritime Dangerous Goods Code, or International Air 
              Transportation Association regulations or the applicable 
              Canadian Dangerous Goods Shipping regulations.

       The Contractor shall report separately any piece measuring over 2.74 
       m (108 in.) long x 2.23 m (88 in.) wide x 1.37 m (54 in.) high and/
       or weighing 2268 kg (5000 lbs) or more.

(c)    Following receipt of this information by Canada, Canada shall 
       provide the appropriate shipping instructions, which may include the 
       requirement for specific consignee address labelling, the marking of 
       each piece with a Transportation Control Number and customs 
       documentation.

(d)    Under no circumstances shall the Contractor ship goods prior to 
       receipt of shipping instructions.

(e)    Should the Contractor deliver the goods at a place and time which 
       are not in accordance with the given delivery instructions or fail 
       to fulfil reasonable delivery instructions given by Canada, the 
       Contractor shall reimburse Canada any additional expenses and costs 
       thereby incurred.

(f)    Should delays by Canada delay delivery of the goods, ownership and 
       risk shall transfer to Canada upon the expiry of thirty (30) days 
       following the date on which a duly completed shipping application is 
       received by Canada or its appointed forwarding agent, or thirty (30) 
       days following the delivery date specified in the Contract, 
       whichever is later.

(g)    For all UK and Ireland shipments, any items above the value of 600 
       GBP (pound sterling) being exported from the UK will require the 
       shipment to be correctly cleared using Her Majesty's Customs & 
       Excise (HMCE) New Export Systems (NES).  Contractors must comply 
       with HMCE requirements by registering with HMCE or by having a 
       freight forwarder complete the entry.  A printed copy of the NES 
       entry "Export Declaration" clearly displaying the "Declaration 
       Unique Consignment Reference Number" must be provided by Contractors 
       and attached to the consignment.  It is the Contractor's 
       responsibility to ensure that this procedure is carried out for all 
       stores whether they be initial purchase or repair and overhaul 
       export items.  If this procedure is NOT adhered to completely and 
       properly, HMCE has instructed CFSU(E) that CFSU(E) cannot arrange 
       shipping of the consignment without the required documentation.

2005-06-10SupersededD0035DARCHIVED DND Shipping Instructions - International - Delivery at Origin
2004-12-10SupersededD0035DARCHIVED DND Shipping Instructions - International - Delivery at Origin
2003-12-12SupersededD0035DARCHIVED Shipping Instructions - International - DND
2003-05-30SupersededD0035DARCHIVED Shipping Instructions - Europe
1999-12-13SupersededD0035DARCHIVED Shipping Instructions - Europe
1996-10-30SupersededD0035DARCHIVED Shipping Instructions - Europe

D0036D

Effective Date
Item Status
ID
Title
2005-12-16SupersededD0036DARCHIVED Delivery to Offshore Locations

Remarks – Recommended Use of SACC Item

Use this clause for goods originating in the United States or Canada for 
delivery to offshore locations.

Legal text for SACC item

1.     For goods that are to be exported to offshore locations, the 
       following procedures shall be followed:

       (a)    the shipment shall be FOB common carrier Contractor's plant.  
              At least ten (10) days prior to the goods being available for 
              shipment, the Contractor shall send notification in writing, 
              or when urgency dictates by telephone or facsimile message 
              confirmed in writing, to:

              Director Supply Chain Operations / Customs
              National Defence Headquarters
              MGen George R. Pearkes Building
              101 Colonel By Drive
              Ottawa, ON   K1A 0K2

              Telephone:    (613) 995-0834, or
              Facsimile:    (613) 992-9921

              advising the following details:

              (i)    contract identity;
              (ii)   consignee;
              (iii)  number of pieces;
              (iv)   description;
              (v)    dimensions and weight including cubic measurement; and

       (b)    the Contractor shall report any piece measuring over 8 ft and
              /or weighing over 500 lbs, and

       (c)    the Contractor shall report full details of dangerous 
              materiel as required for shipment in accordance with the 
              International Maritime Organization, or International Air 
              Transportation Association Regulations of the applicable 
              Canadian Dangerous Goods Shipping Regulations.

2.     Upon receipt of this information, Canada will provide the shipping 
       instructions.  The Contractor may be requested to prepay all 
       shipping charges to the export port of loading, or to destination, 
       in which case prepaid charges shall be included as a separate item 
       on the Contractor's invoice and supported by the carrier's freight 
       bill.  No goods shall be shipped prior to receipt of shipping 
       instructions.

2003-12-12SupersededD0036DARCHIVED Delivery to Offshore Locations
1996-10-30SupersededD0036DARCHIVED Delivery to Offshore Locations

D0037C

Effective Date
Item Status
ID
Title
2016-01-28ActiveD0037CShipping Instructions (Department of National Defence) - Canadian-based Contractor

Remarks – Recommended Use of SACC Item

Use the following clause in contracts described below when the contractor is located in Canada and the Department of National Defence is responsible for shipping:

  1. sole source contracts for goods, and
  2. all repair and overhaul contracts where transportation was not part of the competitive bid.

Use this clause in conjunction with C2611C when the contractor is the importer and the contract value is CAN$250,000 or more.

Legal text for SACC item

  1. Delivery will be FCA Free Carrier at ________ (Insert the named place, e.g. Contractor's facility) Incoterms 2000. The Contractor must load the goods onto the carrier designated by the Department of National Defence (DND). Onward shipment from the delivery point to the consignee will be Canada's responsibility.
  2. Before shipping the goods, the Contractor must contact the following DND Inbound Logistics Coordination Center by facsimile or e-mail, to arrange for shipment, and provide the information detailed at paragraph 3.

    Instruction to contracting officers: Before contract award, choose either shipping option (a), (b, (c), (d), or (e), and delete the unused options and this instruction.

    1. Insert the following for all sole source contracts, except repair and overhaul, where the Contractor is located in Canada:
      Inbound Logistics Co-ordination Center (ILCC)
      Telephone: 1-877-877-7423 (toll free)
      Facsimile: 1-877-877-7409 (toll free)
      E-mail: ILHQOttawa@forces.gc.ca
    2. Insert the following for all repair and overhaul contracts where the Contractor is located between Kingston inclusive and westward to the Ontario/Manitoba border:
      Inbound Logistics Central Area (ILCA)
      Telephone: 1-866-371-5420 (toll free)
      Facsimile: 1-866-419-1627 (toll free)
      E-mail: ILCA@forces.gc.ca
    3. Insert the following for all repair and overhaul contracts where the Contractor is located in Manitoba, Saskatchewan, Alberta, British Columbia, and the National Capital Region inclusive to east of Kingston:
      Inbound Logistics Coordination Center (ILCC)
      Telephone: 1-877-877-7423 (toll free)
      Facsimile: 1-877-877-7409 (toll free)
      E-mail: ILHQOttawa@forces.gc.ca
    4. Insert the following for all repair and overhaul contracts where the Contractor is located in Quebec:
      Inbound Logistics Quebec Area (ILQA)
      Telephone: 1-866-935-8673 (toll free), or
      1-514-252-2777, ext. 4673, 2852
      Facsimile: 1-866-939-8673 (toll free), or
      1-514-252-2911
      E-mail: 25DAFCTrafficQM@forces.gc.ca
    5. Insert the following for all repair and overhaul contracts where the Contractor is located in Atlantic (New Brunswick, Prince Edward Island, Nova Scotia, Newfoundland and Labrador):
      Inbound Logistics Atlantic Area (ILAA)
      Telephone: 1-902-427-1438
      Facsimile: 1-902-427-6237
      E-mail: BlogILAA@forces.gc.ca
  3. The Contractor must provide the following information to the DND Inbound Logistics Coordination Center when arranging for shipment:
    1. the Contract number;
    2. consignee address (for multiple addresses, items must be packaged and labelled separately with each consignee address);
    3. description of each item;
    4. the number of pieces and type of packaging (i.e., carton, crate, drum, skid);
    5. actual weight and dimensions of each piece type, including gross weight;
    6. full details of dangerous goods/hazardous products, as required for the applicable mode of transportation, signed certificates for dangerous goods/hazardous products as required for shipment by the International Maritime Dangerous Goods Code, the International Air Transport Association regulations or the applicable Canadian Transportation of Dangerous Goods Regulations, and a copy of the safety data sheet in English and French.
  4. Following receipt of this information by Canada, Canada will provide the appropriate shipping instructions, which may include the requirement for specific consignee address labelling, and the marking of each piece with a Transportation Control Number.
  5. The Contractor must not ship the goods before receiving shipping instructions from the DND Inbound Logistics contact.
  6. If the Contractor delivers the goods at a place and time which are not in accordance with the given delivery instructions or fail to fulfill reasonable delivery instructions given by Canada, the Contractor must reimburse Canada any additional expenses and costs incurred.
  7. If Canada is responsible for delays in delivering the goods, ownership and risk will be transferred to Canada upon expiry of either 30 days following the date on which a duly completed shipping application is received by Canada or by its appointed forwarding agent, or 30 days following the delivery date specified in the Contract, whichever is later.
2015-02-25SupersededD0037CARCHIVED Shipping Instructions (Department of National Defence) - Canadian-based Contractor
2011-05-16SupersededD0037CARCHIVED Shipping Instructions (Department of National Defence) - Canadian-based Contractor
2010-01-11SupersededD0037CARCHIVED Shipping Instructions (DND) - Canadian-based Contractor
2007-11-30SupersededD0037CARCHIVED Shipping Instructions (DND) - Canadian-based Contractor

D0037D

Effective Date
Item Status
ID
Title
2005-12-16SupersededD0037DARCHIVED DND Shipping Instructions - Canada - Delivery at Origin

Remarks – Recommended Use of SACC Item

Use the following clause for Department of National Defence (DND) sole source 
contracts, and all repair and overhaul contracts where transportation is not 
part of the competitive bid, let in Canada when DND is responsible for shipping.

Legal text for SACC item

For contracts let on behalf of the Department of National Defence (DND) in 
Canada, delivery shall be FCA Free Carrier ________ (Insert the named place, 
e.g. Contractor's Facility) Incoterms 2000, and onward shipment from the 
delivery point to the consignee shall be the responsibility of Canada.

(a)    Shipping Instructions

       The Incoterms 2000 that is applicable to the delivery on this 
       contract is FCA Free Carrier ________ (Insert the named place, e.g. 
       Contractor's Facility) Incoterms 2000.  The Contractor will be 
       responsible to load the materiel onto the DND designated carrier.

(b)    For materiel pick up: prior to shipping of materiel, the Contractor 
       shall advise the following contact by telephone or facsimile to 
       arrange for shipment:

       For Canadian contractors

       Inbound Logistics Headquarters
       ATTENTION: Canadian Forces Director Supply Chain Operations (DSCO)
       4900 Yonge Street
       Toronto, Ontario
       Canada  M2M 6B7
       
       Telephone:    DSCO Auto Attendant: (416) 635-4405, ext. 6077 / 6103 
                     / 6104 / 6111 / 6112
                     Supervisor: 1-877-447-7701 (toll free), ext. 6101

       Facsimile:    (416) 635-2757 / 2758 or 1-877-877-7409 (toll free).

(c)    Under no circumstances shall the Contractor ship goods prior to 
       receipt of shipping instructions.

(d)    Should the Contractor deliver the goods at a place and time which 
       are not in accordance with the given delivery instructions or fail 
       to fulfil reasonable delivery instructions given by Canada, the 
       Contractor shall reimburse Canada any additional expenses and costs 
       thereby incurred.

(e)    Should delays by Canada delay delivery of the goods, ownership and 
       risk shall transfer to Canada upon the expiry of thirty (30) days 
       following the date on which a duly completed shipping application is 
       received by Canada or its appointed forwarding agent, or thirty (30) 
       days following the delivery date specified in the Contract, 
       whichever is later.  

2004-12-10SupersededD0037DARCHIVED DND Shipping Instructions - Canada - Delivery at Origin
2003-12-12SupersededD0037DARCHIVED Shipping Instructions - Canada - DND

D0038D

Effective Date
Item Status
ID
Title
2004-12-10SupersededD0038DARCHIVED DND Shipping Instructions - Foreign Military Sales

Remarks – Recommended Use of SACC Item

Use this clause for United States Foreign Military Sales contracts when 
Department of National Defence is responsible for shipping (clauses C2608D and 
C2610D may apply).

Legal text for SACC item

Carrier selection for shipments of the material supplied on this Foreign 
Military Sales case is the responsibility of Canada.  Instructions on how 
to obtain carrier selection from Canada is contained in United States 
Department of Defense 4000.25-8-M, Military Assistance Program Address 
Directory, Canadian Special Instructions Indicator (SII).  No shipments are 
to be made until the SII has been complied with.

2003-12-12SupersededD0038DARCHIVED Shipping Instructions - Foreign Military Salae - DND

D0040C

Effective Date
Item Status
ID
Title
2010-08-16ActiveD0040CShipping Surcharges for Large, Bulky or Heavy Items

Remarks – Recommended Use of SACC Item

Use the following clause in the resulting contract of standing offers when Canada will be responsible for the cost of surcharges applied by the carrier for the shipping of large, bulky or heavy items.

Insert this clause in Part 6B - Resulting Contract Clauses, of the 2T-RFSO1 template.

Use this clause in conjunction with D4002C .

Legal text for SACC item

Subject to the following paragraph, Canada will be responsible for the cost of surcharges applied by the carrier for the shipping of individual items weighing more than 30 kilograms or measuring more than 150 centimeters, including packaging.

Before shipping an order, the Contractor must notify the Identified User in writing of the cost of any applicable surcharge. The Contractor must, if requested, provide supporting documentation to the Identified User. The Identified User may, within 24 hours of written notification of the surcharge, cancel its order in whole or in part at no additional cost to Canada by giving written notice to the Contractor. If the Contractor does not notify the Identified User as required in this clause, the Contractor will remain responsible for the cost of the surcharge.

D0050C

Effective Date
Item Status
ID
Title
2007-05-25ActiveD0050CEnd User Certificate

Remarks – Recommended Use of SACC Item

Use the following clause in contracts with United States suppliers when an end user certificate may be requested due to the nature of the goods.

Legal text for SACC item

Canada certifies that the goods, services or both ordered under the Contract are purchased by Canada for the exclusive use of the Canadian Armed Forces.

D2000C

Effective Date
Item Status
ID
Title
2007-11-30ActiveD2000CMarking

Remarks – Recommended Use of SACC Item

Use the following clause in contracts when each item must be stamped or etched for identification purposes.

Legal text for SACC item

The Contractor must ensure that the manufacturer's name and part number are clearly stamped or etched on each item for positive identification purposes.

D2000D

Effective Date
Item Status
ID
Title
1991-06-01SupersededD2000DARCHIVED Marking

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

The manufacturer's name and part number will, if feasible, be clearly 
   stamped or etched on each item to permit positive identification. 

D2001C

Effective Date
Item Status
ID
Title
2007-11-30ActiveD2001CLabelling

Remarks – Recommended Use of SACC Item

Use the following clause in contracts when the manufacturer's and specification numbers must appear on each item, either printed on the container or on an adhesive label.

Legal text for SACC item

The Contractor must ensure that the manufacturer's and specification numbers appear on each item, either printed on the container or on an adhesive label of highest commercial standard affixed to the container.

D2001D

Effective Date
Item Status
ID
Title
1991-06-01SupersededD2001DARCHIVED Labelling

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

Manufacturer's number and specification number, where applicable, shall be 
   on each item either printed on the container or on an adhesive label of 
   highest commercial standard affixed to the container. 

D2003D

Effective Date
Item Status
ID
Title
1991-06-01CancelledD2003DARCHIVED Ownership Identification

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

Ownership identification, naming consignee department, must accompany the 
   vehicle on delivery. 

D2004D

Effective Date
Item Status
ID
Title
1991-06-01CancelledD2004DARCHIVED Labelling

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

Each box, carton, package, etc., shall be labelled showing in block letters 
   at one end the: quantity (of sheets, book/pads, sets, forms or envelopes), 
   size, title, form number, requisition number, and if applicable, serial 
   number of contents. 

D2005D

Effective Date
Item Status
ID
Title
1991-06-01CancelledD2005DARCHIVED Packaging and Labelling

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

In accordance with the "Packaging and Labelling Instructions: June 1982", 
   already in your possession. 

D2006C

Effective Date
Item Status
ID
Title
2007-11-30ActiveD2006CMarking and Preparation of Paper

Remarks – Recommended Use of SACC Item

Use the following clause in contracts for marking and preparation of paper for shipment in accordance with the Canadian General Standards Board standard.

Use this clause in conjunction with B4003T .

Legal text for SACC item

  1. Basic Pack - Commercial Standard
  2. Bulk Pack:
    1. Stock Number (Product Code);
    2. Item Description;
    3. Unit of Issue;
    4. Quantity;
    5. Batch Number or Contract Number;
    6. Name and address of Consignee;
    7. Name and address of the Contractor.
  3. In addition, marking and preparation for shipment by the Contractor must be in accordance with Canadian General Standards Board standard 43-GP-103P, Packaging of Paper, Printing and Stationary.
  4. Failure to comply with the requirement above will result in return for repacking or reworking or both at the Contractor's expense.

D2006D

Effective Date
Item Status
ID
Title
2002-12-13SupersededD2006DARCHIVED Labelling

Remarks – Recommended Use of SACC Item

Use this clause in conjunction with B4003T.

Legal text for SACC item

1.     BASIC PACK - Commercial Standard

2.     BULK PACK:

       (a)    Stock Number (Product Code);
       (b)    Item Description;
       (c)    Unit of Issue;
       (d)    Quantity;
       (e)    Batch Number or Contract Number;
       (f)    Name and address of Consignee;
       (g)    Name and address of Supplier.

3.     In addition, marking and preparation for shipment shall be in 
       accordance with Canadian General Standards Board standard 43-GP-103P, 
       Packaging of Paper, Printing and Stationary.

4.     Failure to comply with the above will result in return for repacking 
       or reworking or both at the Contractor's expense.


1997-09-15SupersededD2006DARCHIVED Labelling
1991-06-01SupersededD2006DARCHIVED Labelling

D2007D

Effective Date
Item Status
ID
Title
1991-06-01SupersededD2007DARCHIVED Packaging, Marking and Preparation

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

PACKAGING, MARKING AND PREPARATION FOR SHIPMENT:

Packaging - Commercial Standard

Labelling

- Basic Pack: Commercial Standard

- Bulk Pack: Stock Number (Product Code)

       Item Description
       Unit of Issue
       Quantity
       Batch Number or
       Contract Number
       Name and Address of Consignee
       Name and Address of Supplier 

D2008D

Effective Date
Item Status
ID
Title
1997-09-15CancelledD2008DARCHIVED Marking - Repaired Equipment

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

All equipment after repair is to be marked with the Department of National 
Defence property mark and NATO Stock Number. Such markings are to be so 
located that the serviceability or functional use of the equipment will not 
be affected.

1991-06-01SupersededD2008DARCHIVED Marking - Repaired Equipment

D2009D

Effective Date
Item Status
ID
Title
1991-06-01CancelledD2009DARCHIVED Marking - Dial Instruments

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

All dial instruments are to have minor markings of fluorescent compound 
   MIL-L-25142 and major markings and pointers in self-luminous compound 
   RCAF Spec. Mat-1-2 _____.            

D2010D

Effective Date
Item Status
ID
Title
1991-06-01CancelledD2010DARCHIVED Marking (Labels)

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

Preprinted labels will not be supplied by the Department of National 
   Defence.  Contractor's labels must be clearly marked "Property of the 
   Department of National Defence".  

D2011D

Effective Date
Item Status
ID
Title
1992-12-01CancelledD2011DARCHIVED Markings - Identification

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

Identification markings of Canadian military property shall be in 
   accordance with Canadian Forces Standard D-02-002-001/SG-001.  
1991-06-01SupersededD2011DARCHIVED Markings - Identification

D2012D

Effective Date
Item Status
ID
Title
1996-10-30CancelledD2012DARCHIVED Chain Cable and Associated Equipment

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

The Contractor shall clearly stamp each item of chain cable with an 
individual Classification Society Test Certificate number, and shall, at 
the time of shipment, forward by mail to the consignee an original and 
duplicate Classification Society Test Certificate for each such item.

D2015C

Effective Date
Item Status
ID
Title
2010-01-11ActiveD2015CAdditional Package Markings - Identical

Remarks – Recommended Use of SACC Item

Use the following clause in contracts when the Department of National Defence requires additional package markings and the same markings apply to all items.

Consult clause D2016C when the additional package markings are different for some items.

Contracting officer must insert all applicable information in the second blank of paragraph 1:

  1. specification number;
  2. manufacturer's name;
  3. drawing number;
  4. batch or lot number;
  5. qualification number;
  6. cure date of rubber components;
  7. data required by the contract or by the commodity specification;
  8. date of manufacture;
  9. date of repair or overhaul;
  10. name of repair or overhaul contractor;
  11. modification status;
  12. serial number; and
  13. expiration date of shelf life.

Legal text for SACC item

  1. The Contractor must ensure that in addition to the required interior and exterior package markings, the following information is provided: _______.

    Instruction to contracting officers: Insert: "For item(s) _______ :" when the information is not required for all items.

    1. ___________;
    2. ___________.
  2. These markings must be applied and positioned in accordance with Canadian Forces Packaging Specification D-LM-008-002/SF-001.
2007-05-25SupersededD2015CARCHIVED Additional Package Markings

D2015D

Effective Date
Item Status
ID
Title
2004-05-14SupersededD2015DARCHIVED Package Markings - Additional

Remarks – Recommended Use of SACC Item

Use this clause to define Department of National Defence's requirement for more 
detailed package markings.  Choose from the following listing:

(a) 	specification number (type, grade, class) of item;
(b) 	manufacturer's name;
(c) 	manufacturer's part or drawing number;
(d) 	manufacturer's batch of serial number;
(e) 	qualification number;
(f) 	cure date of rubber components;
(g) 	other data required by the contract or by the commodity specification;
(h) 	date of repair or overhaul;
(i) 	date of manufacture;
(j) 	name of repair or overhaul contractor;
(k) 	modification status; and
(l) 	serial number of item.

Legal text for SACC item

1.     The Contractor shall ensure that markings on interior and exterior 
       packages of item(s) ____ include special markings.

2.     List of markings required: ____

3.     These markings shall be applied and positioned in accordance with 
       Canadian Forces Packaging Specification D-LM-008-002/SF-001.


D2016C

Effective Date
Item Status
ID
Title
2010-01-11ActiveD2016CAdditional Package Markings - Different

Remarks – Recommended Use of SACC Item

Use the following clause in contracts when the Department of National Defence requires additional package markings and the markings will be different for some items.

Consult clause D2015C when the additional package markings are the same for all items.

Contracting officer must identify the item number and insert all applicable information in paragraph 1:

  1. specification number;
  2. manufacturer's name;
  3. drawing number;
  4. batch or lot number;
  5. qualification number;
  6. cure date of rubber components;
  7. data required by the contract or by the commodity specification;
  8. date of manufacture;
  9. date of repair or overhaul;
  10. name of repair or overhaul contractor;
  11. modification status;
  12. serial number; and
  13. expiration date of shelf life.

Legal text for SACC item

  1. The Contractor must ensure that in addition to the required interior and exterior package markings, the following information is provided:
    For item(s) ___________:
    1. __________ ;
    2. __________ ;
    For item(s) ________ :
    1. __________ ;
    2. __________ ;
  2. These markings must be applied and positioned in accordance with Canadian Forces Packaging Specification D-LM-008-002/SF-001.
2007-05-25SupersededD2016CARCHIVED Additional Package Markings

D2017C

Effective Date
Item Status
ID
Title
2008-05-12ActiveD2017CBar Coding - Material Marking

Remarks – Recommended Use of SACC Item

Use the following clause in contracts when the requirement and the fill-in information is identified by the Department of National Defence procurement and finance staff generating the requisition.

Use this clause in conjunction with B4060C .

Legal text for SACC item

The Contractor must apply bar code information on items _______ (insert the list) with the Permanent System Control Number (PSCN) or NATO Stock Number (NSN) provided elsewhere in the Contract or by the Department of National Defence (DND), using bar code standard UCC/EAN-128 (Uniform Code Council/EAN International) with Application Identifier 241 for PSCN or 7001 for NSN. Below the bar code symbol, the Contractor must apply the Human-Readable Interpretation (HRI) markings.

These markings must be applied and positioned in accordance with Department of National Defence standard D-02-002-001/SG-001, Identification Marking Of Canadian Military Property (in effect at the closing date of the bid solicitation), and must be of such quality that it will remain readable for the expected life of the item. The bar code must be imprinted upon material which will be compatible with the item to which it is to be attached, which items include, but are not limited to, items constructed of plastic, metal, cloth, synthetics or paper, or a combination of two or more of them.

D2017D

Effective Date
Item Status
ID
Title
2004-05-14SupersededD2017DARCHIVED Bar Coding - Material Marking

Remarks – Recommended Use of SACC Item

The requirement for this clause will be identified by the Department of National 
Defence procurement and finance staff generating the requisition.  They will 
also be responsible for providing the fill-in information.  This clause should 
be used in conjunction with B4060D.

Legal text for SACC item

The Contractor shall apply bar code information on items _______ (Insert 
list) with the Permanent System Control Number (PSCN) or NATO Stock Number 
(NSN) provided elsewhere in this document or by the Department of National 
Defence (DND), using bar code standard UCC/EAN-128 (Uniform Code Council/
EAN International) with Application Identifier 241 for PSCN or 7001 for NSN.  
Below the bar code symbol, the Contractor shall apply the Human-Readable 
Interpretation (HRI) markings.

These markings must be applied and positioned in accordance with DND 
standard D-02-002-001/SG-001, Identification Marking of Canadian Military 
Property (in effect at the closing date of the Request for Proposal), and 
must be of such quality that it will remain readable for the expected life 
of the item.  The bar code shall be imprinted upon material which will be 
compatible with the item to which it is to be attached, which items include, 
but are not limited to, items constructed of plastic, metal, cloth, 
synthetics or paper, or a combination of two or more of them.

D2020C

Effective Date
Item Status
ID
Title
2008-05-12ActiveD2020CBar Coding - Package Marking

Remarks – Recommended Use of SACC Item

Use the following clause in contracts for goods, and in repair and overhaul services contracts. The clause defines the bar code requirement for content identification of Department of National Defence's (DND) packaged military equipment, in particular for items of a repairable nature or military purpose.

The requirement for this clause will be identified by the DND procurement staff generating the requisition. They will also be responsible for providing the fill-in information, as follows: in the first blank, the item number(s) will be inserted; in the second blank, the bar code's Application Identifier number, as shown in the list below, will be inserted:

  • 7001 for the NATO Stock Number (NSN)
  • 241 for the Permanent System Control Number (PSCN)
  • 21 for the item's serial number
  • 400 for the Contract Serial Number

Legal text for SACC item

  1. The Contractor must apply, on the package, bar code information for item(s) ______ , with Application Identifier(s) ____ , using bar code symbology UCC/EAN-128 (Uniform Code Council/EAN International). Below the bar code symbol, the Contractor must apply the Human-Readable Interpretation (HRI) markings.
  2. The bar code marking(s) must be legible, applied to a printable surface or label and positioned in accordance with the Canadian Forces Packaging Specification D-LM-008-002/SF-001, Marking for Storage and Shipment (in effect at the closing date of the bid solicitation).

D2020D

Effective Date
Item Status
ID
Title
2004-05-14SupersededD2020DARCHIVED Bar Coding - Package Marking

Remarks – Recommended Use of SACC Item

Use the following clause in contracts for the procurement of goods, and in 
repair and overhaul services contracts.  The clause defines the bar code 
requirement for content identification of Department of National Defence's (DND) 
packaged military equipment, in particular for items of a repairable nature or 
military purpose. 

The requirement for this clause will be identified by the DND procurement staff 
generating the requisition.  They will also be responsible for providing the 
fill-in information, as follows: in the first blank, the item number(s) will be 
inserted; in the second blank, the bar code's Application Identifier number, as 
shown in the list below, will be inserted:

7001	for the NATO Stock Number (NSN)
241	for the Permanent System Control Number (PSCN)
21	for the item's serial number
400	for the Contract Serial Number

Legal text for SACC item

1.     The Contractor shall apply, on the package, bar code information for 
       item(s) ______, with Application Identifier(s) ____, using bar code 
       symbology UCC/EAN-128 (Uniform Code Council/EAN International).  
       Below the bar code symbol, the Contractor shall apply the 
       Human-Readable Interpretation (HRI) markings.

2.     The bar code marking(s) shall be legible, applied to a printable 
       surface or label and positioned in accordance with the Canadian 
       Forces Packaging Specification, D-LM-008-002/SF-001, Specification 
       for Marking for Storage and Shipping (in effect at the closing date 
       of the Request for Proposal).

D2025C

Effective Date
Item Status
ID
Title
2017-08-17ActiveD2025CWood packaging materials

Remarks – Recommended Use of SACC Item

Use the following clause in all contracts where there is a potential use of wood packaging materials in shipping, such as but not limited to crates, boxes, packing cases, dunnage, pallets, cable drums and spools/reels, which must conform to the International Standards for Phytosanitary Measures No. 15: Regulation of Wood Packaging Material in International Trade (ISPM 15) .

Legal text for SACC item

All wood packaging materials used in shipping must conform to the International Standards for Phytosanitary Measures No. 15: Regulation of Wood Packaging Material in International Trade (ISPM 15).

Pertinent additional information on Canada's import and export programs is provided in the following Canadian Food Inspection Agency policy directives:

D-98-08 - Entry Requirements for Wood Packaging Materials Produced in All Areas Other Than the Continental United States

D-13-01 – Canadian Heat Treated Wood Products Certification Program (HT Program)

2013-11-06SupersededD2025CARCHIVED Wood Packaging Materials
2008-12-12SupersededD2025CARCHIVED Wood Packaging Materials
2007-11-30SupersededD2025CARCHIVED Wood Packaging Materials

D2025D

Effective Date
Item Status
ID
Title
2005-06-10SupersededD2025DARCHIVED Wood Packaging Materials

Remarks – Recommended Use of SACC Item

Use the following clause wherever a potential for international shipping may 
exist.  This policy does not apply to shipments between the continental United 
States and Canada.

Legal text for SACC item

All non-manufactured wood packaging materials used in international 
shipping shall conform to "Guidelines for Regulating Wood Packaging 
Material in International Trade" - ISPM 15 (International Standards for 
Phytosanitary Measures).  The ISPM standard is detailed on the following 
Website: https://www.ippc.int/servlet/BinaryDownloaderServlet/ISPM_15_
English.pdf?filen
ame=1055161712885_ISPM15_e.pdf.

Pertinent additional information on Canada's import and export programs is 
provided in the following Canadian Food Inspection Agency policy directives:

D-98-08 -     Entry Requirements for Wood Packaging Materials Produced in 
              All Areas Other Than the United States (http://www.inspection.gc.ca
              /english/plaveg/protect/dir/d-98-08e.s
html); and

D-01-05 -     The Canadian Wood Packaging Certification Program (CWPCP) for 
              Export (http://www.inspection.gc.ca/english/plaveg/protect/
              dir/d-01-05e.s
html).


2004-05-14SupersededD2025DARCHIVED Wood Packaging Materials

D3000D

Effective Date
Item Status
ID
Title
2002-12-13CancelledD3000DARCHIVED Packaging

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

Packaging shall be in accordance with Canadian General Standards Board 
standard 43-GP-103P, Packaging of Paper, Printing and Stationary.


1991-06-01SupersededD3000DARCHIVED Packaging

D3001D

Effective Date
Item Status
ID
Title
1991-06-01CancelledD3001DARCHIVED Packing

Remarks – Recommended Use of SACC Item

Use the following clause when packing specified in the requisition requires 
"good commercial practice", "highest commercial standards suitable for rail 
transit" or "standard commercial." 

Legal text for SACC item

Items shall be packed to permit application of the lowest transportation 
   rates or charges via the mode of carriage selected/authorized.

D3002C

Effective Date
Item Status
ID
Title
1991-06-01CancelledD3002CARCHIVED Dangerous Goods Transportation

Remarks – Recommended Use of SACC Item

Use the following clause in all Science contracts when dangerous goods must be 
transported during the performance of the work. 

Legal text for SACC item

Items shall be packed to permit application of the lowest transportation 
rates or charges via the mode of carriage authorized by the Minister, 
consistent with applicable laws, by-laws and regulations.

Items shall be packed in accordance with applicable laws, by-laws, and 
regulations relating to dangerous goods.  All items shall be labelled in 
accordance with regulations, specifying hazardous goods by volume and risk. 
The Contractor shall be held liable for any damage caused by or resulting 
from improper labelling and packaging.

All merchandise labels are to be clearly marked with the percentage of 
volume that is a hazardous item.  Failure to do so will result in the 
Contractor being held responsible for damages caused in the movement of 
goods by government vehicles or government personnel.

The Contractor must adhere to all levels of regulations regarding dangerous 
   goods as set forth by federal, provincial and municipal laws and by-laws.

D3003D

Effective Date
Item Status
ID
Title
1991-06-01SupersededD3003DARCHIVED Delivery Standards

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

Method of delivery to conform to the standards of the Canadian Underwriters 
   Association for the storage and handling of liquified petroleum gases as 
   contained in the Canadian Underwriter's Association Pamphlet No. 58. 

D3004C

Effective Date
Item Status
ID
Title
2007-11-30ActiveD3004CType of Transport

Remarks – Recommended Use of SACC Item

Use the following clause in contracts when delivery must be in refrigerated transport.

Legal text for SACC item

Delivery must be made in refrigerated transport. The acceptable temperature range is from 1.5o C to 4oC or (35o F to 40o F).

D3004D

Effective Date
Item Status
ID
Title
1999-06-21SupersededD3004DARCHIVED Type of Transport

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

Delivery shall be made in refrigerated transport. The acceptable 
temperature range shall be from 1.5o to 4oC or (35o to 40oF).

1991-06-01SupersededD3004DARCHIVED Type of Transport

D3005D

Effective Date
Item Status
ID
Title
1997-09-15CancelledD3005DARCHIVED Delivery Standard

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

1.     Methods of delivery shall conform to the National Standard of Canada 
       standard CAN/CGA-B149.2-M95 of the Canadian Gas Association, as 
       amended to date.

2.     METERED TRUCKS:

       (a)    Delivery trucks shall be equipped with meters capable of 
              giving printed meter slips;

       (b)    The Contractor shall provide printed meter slips for each 
              delivery of petroleum products;

       (c)    Meters shall be measured in litres.

1991-06-01SupersededD3005DARCHIVED Delivery Standard

D3006C

Effective Date
Item Status
ID
Title
2007-11-30ActiveD3006CCarcasses

Remarks – Recommended Use of SACC Item

Use the following clause in contracts for carcasses, if applicable.

Legal text for SACC item

The Contractor must hang beef and veal carcasses in the cooler upon delivery.

D3006D

Effective Date
Item Status
ID
Title
1991-06-01SupersededD3006DARCHIVED Carcasses

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

Beef and veal carcasses must be hung in the cooler by the Contractor upon 
   delivery. 

D3007C

Effective Date
Item Status
ID
Title
2007-11-30ActiveD3007CInspection and Stamping

Remarks – Recommended Use of SACC Item

Use the following clause in contracts when inspection by the Canadian Food Inspection Agency is required.

Legal text for SACC item

The Contractor must ensure that inspectors from the Canadian Food Inspection Agency (CFIA) have inspected all meat and meat products, poultry and poultry products, lard, shortening and margarine containing animal fats, and soups containing ingredients of animal origin, and have stamped those products "CFIA inspected for CG" before shipment.

The Contractor must arrange for all such products to be delivered to the consignee either from an establishment registered in accordance with the Meat Inspection Act, 1985, c. 25 (1st Supp.) and the regulations made under that Act, or from a food distributor that purchased the products from such an establishment. Canada will not accept products that have not been stamped by the CFIA.

The Contractor must not permit any food distributor to alter or further process any meats or other products that have been inspected by inspectors from the CFIA.

D3007D

Effective Date
Item Status
ID
Title
1999-06-21SupersededD3007DARCHIVED Inspection and Stamping

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

The Contractor shall ensure that inspectors from the Canadian Food 
Inspection Agency (CFIA) have inspected all meat and meat products, poultry 
and poultry products, lard, shortening and margarine containing animal fats, 
and soups containing ingredients of animal origin, and have stamped those 
products "CFIA inspected for CG" prior to shipment. The contractor shall 
arrange for all such products to be delivered to the consignee either from 
an establishment registered in accordance with the Meat Inspection Act, R.S.C. 
1985, c. 25 (1st Supp.) and the regulations made under that Act, or from a 
food distributor that purchased the products from such an establishment. 
Canada will not accept products that have not been stamped by the CFIA.

The Contractor shall not, and shall not permit any food distributor to, 
alter or further process any meats or other products that have been 
inspected by inspectors from the CFIA.


1991-06-01SupersededD3007DARCHIVED Inspection and Stamping

D3008D

Effective Date
Item Status
ID
Title
1991-06-01SupersededD3008DARCHIVED Dangerous Goods

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

It is the responsibility of the Supplier to ensure proper labelling and 
packaging in the supply and shipping of Hazardous and Dangerous Goods to 
the Government of Canada.

Her Majesty shall not be held liable for any damages caused by improper 
packaging, labelling or carriage of goods.

Suppliers must ensure they adhere to all levels of regulations regarding 
   Dangerous Goods as set forth by federal, provincial and municipal laws, 
   by-laws and acts of Parliament. 

D3009D

Effective Date
Item Status
ID
Title
1998-02-16CancelledD3009DARCHIVED Delivery - Preparation

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

Delivery shall be within sixty (60) days of the date of manufacture stamped 
   on the battery or the smallest unit package and the carton.  Batteries 
   delivered after sixty (60) days of the date of manufacture shall be 
   returned to the Contractor at its expense.
1991-06-01SupersededD3009DARCHIVED Delivery - Preparations

D3010C

Effective Date
Item Status
ID
Title
2016-01-28ActiveD3010CDelivery of Dangerous Goods/Hazardous Products

Remarks – Recommended Use of SACC Item

Use the following clause in contracts when dangerous goods/hazardous products must be transported during the performance of the work.

Legal text for SACC item

  1. The Contractor must mark dangerous goods/hazardous products which are classed as dangerous/hazardous as follows:
    1. shipping container - in accordance with the Transportation of Dangerous Goods Act, 1992, c. 34; and
    2. immediate product container - in accordance with the Hazardous Products Act, R.S., 1985, c. H-3.
  2. The Contractor must provide bilingual Safety Data Sheets, indicating the NATO Stock Number as follows:
    1. two hard copies:
      1. one copy to be enclosed with the shipment, and
      2. one copy to be mailed to:
        National Defence Headquarters
        MGen George R. Pearkes Building
        101 Colonel By Drive
        Ottawa, Ontario K1A 0K2
        Attention: DSCO 5-4-2
    2. one copy sent in any electronic format to the following address: MSDS-FS@FORCES.GC.CA.
  3. The Contractor will be responsible for any damages caused by improper packaging, labelling or carriage of dangerous goods/hazardous products.
  4. The Contractor must ensure they adhere to all levels of regulations regarding dangerous goods/hazardous products as set forth by federal, provincial and municipal laws and by-laws.
  5. The Contractor must contact the consignee (i.e. Supply Depot Traffic Section) at least 48 hours before shipping dangerous goods/hazardous products in order to schedule a receiving time.
2014-06-26SupersededD3010CARCHIVED Delivery of Dangerous Goods / Hazardous Products
2012-07-16SupersededD3010CARCHIVED Dangerous Goods/Hazardous Products
2007-11-30SupersededD3010CARCHIVED Dangerous Goods/Hazardous Products
2007-05-25SupersededD3010CARCHIVED Dangerous Goods/Hazardous Products

D3010D

Effective Date
Item Status
ID
Title
2002-12-13SupersededD3010DARCHIVED Dangerous Goods/Hazardous Products

Remarks – Recommended Use of SACC Item

Use the following clause when dangerous goods/hazardous products must be 
transported during the performance of the work. 

Legal text for SACC item

1.     Dangerous goods/hazardous products - material which is classed as 
       dangerous / hazardous shall be marked by the Supplier:

       (a)    shipping container - in accordance with the Transportation of 
              Dangerous Goods Act, 1992; and

       (b)    immediate product container - in accordance with the 
              Hazardous Products Act.

2.     Bilingual Material Safety Data Sheets, indicating the NATO Stock 
       Number, shall be provided by the Supplier as follows:

       (a)    two (2) hard copies:

              (i)    one (1) copy to be enclosed with the shipment, and
              (ii)   one (1) copy to be mailed to:

              National Defence Headquarters
              MGen George R. Pearkes Building
              101 Colonel By Drive
              Ottawa, Ontario  K1A 0K2

              Attention:    DMMD 2-3-4

       (b)    one (1) soft copy: on a 3.5 inch diskette in ASCII, Rich Text 
              Format (RTF) or common word processing format (i.e. MS Word 
              or WordPerfect) shall be mailed to the address provided at 
              paragraph 2(a)(ii).

3.     The Supplier shall be held liable for any damages caused by improper 
       packaging, labelling or carriage of goods/products.

4.     Suppliers must ensure they adhere to all levels of regulations 
       regarding dangerous goods/hazardous products as set forth by federal, 
       provincial and municipal laws, by-laws and acts of Parliament.

5.     Suppliers of dangerous goods must contact the consignee (i.e. Supply 
       Depot Traffic Section) at least 48 hours prior to shipping in order 
       to schedule a receiving time.


2000-12-01SupersededD3010DARCHIVED Dangerous Goods/Hazardous Products
2000-05-12SupersededD3010DARCHIVED Dangerous Goods/Hazardous Products
1999-06-21SupersededD3010DARCHIVED Dangerous Goods/Hazardous Products
1998-02-16SupersededD3010DARCHIVED Dangerous Goods/Hazardous Products
1994-06-01SupersededD3010DARCHIVED Dangerous Goods/Hazardous Materials
1991-06-01SupersededD3010DARCHIVED Dangerous Goods/Hazardous Materials

D3011D

Effective Date
Item Status
ID
Title
1991-06-01SupersededD3011DARCHIVED Delivery - Preparation

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

Preparation for delivery shall be in accordance with Canadian Forces 
   Packaging Specification CFPS D-LM-008-036/SF-000 (latest edition as of 
   date of Contract).  

D3012C

Effective Date
Item Status
ID
Title
2014-06-26ActiveD3012CPreparation for Delivery - Canadian Forces Preservation, Packaging and Packing

Remarks – Recommended Use of SACC Item

Use the following clause in contracts for the Department of National Defence for preservation, packaging and packing of goods.

Use this clause with the three options in the part "resulting contract clauses" of the bid solicitation. At contract award, contracting officers must choose and complete one of the following options, as applicable:

  1. Option 1 when delivery preparation is performed in Canada, or
  2. Option 2 when delivery preparation is performed in the United States, or
  3. Option 3 when delivery preparation is performed in the United Kingdom.

Legal text for SACC item

  • Option 1


    Preservation and packaging must be to level _____ and packing must be to level _____ in accordance with Canadian Forces Packaging Specification _____ .
  • Option 2


    Preservation and packaging must be to level _____ and packing must be to level _____ in accordance with United States Department of Defense Military Specification _____ .
  • Option 3


    Preservation, packaging and packing must be manufacturer's Trade Export Packaging or such packaging of a higher grade as recommended by the British Ministry.
2008-05-12SupersededD3012CARCHIVED Preparation for Delivery

D3012D

Effective Date
Item Status
ID
Title
1996-10-30SupersededD3012DARCHIVED Delivery - Preparation

Remarks – Recommended Use of SACC Item

If the following clause is used enter fill-in data.

Legal text for SACC item

IF PERFORMED IN CANADA: Preservation and packaging shall be to level _____ 
and packing shall be to level _____ in accordance with Canadian Forces 
packaging specification _____.

IF PERFORMED IN UNITED STATES: Preservation and packaging shall be to level _____ 
and packing shall be to level _____ in accordance with United States 
Department of Defense Military Specification _____.

IF PERFORMED IN THE UK: Preservation, packaging and packing shall be 
manufacturer's Trade Export Packaging or such packaging of a higher grade 
as recommended by the British Ministry.

1991-06-01SupersededD3012DARCHIVED Delivery - Preparation

D3013C

Effective Date
Item Status
ID
Title
2007-11-30ActiveD3013CPreparation for Delivery - Canadian-based Contractor

Remarks – Recommended Use of SACC Item

Use the following clause in contracts with Canadian-based contractors to define Department of National Defence's military packaging requirements for militarized items which are covered by the following categories:

  1. items not covered by a Canadian Forces commodity packaging specification (see D3016C ) or commercial packaging (see D3018C );
  2. repairable material for national stock;
  3. repair and overhaul of repairable material.

Use this clause in conjunction with D3019C in the part "resulting contract clauses" of the bid solicitation. At contract award, use either this clause or D3019C depending on whether the contractor is Canadian-based or from the United States.

Legal text for SACC item

  1. Preservation and packaging for items ______ must be in accordance with the Canadian Forces packaging specification D-LM-008-001/SF-001, and must be marked to D-LM-008-002/SF-001. Form Level B Pkg Data Form Reqd must be in accordance with D-LM-008-011/SF-001.
  2. Packaging data forms previously approved by Canadian authorities are acceptable.
  3. Approved coded packaging data is shown immediately below the description of the item to which it applies. Where no data is shown, the Contractor must submit a packaging data form for approval.

D3013D

Effective Date
Item Status
ID
Title
2005-06-10SupersededD3013DARCHIVED Preparation for Delivery

Remarks – Recommended Use of SACC Item

Use this clause to define Department of National Defence's military packaging 
requirements for militarized items which are covered by the following categories:

(a)	items not covered by a Canadian Forces commodity packaging specification 
(see D3016D) or commercial packaging (see D3018D);

(b)	repairable materiel for national stock;

(c) 	repair and overhaul of repairable materiel.

Legal text for SACC item

1.     For Contractors Located in Canada

       Preservation and packaging for items ______ shall be in accordance 
       with the Canadian Forces packaging specification D-LM-008-001/SF-001, 
       and shall be marked to D-LM-008-002/SF-001. Form Level B "PKG DATA 
       FORM REQD" shall be in accordance with D-LM-008-011/SF-001.

2.     For Contractors Located in United States

       Preservation and packaging for items _______ shall be in accordance 
       with the current issue of United States (U.S.) Department of Defense 
       Military Standard MIL-STD-2073 and shall be marked to MIL-STD-129.

3.     Approval Authorities

       Packaging data forms previously approved by Canadian or U.S. 
       authorities shall be acceptable.

4.     Coded Packaging Data

       Approved coded packaging data is shown immediately below the 
       description of the item to which it applies.  Where no data is shown, 
       the Contractor shall submit a packaging data form for approval.


1997-02-03SupersededD3013DARCHIVED Delivery - Preparation
1991-06-01SupersededD3013DARCHIVED Delivery - Preparation

D3014C

Effective Date
Item Status
ID
Title
2007-11-30ActiveD3014CTransportation of Dangerous Goods/Hazardous Products

Remarks – Recommended Use of SACC Item

Use the following clause in contracts when authorization for transportation of dangerous goods/hazardous products is required.

Legal text for SACC item

The Contractor must obtain the authorization from the Department of Transport to transport dangerous goods/hazardous products before the carrier may accept a charter involving the transportation of dangerous goods/hazardous products.

1992-08-01SupersededD3014CARCHIVED Transportation of Dangerous Goods
1992-01-31SupersededD3014CARCHIVED Transportation of Dangerous Goods

D3015C

Effective Date
Item Status
ID
Title
2014-09-25ActiveD3015CDangerous Goods / Hazardous Products - Labelling and Packaging Compliance

Remarks – Recommended Use of SACC Item

Use the following clause in contracts for dangerous goods/hazardous products to ensure labelling and packaging is in accordance with regulations.

Legal text for SACC item

  1. The Contractor must ensure proper labelling and packaging in the supply and shipping of dangerous goods/hazardous products to the Government of Canada.
  2. The Contractor will be held liable for any damages caused by improper packaging, labelling or carriage of dangerous goods/hazardous products.
  3. The Contractor must clearly mark all merchandise labels with the percentage of volume that is a hazardous item. Failure to do so will result in the Contractor being held responsible for damages caused in the movement of goods/products by government vehicles or government personnel.
  4. The Contractor must adhere to all applicable laws regarding dangerous goods/hazardous products.
2007-11-30SupersededD3015CARCHIVED Dangerous Goods/Hazardous Products

D3015D

Effective Date
Item Status
ID
Title
2000-12-01SupersededD3015DARCHIVED Dangerous Goods

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

1.     It is the responsibility of the Contractor to ensure proper 
       labelling and packaging in the supply and shipping of dangerous 
       goods and hazardous products to the Government of Canada.

2.     Canada shall not be held liable for any damages caused by improper 
       packaging, labelling or carriage of goods/products.

3.     All merchandise labels are to be clearly marked with the percentage 
       of volume that is a hazardous item.  Failure to do so will result in 
       the Contractor being held responsible for damages caused in the 
       movement of goods/products by government vehicles or government 
       personnel.

4.     Contractors must ensure they adhere to all levels of regulations 
       regarding dangerous goods/hazardous products as set forth by federal, 
       provincial and municipal laws, by-laws and acts of Parliament.


1998-02-16SupersededD3015DARCHIVED Dangerous Goods
1995-03-31SupersededD3015DARCHIVED Dangerous Goods

D3016C

Effective Date
Item Status
ID
Title
2014-09-25ActiveD3016CPreparation for Delivery - Canadian Forces Packaging Specifications

Remarks – Recommended Use of SACC Item

Use the following clause in contracts to define the packaging specification for the procurement of items covered by a commodity packaging specification.

In the first blank, specify the item number(s).

In the second blank, insert the specified Commodity Packaging Specification number and title.

  1. D-LM-008-015/SF-000, Piezoelectric Crystals;
  2. D-LM-008-026/SF-001, Preformed Packing, Gaskets or Seals (rubber natural/synthetic, cork, asbestos or leather);
  3. D-LM-008-027/SF-001, Small Arms Weapons;
  4. D-LM-008-030/SF-001, Hose, Rubber, Plastic, Fabric or Metal (including tubing) and Fittings, Nozzles and Strainers;
  5. D-LM-008-033/SF-000, Maritime Bearings, Matched Sets;
  6. D-LM-008-035/SF-001, Electrostatic Discharge Protective Packaging - Electronic Parts, Assemblies and Equipment;
  7. D-LM-008-037/SF-000, Antifriction Bearings (other than instrument precision bearings).

Legal text for SACC item

The Contractor must prepare item(s) ______ for delivery in accordance with the latest issue of the Canadian Forces packaging specifications _____ .

2007-11-30SupersededD3016CARCHIVED Preparation for Delivery

D3016D

Effective Date
Item Status
ID
Title
2003-12-12SupersededD3016DARCHIVED Preparation for Delivery

Remarks – Recommended Use of SACC Item

Use this clause to define the packaging specification for the procurement of 
items covered by a commodity packaging specification.  In the first blank, 
specify the item number(s).  In the second blank, insert the specified Commodity 
Packaging Specification number and title.

(a) 	D-LM-008-015/SF-000, Piezoelectric Crystals;

(b) 	D-LM-008-026/SF-001, Preformed Packing, Gaskets or Seals (rubber 
natural/synthetic, cork, asbestos or leather);

(c) 	D-LM-008-027/SF-001, Small Arms Weapons;

(d) 	D-LM-008-030/SF-001, Hose, Rubber, Plastic, Fabric or Metal (including 
tubing) and Fittings, Nozzles and Strainers;

(e) 	D-LM-008-033/SF-000, Maritime Bearings, Matched Sets;

(f) 	D-LM-008-035/SF-001, Electrostatic Discharge Protective Packaging -  
Electronic Parts, Assemblies and Equipment;

(g) 	D-LM-008-037/SF-000, Antifriction Bearings (other than instrument precision 
bearings).

Legal text for SACC item

Preparation for delivery for item (s) _____ shall be in accordance with the 
latest issue of the Canadian Forces packaging specification _____.


2002-12-13SupersededD3016DARCHIVED Preparation for Delivery
1996-05-01SupersededD3016DARCHIVED Preparation for Delivery

D3017C

Effective Date
Item Status
ID
Title
2014-09-25ActiveD3017CPreparation for Delivery - Ammunition and Missiles

Remarks – Recommended Use of SACC Item

Use the following clause in contracts to identify the packaging requirement for any item in NATO classes 1300 and 1410 (Ammunition and Missiles).

Legal text for SACC item

The Contractor must prepare for delivery any item in NATO classes 1300 and 1400 (Ammunition and Missiles) in accordance with the current issue of the Canadian Forces packaging specification D-09-002-004/SG-000.

2007-11-30SupersededD3017CARCHIVED Preparation for Delivery

D3017D

Effective Date
Item Status
ID
Title
1997-02-03SupersededD3017DARCHIVED Preparation for Delivery

Remarks – Recommended Use of SACC Item

Use this clause to define the packaging and specifications which shall be used 
for procurement of items in NATO classes 1300 and 1410 (Ammunition and Missiles).

Legal text for SACC item

The Contractor shall prepare for delivery all items in NATO classes 1300 
and 1400 (Ammunition and Missiles) in accordance with the current issue of 
Canadian Forces packaging specifications D-09-002-005/SG-000.

D3018C

Effective Date
Item Status
ID
Title
2014-09-25ActiveD3018CPackaging Requirement using Specification D-LM-008-036/SF-000

Remarks – Recommended Use of SACC Item

Use the following clause in contracts to define Department of National Defence's packaging requirements for the procurement of items which are covered by the following categories:

  1. Commercial Off-the-Shelf (COTS);
  2. direct to customer, for immediate use (including modifications);
  3. COLOG (co-operative logistics); or
  4. items not covered by another Canadian Forces commodity packaging specification (see D3016C) or military packaging (see D3013C).

Legal text for SACC item

The Contractor must prepare item number(s) _____ for delivery in accordance with the latest issue of the Canadian Forces Packaging Specification D-LM-008-036/SF-000, DND Minimum Requirements for Manufacturer's Standard Pack.

The Contractor must package item number(s) _____ in quantities of _____ (insert a mandatory quantity per unit pack or "up to a maximum of 100") by package.

2007-11-30SupersededD3018CARCHIVED Preparation for Delivery

D3018D

Effective Date
Item Status
ID
Title
2002-12-13SupersededD3018DARCHIVED Delivery - Preparation

Remarks – Recommended Use of SACC Item

Use this clause to define Department of National Defence's packaging 
requirements for the procurement of items which are covered by the following 
categories:

(a) 	Commercial Off-the-Shelf (COTS);
(b) 	direct to customer, for immediate use (including modifications);
(c) 	COLOG (co-operative logistics); or
(d) 	items not covered by another Canadian Forces commodity packaging 
specification (see D3016D) or military packaging (see D3013D).

In the first and second blank, specify the item number(s).  In the third blank, 
specify a mandatory quantity per unit pack or the following statement, "up to a 
maximum of 100".

Legal text for SACC item

Preparation for delivery for item number(s) _____ shall be in accordance 
with the latest issue of the Canadian Forces Packaging Specification 
D-LM-008-036/SF-000, Department of National Defence's Minimum Requirements 
for Manufacturer's Standard Pack.

Item number(s) _____ shall be packaged in quantities of _____ per package.


D3019C

Effective Date
Item Status
ID
Title
2007-11-30ActiveD3019CPreparation for Delivery - United States-based Contractor

Remarks – Recommended Use of SACC Item

Use the clause in contracts with United States (U.S.)-based contractors to define Department of National Defence's military packaging requirements for militarized items which are covered by the following categories:

  1. items not covered by a Canadian Forces commodity packaging specification (see D3016C ) or commercial packaging (see D3018C );
  2. repairable material for national stock;
  3. repair and overhaul of repairable material.

Use this clause in conjunction with D3013C in the part "resulting contract clauses" of the bid solicitation. At contract award, use either this clause or D3013C depending on whether the contractor is Canadian-based or U.S. based.

Legal text for SACC item

  1. Preservation and packaging for items _______ must be in accordance with the current issue of United States (U.S.) Department of Defense Military Standard MIL-STD-2073 and must be marked to MIL-STD-129.
  2. Packaging data forms previously approved by U.S. authorities are acceptable.
  3. Approved coded packaging data is shown immediately below the description of the item to which it applies. Where no data is shown, the Contractor must submit a packaging data form for approval.

D3020C

Effective Date
Item Status
ID
Title
2022-12-01ActiveD3020CPreparation for Delivery - European Union

Remarks – Recommended Use of SACC Item

Use the following clause in contracts for the Department of National Defence (DND) with European Union-based contractors to define DND 's military packaging requirements for militarized items which are not covered by another Canadian Forces commodity packaging specification (see D3016C ) or commercial packaging (see D3018C ).

Legal text for SACC item

The Contractor must prepare item number(s) _____ for preservation and packaging in accordance with NATO Marking and Packaging Standards as contained in the latest issue of TL8100-0100 and must be packaged to a minimum packing level C.

2008-05-12SupersededD3020CARCHIVED Preparation for Delivery - European Union

D4000C

Effective Date
Item Status
ID
Title
2008-05-12ActiveD4000CShipping Instructions - Delivery at Origin

Remarks – Recommended Use of SACC Item

Use the following clause in contracts when delivery is FOB origin or FCA contractor's facility and Canada will be responsible for all delivery charges, administration, costs and risk of transport and customs clearance, including the payment of customs duties and taxes, if applicable.

Do not use this clause for Department of National Defence (DND) contracts when DND is responsible for shipping.

Use this clause in conjunction with C5200C or C5201C , as applicable.

Legal text for SACC item

Goods must be consigned to the destination specified in the Contract and delivered:

  1. Free on Board (Origin) common carrier ________ (insert place of destination) for shipments from the United States government, or
  2. FCA Free Carrier ________ (insert the named place, e.g. Contractor's facility) Incoterms 2000 for shipments from a commercial contractor.
2007-11-30SupersededD4000CARCHIVED Shipping Instructions - Delivery at Origin
2004-12-10SupersededD4000CARCHIVED Shipping Instructions - Delivery at Origin
2003-12-12SupersededD4000CARCHIVED Shipment - FOB (Origin) and FCA
1996-05-01SupersededD4000CARCHIVED Shipment and FOB
1991-06-01SupersededD4000CARCHIVED Shipment and FOB

D4001C

Effective Date
Item Status
ID
Title
2008-12-12ActiveD4001CShipping Instructions - Delivery at Destination

Remarks – Recommended Use of SACC Item

Use the following clause in contracts when delivery is FOB destination or DDP Delivered Duty Paid and the contractor is responsible for all delivery charges, administration, costs and risks of transport and customs clearance, including the payment of customs duties and taxes.

Do not use this clause for the Department of National Defence (DND) when DND is responsible for shipping.

Use this clause in conjunction with C5200C .

Legal text for SACC item

Goods must be consigned to the destination specified in the Contract and delivered:

  1. Free on Board (Destination) common carrier ________ (insert the place of destination) for shipments from the United States government; or
  2. Delivered Duty Paid (DDP) _______ (insert the named place of destination) Incoterms 2000 for shipments from a commercial contractor.
2008-05-12SupersededD4001CARCHIVED Shipping Instructions - Delivery at Destination
2007-11-30SupersededD4001CARCHIVED Shipping Instructions - Delivery at Destination
2005-06-10SupersededD4001CARCHIVED Shipping Instructions - Delivery at Destination
2004-12-10SupersededD4001CARCHIVED Shipping Insrtuctions - Delivery at Destination
2004-05-14SupersededD4001CARCHIVED Shipment - FOB and DDP
2003-12-12SupersededD4001CARCHIVED Shipment - FOB and DDP
1991-06-01SupersededD4001CARCHIVED Shipment

D4002C

Effective Date
Item Status
ID
Title
2013-04-25ActiveD4002CShipping Instructions - Free on Board Destination and Delivered Duty Paid

Remarks – Recommended Use of SACC Item

Use the following clause in contracts when delivery is at destination and the contractor is responsible for all delivery charges, administration, costs and risks of transport and customs clearance, including the payment of customs duties and Applicable Taxes.

Use Option 1 when delivery is FOB Destination. Use Option 2 when Incoterms 2000 are used and delivery is "Delivered Duty Paid".

Do not use this clause in Department of National Defence (DND) contracts when DND is responsible for shipping.

Legal text for SACC item

Goods must be consigned and delivered to the destination specified in the contract:

Option 1:

FOB Destination ________ (insert the place of destination) including all delivery charges and customs duties and Applicable Taxes.

Option 2:

Incoterms 2000 "DDP Delivered Duty Paid" _______ (insert the place of destination).

2010-01-11SupersededD4002CARCHIVED Shipping Instructions - Free on Board Destination and Delivered Duty Paid

D4002D

Effective Date
Item Status
ID
Title
1991-06-01CancelledD4002DARCHIVED Point of Manufacture/Shipping

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

State point of manufacture/shipping of goods or where service is to be 
performed:

       Location: _____
       Postal Code: _____.

D4003C

Effective Date
Item Status
ID
Title
2007-11-30ActiveD4003CFOB Point (California)

Remarks – Recommended Use of SACC Item

Use the following clause in all contracts with suppliers located in California.

Use this clause in conjunction with C2002C when ownership will not be transferred to Canada until delivery of the goods.

Use this clause in conjunction with K9010C when the contract provides for progress or advance payments or when the goods must remain in the State of California for a period of time.

Legal text for SACC item

Delivery of the goods covered by the Contract must be FOB common carrier, Contractor's plant, _____ , California, or, if so instructed by Canada, FOB a conveyance provided by the Government of Canada at _____ , California. Ownership must be transferred to Canada at the time of the delivery of the goods. The goods must be consigned to the consignees and destinations outside the United States of America identified in the Contract.

1998-02-16SupersededD4003CARCHIVED FOB Point (California)
1993-10-29SupersededD4003CARCHIVED FOB Point (California)

D5000T

Effective Date
Item Status
ID
Title
1991-06-01CancelledD5000TARCHIVED Inspection - Authority

Remarks – Recommended Use of SACC Item

If the following clause is used, enter fill-in data. 

Legal text for SACC item

Work provided under any contract resulting herefrom will be subject to 
inspection by the Inspection Authority shown below, to whom all questions 
regarding inspection will be referred.

Inspection Authority:  _____ 

D5001D

Effective Date
Item Status
ID
Title
1991-06-01CancelledD5001DARCHIVED Inspection - Quality Assurance/Authority

Remarks – Recommended Use of SACC Item

Use the following clause in bid solicitations and contracts when a DSS Quality 
Assurance Agency is called up on requisitions as the inspecting agency. 

Legal text for SACC item

Work provided under the Contract shall be subject to inspection by the 
following agency: _____ .

The Contractor shall refer all questions regarding drawings and 
   specifications to this Agency prior to production and shall make 
   arrangements for inspection prior to packaging and shipping of goods.

D5002D

Effective Date
Item Status
ID
Title
1992-12-01SupersededD5002DARCHIVED Method of payment

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

Payment will be made monthly for all tasks called-up and completed within 
   the month, after receipt of an invoice which contains an itemized 
   account of all tasks and the relevant call-up reference numbers.  

D5300D

Effective Date
Item Status
ID
Title
1991-06-01SupersededD5300DARCHIVED Inspection - DND at Destination

Remarks – Recommended Use of SACC Item

Use the following clause in bid solicitations and contracts when DND 
requisitions specify acceptance inspection by the Department of National Defence 
at destination.

Legal text for SACC item

Work  provided under this Contract shall be subject to verification by the 
   Department of National Defence at destination.

D5301D

Effective Date
Item Status
ID
Title
1991-06-01SupersededD5301DARCHIVED Inspection - DND

Remarks – Recommended Use of SACC Item

Use the following clause in bid solicitations and contracts when DND 
requisitions specify inspection by a DND quality assurance representative at 
destination  

Legal text for SACC item

The Contractor is responsible for performing or having performed all 
inspections and tests necessary to substantiate that the materiel or 
services provided conform to the drawings, specifications and Contract 
requirements of the specified manufacturer's part number.

All materiel supplied under this Contract may be subject to inspection by a 
   Department of National Defence quality assurance representative at 
   destination.

D5302D

Effective Date
Item Status
ID
Title
1998-02-16CancelledD5302DARCHIVED Inspection - Consignee

Remarks – Recommended Use of SACC Item

Use the following clause in bid solicitations and contracts for departments 
where inspection is being carried out by the consignee.

Legal text for SACC item

Work provided under the Contract shall be subject to inspection by the 
consignee at destination.

1991-06-01SupersededD5302DARCHIVED Inspection - Civilian Consignee

D5303C

Effective Date
Item Status
ID
Title
1991-06-01SupersededD5303CARCHIVED Inspection - DND QA at Source

Remarks – Recommended Use of SACC Item

Use the following clause in contracts placed with Canadian suppliers when the 
DND requisition specifies quality assurance at source. Insert the name of the 
city and the Canadian Forces Technical Services Agency telephone number nearest 
to the contractor's address:

Maritime Region          - Halifax               (902) 427-7155 Quebec Region    
        - Montreal              (514) 283-5017 Ontario Region           - 
Toronto               (416) 224-4961 Western Region           - Edmonton         
     (403) 973-4317 Ottawa/Hull Area         - Ottawa                (613) 
991-4106 Vancouver Area           - Vancouver             (604) 666-4138 
Winnipeg Area            - Winnipeg              (204) 833-5533

Include clause D5601C. 

Legal text for SACC item

All Work shall be subject to Department of National Defence quality 
assurance.  Within forty-eight (48) hours of receipt of this Contract, the 
Contractor will make arrangements with the Department of National Defence 
Inspector who normally services the Contractor's plant and provide the 
Inspector with a copy of this Contract. The name, location and telephone 
number of the Inspector may be obtained from the Canadian Forces Technical 
Services Agency _____(insert city), _____(insert telephone number).

For contracts involving site installation, the Contractor will make 
arrangements with the Director, Quality Assurance Operations, Site 
Installation Supervisor, Ottawa, Ontario (613) 996-4625.

Proof of DND quality assurance is required in the form of properly 
   completed release documents.  Such proof is required by DND prior to 
   payment of invoices. 

D5304C

Effective Date
Item Status
ID
Title
1991-06-01SupersededD5304CARCHIVED Inspection - DND QA at Source (U.S.)

Remarks – Recommended Use of SACC Item

Use the following clause in contracts placed by DSS headquarters or regional 
directorates with United States suppliers, when the DND requisition specifies 
quality assurance at source.  Include release document clause D5602C. 

Legal text for SACC item

All Work shall be subject to government quality assurance.  The Contractor 
will be notified officially by the Director General Quality Assurance, 
National Defence Headquarters, Ottawa, Ontario K1A OK2, as to the 
government agency with whom the Contractor must make quality assurance 
arrangements.  This agency will normally be the agency which performs such 
services in the Contractor's plant or area.

Proof of government quality assurance is required in the form of properly 
   completed DD Form 250s.  Such proof is required by DND prior to payment 
   of invoices.

D5305C

Effective Date
Item Status
ID
Title
1991-06-01SupersededD5305CARCHIVED Inspection - QA Europe (NATO)

Remarks – Recommended Use of SACC Item

Use the following clause in contracts placed by DSS headquarters or regional 
directorate with suppliers located in European countries including NATO members. 
 Include release document clause D5600D.

Legal text for SACC item

All Work shall be subject to government quality assurance.  The Contractor 
will be notified officially by the Technical Services Section, Canadian 
Defence Liaison Staff, 1 Grosvenor Square, London W1X 0AB, England, on 
behalf of the Director General Quality Assurance, as to the government 
agency with whom the Contractor must make quality assurance arrangements.  
This agency will normally be the agency which performs such services in the 
Contractor's plant or area.

Proof of government quality assurance is required in the form of properly 
   completed Certificate of Conformity in accordance with STANAG 4107.  
   Such proof is required by DND prior to payment of invoices.

D5306D

Effective Date
Item Status
ID
Title
1991-06-01CancelledD5306DARCHIVED Inspection Requirements - QMB 100

Remarks – Recommended Use of SACC Item

Use the following clause when the Requisition specifies DSS Specification QMB 
100. 

Legal text for SACC item

The Work described herein shall be subject to the provisions of DSS 
   Specification QMB 100.  

D5307D

Effective Date
Item Status
ID
Title
1991-06-01SupersededD5307DARCHIVED Inspection Requirements - U.S. FAA/DOT

Remarks – Recommended Use of SACC Item

Use the following clause when the requisition specifies U.S. Federal Aviation 
Administration (FAA) and/or Canadian Department of Transport regulations. 

Legal text for SACC item

The Work described herein shall be inspected in compliance with the 
   requirements of the U.S. Federal Aviation Administration or the Canadian 
   Department of Transport civil aircraft regulations and is subject to 
   verification by the Department of National Defence at destination.  
   Proof of inspection shall accompany each shipment. 

D5308D

Effective Date
Item Status
ID
Title
1999-06-21CancelledD5308DARCHIVED Inspection/Acceptance

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

The Work provided under the Contract shall be subject to inspection and 
acceptance by the Consignee at destination.


1998-06-15SupersededD5308DARCHIVED Inspection/Acceptance
1991-06-01SupersededD5308DARCHIVED Inspection/Acceptance

D5309D

Effective Date
Item Status
ID
Title
1991-06-01CancelledD5309DARCHIVED Inspection

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

Subject to inspection and acceptance by consignee at destination. Cylinders 
   shall be as per National Fire Prevention Association (NFPA) Standard. 

D5310D

Effective Date
Item Status
ID
Title
1991-06-01CancelledD5310DARCHIVED Inspection/Stamping - Meat Products

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

INSPECTION AND STAMPING PROCEDURES FOR MEAT PRODUCTS CONSIGNED TO THE 
DEPARTMENT OF NATIONAL DEFENCE:

1.     All shipments of meat products consigned to the Department of 
       National Defence (DND) must be inspected and stamped as complying 
       with all individual contract specifications by an inspector of the 
       Food Products and Inspection Branch, Agriculture Canada, prior to 
       shipment.

       IT IS THE RESPONSIBILITY OF THE REGISTERED ESTABLISHMENT AWARDED A 
       CONTRACT TO ENSURE THAT:

       (a)    the inspector is notified and is given a copy of the contract; 
              and

       (b)    there is in the possession of the management, the latest 
              issue of the Canadian General Standards Board standards 
              respecting the contract; and these are available to the 
              inspector-in-charge. This is to be confirmed by a letter 
              issued by Department of Public Works and Government Services 
              (DPWGS), signed by plant management and the 
              inspector-in-charge and returned to the area office of DPWGS.

2.     It is a contractual obligation that meat products for the Department 
       of National Defence be inspected, stamped with the official stamp, 
       and date marked at the PLANT OF PRODUCTION. In the case of processed 
       products with a label approval number specified on the contract, the 
       stamping and date marking may be done at the shipping establishment. 
       Plant management must ensure that any product leaving their plant 
       for shipment to DND has been properly stamped by the inspector. A 
       rubber or brass stamp marked "Agriculture Canada Insp. (number)" for 
       G.C. is available on request. The stamp must remain under the 
       control of the inspector-in-charge. A log of each occasion when the 
       stamp is used shall be kept indicating date, stamp number, type and 
       quantity of product, destination and contract number.

3.     After the inspector has verified that the shipment meets all 
       contract requirements and that each container has been date stamped, 
       each container must be legibly stamped using the "Agriculture Canada 
       Insp. (number)" for G.C. stamp prior to shipment. In the case of 
       beef carcasses, each quarter must have two stamp impressions or 
       eight per carcass. Hog, veal, lamb and mutton carcasses must have 
       three stamp impressions per side or six per carcass.

4.     Inspectors are to document all in-plant rejections of meat products 
   destined for DND by cause and notify their regional office which, in 
   turn, will notify DPWGS. 

D5311C

Effective Date
Item Status
ID
Title
2007-11-30ActiveD5311CRight of Access and Inspection of Meat

Remarks – Recommended Use of SACC Item

Use the clause in contracts for the procurement of meat.

Legal text for SACC item

After final processing has been completed at a federally inspected plant, the Contractor must not alter, process or repack any meat that has been inspected and approved by the Canadian Food Inspection Agency.

Without limiting any of Canada's rights of access or inspection included in the Contract, the Inspection Authority or its designated representative must have access to the storage and refrigeration areas on the Contractor's premises at any time during the performance of the Contract in order to inspect the packaging and, if applicable, any processing of the meat. The Contractor must provide all reasonable assistance to the Inspection Authority or its designated representative and any information the Inspection Authority or its designated representative may require concerning the preparation, packaging, and quality of the meat.

D5311D

Effective Date
Item Status
ID
Title
1999-06-21SupersededD5311DARCHIVED Meat Products-Access to Plant

Remarks – Recommended Use of SACC Item

Use the following clause in all bid solicitations and contracts covering the 
procurement of fresh meat.

Legal text for SACC item

Once final processing has been completed at a federally inspected plant, 
the Contractor shall not alter, process or repack any meats that have been 
inspected and approved by the Canadian Food Inspection Agency.

For greater certainty, and without limiting any of Canada's rights granted 
by or referred to in any provision of the Contract to conduct inspections 
or with respect to access to the Work, the Inspection Authority or its 
designate shall have access to the storage and refrigeration areas on the 
Contractor's premises at any time during the performance of the Contract in 
order to inspect the packaging and, if applicable, any processing of the 
meats. The Contractor shall afford all reasonable assistance to the 
Inspection Authority and shall provide such information as the Inspection 
Authority may require concerning the preparation, packaging, and quality of 
the meats.

1993-10-29SupersededD5311DARCHIVED Meat Products-Access to Plant

D5313D

Effective Date
Item Status
ID
Title
1991-06-01SupersededD5313DARCHIVED Service Site Authority

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

Work is to be carried out to the satisfaction of the _____, or his 
   designated representative.    

D5314D

Effective Date
Item Status
ID
Title
1998-02-16CancelledD5314DARCHIVED Inspection - DPWGS

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

Inspection shall be by the Department of Public Works and Government 
Services, Aerospace, Marine, and Electronics Systems Sector.

1994-06-01SupersededD5314DARCHIVED Inspection - DSS
1991-06-01SupersededD5314DARCHIVED Inspection - DSS

D5315D

Effective Date
Item Status
ID
Title
1994-06-01CancelledD5315DARCHIVED Inspection - DSS/Consignee

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

Inspection shall be by the DSS Marine Directorate and Consignee.    
1991-06-01SupersededD5315DARCHIVED Inspection - DSS/Consignee

D5316D

Effective Date
Item Status
ID
Title
1991-06-01SupersededD5316DARCHIVED Inspection - DND

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

All work shall be subject to Department of National Defence Quality 
   Assurance. Within 48 hours of receipt of ensuing contract you will make 
   arrangements with the Department of National Defence Inspector who 
   normally services your plant. The name, location and telephone number of 
   the Inspector for your area may be obtained from the Canadian Forces 
   Technical Services Agency, _____ .  Proof of DND quality assurance is 
   required in the form of properly completed release documents. Such proof 
   is required by DND prior to payment of invoices. DND AQAP-4 inspection 
   system to be incorporated.   

D5317D

Effective Date
Item Status
ID
Title
1991-06-01SupersededD5317DARCHIVED Inspection

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

Inspection shall be by the Designated User Service Site Authority,  or his 
   delegated representative.    

D5318C

Effective Date
Item Status
ID
Title
2007-11-30ActiveD5318CInspection and Technical Services

Remarks – Recommended Use of SACC Item

Use the following clause in ship refit contracts, if applicable. Contracting officers must identify the "Lead On-site Inspector" in the contract.

Legal text for SACC item

  1. The Contractor must provide marine inspection and related technical services to Public Works and Government Services Canada (PWGSC), as-and-when requested in the following area(s) of expertise:
    1. __________
    2. __________
    3. __________
    4. __________ .
  2. The duties include:
    1. the examination, analysis and processing, to Inspection and Technical Services (I. & T.S.) Directorate instructions, of plans, drawings and specifications as received from contractors on site or from other sources;
    2. the examination, analysis and processing, to I. & T.S. Directorate instructions, of purchase orders or subcontracts issued by the contractors with regard to their compliance with approved drawings, specifications and amendments, special contractual requirements and the applicable Classification and Regulatory requirements;
    3. the examination of all significant material and equipment on arrival at the shipyard for compliance with the approved purchase order or subsequent requirements, physical condition and proposed storage conditions;
    4. the examination and evaluation of cost elements of design changes proposed by the Contractors during the term of the Contract;
    5. the surveillance and inspection of the work in progress at the contractors' offices and plant to ensure compliance with approved plans, drawings, specifications, contractual documents and amendments and also to ensure that the practices, procedures, techniques, workmanship, equipment and quality do not deviate from the standards as set out in the approved specifications and/or contractual documents;
    6. the inspection and approval of work in progress to ensure compliance with contractual requirements in the selection and use of critical materials and the clean and orderly assembly of units, equipment and materials so as to minimize operational problems after acceptance;
    7. the witnessing of systems and equipment preliminary tests, and trials, including dock trials for main and auxiliary machinery, evaluating results, reporting and inspecting the correction of defects;
    8. attendance at sea trials and final inspection to assist in evaluating results, compiling final defect and deficiency lists and advising the Lead On-site Inspector of the PWGSC Inspection Office on acceptability of the finished work.

D5318D

Effective Date
Item Status
ID
Title
1998-06-15SupersededD5318DARCHIVED Inspection and Technical Services

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

1.     The Contractor shall provide marine inspection and related technical 
       services to the Department of Public Works and Government Services 
       (DPWGS), as-and-when requested in the following area(s) of expertise:

       (a)__________
       (b)__________
       (c)__________
       (d)__________

2.     The duties include, but are not exclusive to:

       (a)    the examination, analysis and processing, to Inspection and 
              Technical Services (I. & T.S.) Directorate instructions, of 
              plans, drawings and specifications as received from 
              contractors on site or from other sources;

       (b)    the examination, analysis and processing, to I. & T.S. 
              Directorate instructions, of purchase orders or subcontracts 
              issued by the Contractor with regard to their compliance with 
              approved drawings, specifications and amendments, special 
              contractual requirements and the applicable Classification 
              and Regulatory requirements;

       (c)    the examination of all significant material and equipment on 
              arrival at the shipyard for compliance with the approved 
              purchase order or subsequent requirements, physical condition 
              and proposed storage conditions;

       (d)    the examination and evaluation of cost elements of design 
              changes proposed by the Contractor during the term of the 
              Contract; 

       (e)    the surveillance and inspection of the work in progress at 
              the Contractor's offices and plant to ensure compliance with 
              approved plans, drawings, specifications, contractual 
              documents and amendments thereto and also to ensure that the 
              practices, procedures, techniques, workmanship, equipment and 
              quality do not deviate from the standards as set out in the 
              approved specifications and/or contractual documents;

       (f)    the inspection and approval of work in progress to ensure 
              compliance with contractual requirements in the selection and 
              use of critical materials and the clean and orderly assembly 
              of units, equipment and materials so as to minimize 
              operational problems after acceptance;

       (g)    the witnessing of systems and equipment preliminary tests, 
              and trials, including dock trials for main and auxiliary 
              machinery, evaluating results, reporting and inspecting the 
              correction of defects; 
       h)     attendance at sea trials and final inspection to assist in 
              evaluating results, compiling final defect and deficiency 
              lists and advising the Senior Inspector of DPWGS Inspection 
              Office on acceptability of the finished work.

1991-06-01SupersededD5318DARCHIVED Inspection and Technical Services

D5320D

Effective Date
Item Status
ID
Title
1998-06-15CancelledD5320DARCHIVED Inspection

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

Work is to be performed to the satisfaction of and subject to the 
acceptance of the Consignee or its delegated representative(s). The 
Consignee has the ultimate responsibility of inspecting guard services 
provided to its department and of reporting poor guard performance to the 
Contracting Authority. The Contracting Authority will immediately advise 
the Contractor of any critical deficiencies or complaints and will ensure 
that the required corrective measures are taken.


1992-01-31SupersededD5320DARCHIVED Inspection

D5321D

Effective Date
Item Status
ID
Title
1992-01-31CancelledD5321DARCHIVED Inspection

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

The services provided are subject to inspection and acceptance by the 
   Project Authority specified herein.  

D5322D

Effective Date
Item Status
ID
Title
1992-01-31SupersededD5322DARCHIVED Inspection

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

The services called-up and provided against this Standing Offer will be 
performed to the satisfaction of and subject to acceptance by the Project 
Authority designated herein unless otherwise specified in the DSS 942 
call-up document. 


D5324C

Effective Date
Item Status
ID
Title
2007-11-30ActiveD5324CInspection

Remarks – Recommended Use of SACC Item

Use the following clause in contracts when services must be approved by the charterer or its authorized representative.

Legal text for SACC item

All services provided must be approved by the Charterer or its authorized representative who will have the right to inspect the aircraft, and operational documentation including flight plan or flight notification, loading records, logs and aircrew logbooks, to ensure compliance with the conditions of the Contract.

D5324D

Effective Date
Item Status
ID
Title
1998-02-16SupersededD5324DARCHIVED Inspection

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

All services provided shall be subject to the approval of and acceptance by 
the Charterer or its authorized representative who will have the right to 
inspect the aircraft, and operational documentation including flight plan 
or flight notification, loading records, logs and aircrew logbooks, in 
order to ensure compliance with the terms and conditions of the Contract.

1992-08-01SupersededD5324DARCHIVED Inspection
1992-01-31SupersededD5324DARCHIVED Inspection

D5325D

Effective Date
Item Status
ID
Title
1992-01-31SupersededD5325DARCHIVED Inspection

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

All services provided shall be subject to the approval of and acceptance by 
   the Charterer or his authorized representative who will have the right 
   to inspect the aircraft, and operational documentation including flight 
   plan or flight notification, loading records, logs and aircrew logbooks, 
   in order to ensure compliance with the terms and conditions stated in 
   this Standing Offer and any call-up made against it.  

D5326D

Effective Date
Item Status
ID
Title
1996-05-01CancelledD5326DARCHIVED Inspection and Acceptance

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

The services performed shall be subject to inspection and acceptance by the 
Consignee.

D5327D

Effective Date
Item Status
ID
Title
1996-05-01CancelledD5327DARCHIVED Inspection

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

The Technical/Project Authority shall be the Inspector and Consignee for 
all Work and shall be the Contractor's primary contact for all technical 
matters, including interpretation of the Specification and scheduling of 
the Work.

D5328C

Effective Date
Item Status
ID
Title
2014-06-26ActiveD5328CInspection and Acceptance

Remarks – Recommended Use of SACC Item

Use the following clause in contracts when the technical authority or the project authority is the inspection authority.

Legal text for SACC item

The ___________ (insert "Technical" or "Project") Authority is the Inspection Authority. All reports, deliverable items, documents, goods and all services rendered under the Contract are subject to inspection by the Inspection Authority or representative. Should any report, document, good or service not be in accordance with the requirements of the Statement of Work and to the satisfaction of the Inspection Authority, as submitted, the Inspection Authority will have the right to reject it or require its correction at the sole expense of the Contractor before recommending payment.

2007-11-30SupersededD5328CARCHIVED Inspection and Acceptance

D5328D

Effective Date
Item Status
ID
Title
2000-12-01SupersededD5328DARCHIVED Inspection and Acceptance

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

The Technical/Project Authority shall be the Inspection Authority.  All 
reports, deliverables, documents, goods and all services rendered under 
this Contract shall be subject to inspection by the Inspection Authority or 
its designated representative.  Should any report, document, good or 
service not be in accordance with the requirements of the Statement of Work 
and to the satisfaction of the Inspection Authority, as submitted, the 
Inspection Authority shall have the right to reject it or require its 
correction at the sole expense of the Contractor before recommending 
payment.  Any communication with a Contractor regarding the quality of Work 
performed pursuant to this Contract shall be undertaken by official 
correspondence through the Contracting Authority.



1996-05-01SupersededD5328DARCHIVED Inspection and Acceptance

D5401D

Effective Date
Item Status
ID
Title
1998-11-23SupersededD5401DARCHIVED Quality Plan - Solicitation

Remarks – Recommended Use of SACC Item

Use the following clause when a documented Quality Plan is required at time of 
bid.  The clause is used in conjunction with clause D5402D, Quality Plan - 
Contract.

Legal text for SACC item

For all solicitations

The bidder must submit a Quality Plan with the bid.  The Quality Plan shall 
be in the same format that will be used after award of contract.  (Refer to 
clause D5402D, Quality Plan - Contract).

The Quality Plan may reference other documents.  Where referenced documents 
do not already exist, but are required by the Quality Plan, the plan shall 
identify them and also identify when, how and by whom they will be prepared 
and approved.  The documents referenced in the Quality Plan shall be made 
available when requested by the Department of Public Works and Government 
Services or Department of National Defence.

D5401T

Effective Date
Item Status
ID
Title
2007-11-30ActiveD5401TQuality Plan - Solicitation

Remarks – Recommended Use of SACC Item

Use the following clause in bid solicitations for the Department of National Defence when a documented quality plan is required at time of bid.

Use this clause in conjunction with D5402C .

Legal text for SACC item

The Bidder must submit a Quality Plan with the bid. The Quality Plan must be in the same format that will be used after award of contract.

The Quality Plan may reference other documents. Where referenced documents do not already exist, but are required by the Quality Plan, the plan must identify them and also identify when, how and by whom they will be prepared and approved. The documents referenced in the Quality Plan must be made available when requested by Public Works and Government Services Canada or the Department of National Defence.

1999-12-13SupersededD5401TARCHIVED Quality Plan - Solicitation

D5402C

Effective Date
Item Status
ID
Title
2021-05-20ActiveD5402CQuality plan

Remarks – Recommended Use of SACC Item

Use the following clause in contracts for the Department of National Defence when a documented quality plan is required.

Use this clause in conjunction with D5510C and D5515C in the part "resulting contract clauses" of the bid solicitation. At contract award, use this clause in conjunction with D5510C or D5515C depending on whether the contractor is Canadian or non-Canadian.

In addition, use this clause in conjunction with D5401T and the associated clauses stipulating the Quality System Requirements.

Legal text for SACC item

No later than _____ days after the effective date of the Contract, the Contractor must submit for acceptance by the Department of National Defence (DND) a Quality Plan prepared according to the latest issue (at contract date) of ISO 10005:2018 "Quality management systems - Guidelines for quality plans". The Quality Plan must describe how the Contractor will conform to the specified quality requirements of the Contract and specify how the required quality activities are to be carried out, including quality assurance of subcontractors. The Contractor must include a traceability matrix from the elements of the specified quality requirements to the corresponding paragraphs in the Quality Plan.

The documents referenced in the Quality Plan must be made available when requested by Public Works and Government Services Canada or DND.

If the Quality Plan was submitted as part of the bidding process, the Contractor must review and, where appropriate, revise the submitted plan to reflect any changes in requirements or planning which may have occurred as a result of pre-contract negotiations.

Upon acceptance of the Quality Plan by DND, the Contractor must implement the Quality Plan. The Contractor must make appropriate amendments to the Quality Plan throughout the term of the contract to reflect current and planned quality activities. Amendments to the Quality Plan must be acceptable to DND.

If the Contract includes the option for software design, development or maintenance of software, the Contractor must interpret the requirements of ISO 9001:2015 "Quality management systems - Requirements", according to the guidelines of the latest issue (at contract date) of ISO/IEC 90003:2018 "Software engineering - Guidelines for the application of ISO 9001:2015 to computer software".

2010-01-11SupersededD5402CARCHIVED Quality Plan
2007-11-30SupersededD5402CARCHIVED Quality Plan

D5402D

Effective Date
Item Status
ID
Title
2005-12-16SupersededD5402DARCHIVED Quality Plan - Contract

Remarks – Recommended Use of SACC Item

Use the following clause when a documented Quality Plan is required.  The clause 
is used in conjunction with clause D5510D and the associated clauses stipulating 
the Quality System Requirements.  The blank space is to be replaced by the 
appropriate value for the contract.

Legal text for SACC item

For all contracts:

No later than _____ days after the contract date, the Contractor must 
submit for acceptance by the Department of National Defence (DND) a Quality 
Plan prepared according to the latest issue (at contract date) of ISO 10005 
Quality management systems - Guidelines for quality plans.  The Quality 
Plan shall describe how the Contractor will conform to the specified 
quality requirements of the Contract and specify how the required quality 
activities are to be carried out, including quality assurance of 
subcontractors.  The Contractor must include a traceability matrix from the 
elements of the specified quality requirements to the corresponding 
paragraphs in the Quality Plan.

The documents referenced in the Quality Plan shall be made available when 
requested by Public Works and Government Services Canada or DND.

If the Quality Plan was submitted as part of the bidding process, the 
Contractor must review and, where appropriate, revise the submitted plan to 
reflect any changes in requirements or planning which may have occurred as 
a result of pre-contract negotiations.

Upon acceptance of the Quality Plan by DND, the Contractor must implement 
the Quality Plan.  The Contractor must make appropriate amendments to the 
Quality Plan throughout the term of the contract to reflect current and 
planned quality activities.  Amendments to the Quality Plan must be 
acceptable to DND.

For contracts requiring software design, development or maintenance:

For the design, development or maintenance of software, the Contractor 
shall interpret the requirements of ISO 9001:2000 Quality management 
systems - Requirements, according to the guidelines of the latest issue (at 
contract date) of ISO/IEC 90003 Software engineering - Guidelines for the 
application of ISO 9001:2000 to computer software.


2004-12-10SupersededD5402DARCHIVED Quality Plan - Contract
2003-12-12SupersededD5402DARCHIVED Quality Plan - Contract
1998-11-23SupersededD5402DARCHIVED Quality Plan - Contract

D5500D

Effective Date
Item Status
ID
Title
1991-06-01SupersededD5500DARCHIVED Retention of Documents and Records

Remarks – Recommended Use of SACC Item

Use the following clause when the requisition specifies D-QA-001-015/SF-001, 
Quality Control and Inspection Requirements for Suppliers of Aviation Fuels and 
Into-Plane Services. 

Legal text for SACC item

Quality control and inspection records shall be retained for a period of 
   three (3) years from the completion or termination of the Contract. 

D5501D

Effective Date
Item Status
ID
Title
1991-06-01SupersededD5501DARCHIVED Retention of Documents and Records

Remarks – Recommended Use of SACC Item

Use of the following clause when the requisition specifies D-QA-001-015/SF-002, 
Quality Control and Inspection Requirements for Suppliers of Package Lubricating 
Oils and Hydraulic Fluids. 

Legal text for SACC item

Quality control and inspection records shall be retained for a period of 
   three (3) years from the date of completion or termination of the 
   Contract. 

D5502D

Effective Date
Item Status
ID
Title
1991-06-01CancelledD5502DARCHIVED Quality Control/Inspection Requirements

Remarks – Recommended Use of SACC Item

Insert the applicable specification and applicable extension period when an 
Allied Quality Assurance Publication (AQAP) is required as follows:

AQAP-1 - NATO Requirements for an Industrial Quality Control System; extension 
of 3 years.

AQAP-4 - NATO Inspection Systems Requirements for Industry;            extension 
of 3 years.

AQAP-6 - NATO Measurement and Calibration Requirements for             Industry; 
extension of 1 to 3 years.

AQAP-9 - NATO Basic Inspection Requirements for Industry;              extension 
of 1 year. 

Legal text for SACC item

In the performance of the Work described herein, the Contractor shall 
comply with the requirements of: _____ 

The Contractor shall retain quality control and inspection records for a 
   period of _____ years from the date of the completion of the Contract.

D5504D

Effective Date
Item Status
ID
Title
1992-08-01CancelledD5504DARCHIVED Quality Assurance

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

The Contractor may be requested to supply to the Quality Assurance Section, 
Canada Communication Group - Printing Services, on a monthly basis, samples 
(comprising of 1,000 sheets) of each mill run supplied to the various 
consignee locations under this Contract.

 

D5505C

Effective Date
Item Status
ID
Title
2007-11-30ActiveD5505CQuality Assurance Document

Remarks – Recommended Use of SACC Item

Use the following clause in contracts when a packing note and copies of the quality assurance document are required with each shipment.

This clause should not be used for Department of National Defence contracts.

Legal text for SACC item

The Contractor must ensure that a packing note and copies of the quality assurance document accompany each shipment. They must be enclosed in a waterproof envelope fastened to the last package of the shipment or inside the last package, which is to be marked to indicate the enclosures. In the case of a carload shipment, they must be fastened to the inside door frame of the railway car.

D5505D

Effective Date
Item Status
ID
Title
1991-06-01SupersededD5505DARCHIVED Quality Assurance Document

Remarks – Recommended Use of SACC Item

This clause should not be used in National Defence contracts.

Legal text for SACC item

A Packing Note and copies of the Quality Assurance document are to 
   accompany each shipment.  They are to be enclosed in a waterproof 
   envelope fastened to the last package of the shipment or inside the last 
   package, which is to be marked to indicate the enclosures, or in the 
   case of a carload shipment, are to be fastened to the inside door frame 
   of the railway car.

D5509C

Effective Date
Item Status
ID
Title
2021-05-20ActiveD5509CQuality Assurance Requirements - Submarine Safety

Remarks – Recommended Use of SACC Item

Use the following clause in contracts when the Department of National Defence has indicated that the goods and services required involve the manufacture, repair or overhaul of systems or equipment affecting VICTORIA Class submarine safety.

Use this clause in conjunction with D5510C or D5515C and D5540C .

Use clauses D5606C or D5604C or D5605C and D5620C in the contract for manufacturing and third-line repair and overhaul requirements.

Use clauses D5651C and D5402C , as applicable, for ship repair requirements.

Legal text for SACC item

The Work described in the Contract involves submarine systems or equipment classified as First Level or otherwise critical to submarine safety, as defined in Canadian Forces Technical Order (CFTO) C-23-VIC-000/AM-001, Quality Assurance for Safety in Submarines VICTORIA Class. Manufacture, repair, overhaul, installation, inspection and tests for each such item identified in the requirement must be documented in accordance with the requirements of the above mentioned CFTO.

For each such item, the Contractor must provide a Certificate of Conformity [form DND 2513 or locally produced equivalent approved by the Quality Assurance Authority (QAA)] in accordance with this CFTO. For subcontracted work, the Contractor must obtain that Certificate of Conformity from the subcontractor. Obtaining the said certificate from a subcontractor does not relieve the Contractor from its obligation to ensure compliance with the technical requirements of the Contract, nor must it be construed as authorizing any liability on the part of Canada to the subcontractor.

For each such item, the Certificate of Conformity, along with certified true copies of any deviation, waiver and all required records identified in the Statement of Quality Requirements (form DND 2328 or equivalent) attached to the Statement of Requirement, Statement of Work or Technical Specifications in Annex ______ to the Contract or otherwise attached to or forming part of the Contract, must be completed and made available for review by the designated QAA before release of such item and associated documents to the Department of National Defence. Unless otherwise directed by the QAA, those documents must be attached to, or enclosed with, the shipment they are associated to, in a waterproof envelope.

2011-05-16SupersededD5509CARCHIVED Quality Assurance Requirements - Submarine Safety
2010-08-16SupersededD5509CARCHIVED Quality Assurance Requirements - Submarine Safety
2010-01-11SupersededD5509CARCHIVED Quality Assurance Requirements - Submarine Safety
2007-11-30SupersededD5509CARCHIVED Quality Assurance Requirements - Submarine Safety

D5509D

Effective Date
Item Status
ID
Title
2004-12-10SupersededD5509DARCHIVED Quality Assurance Requirements - Submarine Safety

Remarks – Recommended Use of SACC Item

Use the following clause in bid solicitations and contracts where the Department 
of National Defence has clearly noted that the goods and services required 
involve the manufacture, repair or overhaul of systems or equipment affecting 
VICTORIA Class submarine safety.  This clause shall be used in conjunction with 
clause D5510D and D5541D (or D5540D if the requirement contains a design and 
development component).  For manufacturing and third-line repair and overhaul 
requirements, include clause D5601D in both the bid solicitation and contract; 
at the contract stage, include clause D5620C.  For ship repair requirements, 
include clause D5651D.  Clause D5401T may also be used in the bid solicitation, 
whereas clause D5402D may be used in both the bid solicitation and contract.

Legal text for SACC item

The Work described herein involves submarine systems or equipment 
classified as First Level or otherwise critical to submarine safety, as 
defined in Canadian Forces Technical Order (CFTO) C-23-VIC-000/AM-001, 
Quality Assurance for Safety in Submarines - VICTORIA Class.  Manufacture, 
repair, overhaul, installation, inspection and tests for each such item 
identified in the requirement shall be documented in accordance with the 
requirements of the above mentioned CFTO.

For each such item, the Contractor shall provide a Certificate of 
Conformity [form DND 2327 or locally produced equivalent approved by the 
Quality Assurance Authority (QAA)] in accordance with this CFTO.  For 
subcontracted Work, the Contractor shall obtain that Certificate of 
Conformity from the Subcontractor.  Obtaining the said certificate from a 
Subcontractor shall not relieve the Contractor from its obligation to 
ensure compliance with the technical requirements of this Contract, nor 
shall it be construed as authorizing any liability on the part of Canada to 
the Subcontractor.

For each such item, the Certificate of Conformity, along with certified 
true copies of any deviation, waiver and all required records identified in 
the Statement of Quality Requirements (form DND 2328 or equivalent) 
attached to the Statement of Requirement, Statement of Work or Technical 
Specifications in Annex "______" to the Contract or otherwise attached to 
or forming part of the Contract, shall be completed and made available for 
review by the designated QAA prior to release of such item and associated 
documents to the Department of National Defence.  Unless otherwise directed 
by the QAA, those documents shall be attached to, or enclosed with, the 
shipment they are associated to, in a waterproof envelope. 

D5510C

Effective Date
Item Status
ID
Title
2023-06-08ActiveD5510CQuality assurance authority (Department of National Defence): Canadian-based contractor

Remarks – Recommended Use of SACC Item

Use the following clause in contracts for the Department of National Defence (DND) when the work will be performed by Canadian-based contractors and when DND quality assurance at source is required.

Use this clause in conjunction with D5515C , D5604C , D5605C and D5606C , in the part "resulting contract clauses" of the bid solicitation. At contract award, use this clause in conjunction with the following clauses, as applicable: D5402C , D5509C , D5540C , D5606C and D5620C .

Legal text for SACC item

All work is subject to Government Quality Assurance performed at the Contractor's or subcontractor's facility, and at the installation site, by the Director of Quality Assurance, or its designated Quality Assurance Representative (QAR).
Director of Quality Assurance
National Defence Headquarters
MGen George R. Pearkes Building
101 Colonel By Drive
Ottawa, ON K1A 0K2
Email: ContractAdmin.DQA@forces.gc.ca

Within 48 hours of contract award, the Contractor must contact the QAR. The name, location and phone number of the QAR can be obtained from the nearest National Defence Quality Assurance Region (NDQAR) listed below:

  • Atlantic - Halifax 902-427-7150 / RDIMSHFXNDQARHALIFAX@forces.gc.ca
  • Atlantic - Enfield 902-427-7224 / rdimshfxndqarenfield@forces.gc.ca
  • Atlantic - East Marine 902-427-2354
  • Quebec - Lévis 418-564-4728 / RAQDNQcLevisHCWPC@forces.gc.ca
  • Quebec - Montreal 514-732-4401 or 514-732-4477 / NDQARMtlsvcclient@forces.gc.ca
  • Quebec - Quebec City 418-844-5000, ext. 1518 / RAQDNQcQuebec@forces.gc.ca
  • National Capital Region - Ottawa 343-549-3073 / ncr.dqa-rcn.daq@forces.gc.ca
  • Ontario - Toronto 416-633-6200 ext. 5080 / NDQAR.GTA.QAM@forces.gc.ca
  • Ontario - London 226-678-0704 / +NDQAR@forces.gc.ca
  • Manitoba/Saskatchewan - Winnipeg 204-833-2500, ext. 6574 / Joe.Taferner@forces.gc.ca
  • Alberta - 403-410-2320, ext. 3830 / Diane.Tupper@forces.gc.ca
  • British Columbia - Vancouver 604-225-2520, ext. 2461 / CRNDQA.VAN@forces.gc.ca
  • British Columbia - Victoria 250-363-1900 ext. 60236 / ESQQAWCVictoriaQAM@forces.gc.ca
  • British Columbia - Esquimalt 250-363-1900 ext. 60241 / ESQQAWCVictoriaQAM@forces.gc.ca

The Contractor is responsible for performing, or having performed, all inspections and tests necessary to substantiate that the material or services provided conform to the requirements of the Contract.

The Contractor must provide, at no additional cost, all applicable test data, all technical data, test pieces and samples as may reasonably be required by the QAR to verify conformity to the requirements of the Contract. The Contractor must forward at its expense such technical data, test data, test pieces and samples to such location as the QAR may direct.

Quality control, inspection and test records that substantiate conformity to the specified requirements, including records of corrective actions, must be retained by the Contractor for three years from the date of completion or termination of the Contract and must be made available to the QAR upon request.

2022-05-12SupersededD5510CARCHIVED Quality assurance authority (Department of National Defence): Canadian-based contractor
2017-08-17SupersededD5510CARCHIVED Quality assurance authority (Department of National Defence): Canadian-based contractor
2014-06-26SupersededD5510CARCHIVED Quality Assurance Authority (Department of National Defence) - Canadian-based Contractor
2012-07-16SupersededD5510CARCHIVED Quality Assurance Authority (Department of National Defence) - Canadian-based Contractor
2011-05-16SupersededD5510CARCHIVED Quality Assurance Authority (DND) - Canadian-based Contractor
2010-01-11SupersededD5510CARCHIVED Quality Assurance Authority (DND) - Canadian-based Contractor
2008-12-12SupersededD5510CARCHIVED Quality Assurance Authority (DND) - Canadian-based Contractor
2008-05-12SupersededD5510CARCHIVED Quality Assurance Authority (DND) - Canadian-based Contractor
2007-11-30SupersededD5510CARCHIVED Quality Assurance Authority (DND) - Canadian-based Contractor

D5510D

Effective Date
Item Status
ID
Title
2007-05-25SupersededD5510DARCHIVED Quality Assurance Authority

Remarks – Recommended Use of SACC Item

Use the following clause when Government Quality Assurance at source is 
required.  Use in conjunction with the following clauses as appropriate: D5509D, 
D5540D, D5541D, D5542D, D5601D and D5620C.

Legal text for SACC item

All work is subject to Government Quality Assurance (GQA) at the 
Contractor's facility or that of the subcontractor(s) and at the 
installation site by the:

       Director of Quality Assurance
       National Defence Headquarters
       Major-General George R. Pearkes Building
       101 Colonel By Drive
       Ottawa, ON   K1A 0K2
       E-mail:       ContractAdmin.DQA@forces.gc.ca

       OR his designated Quality Assurance Representative, hereafter 
referred to as the QAR.

For Canadian contractors

Within forty-eight (48) hours of receipt of this Contract, the Contractor 
must contact the QAR.  The name, location and phone number of the QAR can 
be obtained from the nearest National Defence Quality Assurance Region 
(NDQAR) listed below:

Atlantic - Halifax          902-427-7224 or 902-427-7150
Quebec - Montreal           514-732-4410 or 514-732-4477
Quebec - Quebec City        418-694-5998, ext. 5996
National Capital - Ottawa   819-994-9102
Ontario - Toronto           416-635-4404, ext. 6081 or 6075
Ontario - London            519-964-5757
Manitoba/Saskatchewan - Winnipeg   204-833-2500, ext. 6574
Alberta - Calgary           403-410-2320, ext. 3830
Alberta - Edmonton          780-890-6348
Vancouver                   604-225-2520, ext. 2460
Victoria                           250-363-5409

For non-Canadian contractors

If the Contractor has not been contacted by the QAR performing GQA in the 
Contractor's facility or area within forty-five (45) working days of 
receipt of the Contract, the Contractor must notify the Contracting 
Authority.

Where no official arrangements for mutual GQA have been concluded, 
Department of National Defence will arrange for the GQA services to be 
conducted by a National Quality Assurance Authority acceptable to the 
Director of Quality Assurance.  Where the GQA services are to be provided 
on a cost-recovery basis, the costs for the services are to be accrued 
against the contract and be discharged through separate invoicing.

For all contractors

The Design Change, Deviation and Waiver Procedure as defined in National 
Defence Standard D-02-006-008/SG-001 must apply to the Contract.

Note:  A copy of the standard can be obtained from the nearest NDQAR office. 

The Contractor is responsible for performing, or having performed, all 
inspections and tests necessary to substantiate that the materiel or 
services provided conform to contract requirements.

The Contractor must provide, at no additional cost to the price of the 
Contract, all applicable test data, all technical data, test pieces and 
samples as may reasonably be required by the QAR to verify conformity to 
contract requirements.  The Contractor must forward at his expense such 
technical data, test data, test pieces and samples to such location as the 
QAR may direct. 
Quality control, inspection and test records that substantiate conformity 
to the specified requirements, including records of corrective actions, 
must be retained by the Contractor for three (3) years from the date of 
completion or termination of the Contract and must be made available to the 
QAR upon request.

2004-12-10SupersededD5510DARCHIVED Quality Assurance Authority
2004-05-14SupersededD5510DARCHIVED Quality Assurance Authority
2003-12-12SupersededD5510DARCHIVED Quality Assurance Authority
2002-12-13SupersededD5510DARCHIVED Quality Assurance Authority
2002-05-24SupersededD5510DARCHIVED Quality Assurance Authority
2001-12-10SupersededD5510DARCHIVED Quality Assurance Authority
2001-05-25SupersededD5510DARCHIVED Quality Assurance Authority
2000-12-01SupersededD5510DARCHIVED Quality Assurance Authority
1999-06-21SupersededD5510DARCHIVED Quality Assurance Authority
1998-06-15SupersededD5510DARCHIVED Quality Assurance Authority
1996-10-30SupersededD5510DARCHIVED Quality Assurance Authority
1995-12-15SupersededD5510DARCHIVED Quality Assurance Authority
1995-03-31SupersededD5510DARCHIVED Quality Assurance Authority
1994-06-01SupersededD5510DARCHIVED Government Quality Assurance at Source
1993-10-29SupersededD5510DARCHIVED Government Quality Assurance at Source
1993-05-01SupersededD5510DARCHIVED GQA at source - Inspection
1992-12-01SupersededD5510DARCHIVED GQA at source - Inspection
1992-08-01SupersededD5510DARCHIVED GQA at source - Inspection

D5511C

Effective Date
Item Status
ID
Title
2010-01-11ActiveD5511CTest Validation

Remarks – Recommended Use of SACC Item

Use the following clause in contracts where test validation is considered a requirement.

Use this clause in conjunction with D5510C or D5515C .

Legal text for SACC item

  1. The Contractor must collect a sample from the first batch of each of the items that will be supplied under the Contract. The sample must consist of a group of items or portion of products of sufficient size to conduct the testing required. The Contractor must split the sample into two equal portions. One portion must be tested by the Contractor's test facility. The other portion must be tested by a facility meeting one of the following criteria:
    1. an independent, arms length third party laboratory accredited by the Standards Council of Canada (or other nationally or internationally recognized laboratory accrediting body) to conduct the tests identified in the item specification(s) or
    2. an independent, arms length third party laboratory operating a ISO 17025:2005 system, and participating regularly in a recognized proficiency testing program for the contracted product(s).
  2. Each portion must be tested to all requirements detailed in the item specification(s). The Contractor does not have to conduct tests identified by the specification(s) as qualification tests only. The Contractor does not have to conduct a test on the first batch of items if the above program for sampling and testing has been conducted within six (6) months of the date of the Contract.
  3. The Contractor must, on receipt of the third party test report, compare the results received with those of the Contractor's own test facility. Any deviation between results obtained by the two test facilities in excess of the reproducibility of the test methods involved, must be investigated, the root cause determined and corrective action taken.
  4. The Contractor must repeat the above program for sampling and testing at least once every six (6) months during the life of the Contract.
  5. The purpose of this correlation testing is to verify the quality of the contracted item(s) and to validate the capability of the Contractor's testing facility. The test report(s) received from the third party laboratory, the Contractor's test reports for the same batch(es) of contracted item(s), reports of any investigations of deviations of the results obtained by the two laboratories and any corrective actions taken, must be made available to the Quality Assurance Representative on request. Test validation must be conducted at Contractor's expense.
2007-11-30SupersededD5511CARCHIVED Test Validation

D5511D

Effective Date
Item Status
ID
Title
2003-12-12SupersededD5511DARCHIVED Test Validation

Remarks – Recommended Use of SACC Item

Use the following clause in cases where test validation is considered a 
requirement. This clause may only be used when clause D5510D is used.

Legal text for SACC item

1.     The Contractor shall collect a sample from the first batch of each 
       of the products that will be supplied under the Contract.  The 
       sample shall consist of a group of items or portion of products of 
       sufficient size to conduct the testing required.  The Contractor 
       shall split the sample into two equal portions.  One portion shall 
       be tested by the Contractor's test facility.  The other portion 
       shall be tested by a facility meeting one of the following criteria:

       (a)    an independent, arms length third party laboratory accredited 
              by the Standards Council of Canada (or other nationally or 
              internationally recognised laboratory accrediting body) to 
              conduct the tests identified in the product specification(s) 
              or

       (b)    an independent, arms length third party laboratory operating 
              a ISO 17025:1999 system, and participates regularly in a 
              recognised proficiency testing program for the contracted 
              product(s).

2.     Each portion shall be tested to all requirements detailed in the 
       product specification(s).  The Contractor does not have to conduct 
       tests identified by the specification(s) as qualification tests only.  
       The Contractor does not have to conduct a test on the first batch of 
       product if the above program for sampling and testing has been 
       conducted within six (6) months of the date of this Contract.

3.     The Contractor shall, on receipt of the third party test report, 
       compare the results received with those of the Contractor's own test 
       facility.  Any deviation between results obtained by the two test 
       facilities in excess of the reproducibility of the test methods 
       involved, shall be investigated, the root cause determined and 
       corrective action taken.

4.     The Contractor shall repeat the above program for sampling and 
       testing at least once every six (6) months during the life of the 
       Contract.

5.     The purpose of this correlation testing is to verify the quality of 
       the contracted product(s) and to validate the capability of the 
       Contractor's testing facility.  The test report(s) received from the 
       third party laboratory, the Contractor's test reports for the same 
       batch(es) of contracted product(s), reports of any investigations of 
       deviations of the results obtained by the two laboratories and any 
       corrective actions taken, shall be made available to the Quality 
       Assurance Representative on request.  Test validation shall be 
       conducted at Contractor's expense.



1998-11-23SupersededD5511DARCHIVED Test Validation

D5515C

Effective Date
Item Status
ID
Title
2010-01-11ActiveD5515CQuality Assurance Authority (Department of National Defence) - Foreign-based and United States Contractor

Remarks – Recommended Use of SACC Item

Use the following clause in contracts for the Department of National Defence (DND) when the work will be performed by foreign-based and United States contractors and when DND quality assurance at source is required.

Use this clause in conjunction with D5604C and D5605C in the part "resulting contract clauses" of the bid solicitation. At contract award, use this clause in conjunction with the following clauses as applicable: D5402C , D5509C , D5540C and D5620C .

Legal text for SACC item

All work is subject to Government Quality Assurance performed at the Contractor's or subcontractor's facility, and at the installation site, by the Director of Quality Assurance, or its designated Quality Assurance Representative (QAR).
Director of Quality Assurance
National Defence Headquarters
Major-General George R. Pearkes Building
101 Colonel By Drive
Ottawa, ON K1A 0K2
E-mail: ContractAdmin.DQA@forces.gc.ca

If the Contractor has not been contacted by the QAR performing GQA in the Contractor's facility or area within forty-five (45) working days of award of the Contract, the Contractor must notify the Contracting Authority.

Where no official arrangements for mutual GQA have been concluded, the Department of National Defence will arrange for the GQA services to be conducted by a National Quality Assurance Authority acceptable to the Director of Quality Assurance. If the GQA services must be provided on a cost-recovery basis, the costs for the services must be accrued against the Contract and be discharged through separate invoicing.

The Contractor is responsible for performing, or having performed, all inspections and tests necessary to substantiate that the materiel or services provided conform to the requirements of the Contract.

The Contractor must provide, at no additional cost, all applicable test data, all technical data, test pieces and samples as may reasonably be required by the QAR to verify conformity to the requirements of the Contract. The Contractor must forward at its expense such technical data, test data, test pieces and samples to such location as the QAR may direct.

Quality control, inspection and test records that substantiate conformity to the specified requirements, including records of corrective actions, must be retained by the Contractor for three (3) years from the date of completion or termination of the Contract and must be made available to the QAR upon request.

2008-12-12SupersededD5515CARCHIVED Quality Assurance Authority (DND) - Foreign-based and United States Contractor
2007-11-30SupersededD5515CARCHIVED Quality Assurance Authority (DND) - Foreign-based and United States Contractor

D5530D

Effective Date
Item Status
ID
Title
1993-10-29CancelledD5530DARCHIVED GQA at Destination - Non-Tech (QAC B)

Remarks – Recommended Use of SACC Item

Use the following clause in bid solicitations and contracts when the DND 
requisition specifies verification by the Department of National Defence at 
destination (DND QAC B). For requisitions with more than one Quality Assurance 
Code (QAC), the procurement officer is to identify the line item numbers which 
are associated with each QA clause.

Legal text for SACC item

The Contractor is responsible for performing or having performed all 
inspections and tests necessary to substantiate that the materiel or 
services provided conform to the Contract requirements.

This materiel is subject to verification by the Department of National 
Defence at destination.  


1992-08-01SupersededD5530DARCHIVED GQA at Destination - Non-Tech

D5531D

Effective Date
Item Status
ID
Title
1993-10-29CancelledD5531DARCHIVED GQA at Destination - Tech. (QAC A)

Remarks – Recommended Use of SACC Item

Use the following clause in bid solicitations and contracts when the DND 
requisition specifies inspection by a DND Quality Assurance Representative/Unit 
Technical Inspector at destination (DND QAC A).  For requisitions with more than 
one Quality Assurance Code (QAC), the procurement officer is to identify the 
line item numbers which are associated with each QA clause.

Legal text for SACC item

The Contractor is responsible for performing or having performed all 
inspections and tests necessary to substantiate that the materiel or 
services provided conform to the drawings, specifications and Contract 
requirements including any applicable technical requirements of the 
specified manufacturers' part number.

This materiel is subject to inspection by a Department of National Defence 
Quality Assurance Representative/Unit Technical Inspector at destination.  

1992-08-01SupersededD5531DARCHIVED GQA at Destination - Tech.

D5532D

Effective Date
Item Status
ID
Title
1993-10-29CancelledD5532DARCHIVED AQAP-110 Design/Dev./Prod.(QAC H)

Remarks – Recommended Use of SACC Item

Use the following clause when Government Quality Assurance at source and 
AQAP-110 are the requirements.  In the event the requisition has multiple 
Quality Assurance Codes, the procurement officer is to identify the line item 
numbers which are associated with each QA clause.

Legal text for SACC item

In the performance of the Work described herein, the Contractor shall 
comply with the following:

AQAP-110  NATO Quality Assurance Requirements for Design/Development and 
Production, published by NATO, current edition at date of submission of 
Contractor's bid.

1993-05-01SupersededD5532DARCHIVED AQAP-110 Design/Development/Production
1992-12-01SupersededD5532DARCHIVED GQA at Source - QUAL CONT/INSP AQAP-1
1992-08-01SupersededD5532DARCHIVED GQA at Source - QUAL CONT/INSP AQAP-1

D5533D

Effective Date
Item Status
ID
Title
1993-10-29CancelledD5533DARCHIVED AQAP-130 Inspection (QAC G)

Remarks – Recommended Use of SACC Item

Use the following clause when Government Quality Assurance at source and 
AQAP-130 are the requirements.  In the event the requisition has multiple 
Quality Assurance Codes, the procurement officer is to identify the line item 
numbers which are associated with each QA clause.

Legal text for SACC item

In the performance of the Work described herein, the Contractor shall 
comply with the following:

AQAP-130  NATO Quality Assurance Requirements for Inspection, published by 
NATO, current edition at date of submission of Contractor's bid.


1993-05-01SupersededD5533DARCHIVED AQAP-130 Inspection
1992-12-01SupersededD5533DARCHIVED GQA at Source - QUAL CONT/INSP AQAP-4
1992-08-01SupersededD5533DARCHIVED GQA at Source - QUAL CONT/INSP AQAP-4

D5534D

Effective Date
Item Status
ID
Title
1993-10-29CancelledD5534DARCHIVED AQAP-131 Final Inspection (QAC D)

Remarks – Recommended Use of SACC Item

Use the following clause when Government Quality Assurance at source and 
AQAP-131 are the requirements.  In the event the requisition has multiple 
Quality Assurance Codes, the procurement officer is to identify the line item 
numbers which are associated with each QA clause.

Legal text for SACC item

In the performance of the Work described herein, the Contractor shall 
comply with the following:

AQAP-131  NATO Quality Assurance Requirements for Final Inspection, 
published by NATO, current edition at date of submission of Contractor's 
bid.

1993-05-01SupersededD5534DARCHIVED AQAP-131 Final Inspection
1992-12-01SupersededD5534DARCHIVED GQA at Source - QUAL CONT/INSP AQAP-9
1992-08-01SupersededD5534DARCHIVED GQA at Source - QUAL CONT/INSP AQAP-9

D5535D

Effective Date
Item Status
ID
Title
1998-11-23CancelledD5535DARCHIVED AQAP-150 Software Development (QAC F)

Remarks – Recommended Use of SACC Item

Use the following clause when AQAP-150 is the requirement.This clause may only 
be used in conjunction with D5540D, Quality Assurance - ISO 9001 (QAC X) and 
where supplementary requirements for software development are appropriate.

Legal text for SACC item

In the performance of the Work described herein, the Contractor shall 
comply with the following:

       AQAP-150 -- NATO Quality Assurance Requirements for Software 
       Development,

       published by NATO, current edition at date of submission of 
       Contractor's bid.


1993-10-29SupersededD5535DARCHIVED AQAP-150 Software Development (QAC F)
1993-05-01SupersededD5535DARCHIVED AQAP-150 Software Development
1992-08-01SupersededD5535DARCHIVED GQA at Source - QUAL CONT/INSP AQAP-13

D5536D

Effective Date
Item Status
ID
Title
1993-10-29CancelledD5536DARCHIVED GQA at Source - QC/INSP-FUELS (QAC E)

Remarks – Recommended Use of SACC Item

Use the following clause in contracts placed with Canadian Contractors when the 
DND requisition specifies Government Quality Assurance at source and 
D-QA-00l-015/SF-001, (Specification for Quality Control and Inspection 
requirements for Suppliers of Aviation Fuels and Into-Plane Services) is 
required (DND QAC E).  For requisitions with more than one Quality Assurance 
Code (QAC), the procurement officer is to identify the line item numbers 
associated with each QA clause.

Legal text for SACC item

In the performance of the Work described herein, the Contractor shall 
comply with the requirements of D-QA-001-015/SF-001, Specification for 
Quality Control and Inspection Requirements for Suppliers of Aviation Fuels 
and Into-Plane Services. 

Quality control and inspection records shall be retained by the Contractor 
for a period of three (3) years from the date of completion or termination 
of the Contract.  

1992-08-01SupersededD5536DARCHIVED GQA at Source - QUAL CONT/INSP-FUELS

D5537D

Effective Date
Item Status
ID
Title
1993-10-29CancelledD5537DARCHIVED GQA at Source - QC/INSP-OILS (QAC P)

Remarks – Recommended Use of SACC Item

Use the following clause in contracts placed with Canadian Contractors when the 
DND requisition specifies Government Quality Assurance at source and 
D-QA-001-015/SF-002 (Quality Control and Inspection Requirements for Suppliers 
of Packaged Lubricating Oils and Hydraulic Fluids) is required (DND QAC P).  For 
requisitions with more than one Quality Assurance Code, the procurement officer 
is to identify the line item numbers associated with each QA clause. 

Legal text for SACC item

In the performance of the Work described herein, the Contractor shall 
comply with the requirements of D-QA-001-015/SF-002, Quality Control and 
Inspection Requirements for Suppliers of Packaged Lubricating Oils and 
Hydraulic Fluids.

Quality control and inspection records shall be retained by the Contractor 
for a period of three (3) years from the date of completion or termination 
of the Contract.  

1992-08-01SupersededD5537DARCHIVED GQA at Source - QUAL CONT/INSP-OILS

D5538D

Effective Date
Item Status
ID
Title
1993-05-01CancelledD5538DARCHIVED Quality Systems/Inspection

Remarks – Recommended Use of SACC Item

Use the following clause when Government Quality Assurance at source and/or 
destination is a requirement and the draft Requisition for Goods and Services 
has multiple Quality Assurance Codes (QACs).  If the draft Requisition for Goods 
and Services has only a single QAC, use one of the following clauses instead: 
D5530D, D5531D, D5532D, D5533D, D5534D, D5535D, D5536D, D5537D, D5539D, D5540D, 
D5541D, D5542D, or D5580D.

Legal text for SACC item

In the performance of the Work described herein, the Contractor shall 
comply with the quality system requirements identified in the Contract 
which correspond to the Quality Assurance Codes (QACs) listed on the 
continuation sheets.

D5530D - Verification at destination (QAC B)

D5531D - Inspection at destination (QAC A)

D5532D - AQAP-110 Design/Development/Production (QAC H)

D5533D - AQAP-130 Inspection (QAC G)

D5534D - AQAP-131 Final Inspection (QAC D)

D5535D - AQAP-150 Software Development (QAC F)

D5536D - D-QA-001-015/SF-001 (QAC E)

D5537D - D-QA-001-015/SF-002 (QAC P)

D5539D - AQAP-120 Production (QAC W)

D5540D - ISO 9001 Design/Development/Production (QAC X)

D5541D - ISO 9002 Production and Installation (QAC Y)

D5542D - ISO 9003 Final Inspection (QAC Z)

D5580D - U.S. FAA/DOT (QAC J)


1992-12-01SupersededD5538DARCHIVED GQA at Source - QUAL CONT/INSP
1992-08-01SupersededD5538DARCHIVED GQA at Source - QUAL CONT/INSP

D5539D

Effective Date
Item Status
ID
Title
1993-10-29CancelledD5539DARCHIVED AQAP-120 Production (QAC W)

Remarks – Recommended Use of SACC Item

Use the following clause when Government Quality Assurance at source and 
AQAP-120 are the requirements.  In the event the requisition has multiple 
Quality Assurance Codes, the procurement officer is to identify the line item 
numbers which are associated with each QA clause.

Legal text for SACC item

In the performance of the Work described herein, the Contractor shall 
comply with the following:

AQAP-120  NATO Quality Assurance Requirements for Production, published by 
NATO, current edition at date of submission of Contractor's bid.

1993-05-01SupersededD5539DARCHIVED AQAP-120 Production

D5540C

Effective Date
Item Status
ID
Title
2021-05-20ActiveD5540CISO 9001:2015 Quality Management Systems - Requirements (Quality Assurance Code Q)

Remarks – Recommended Use of SACC Item

Use the following clause in contracts for the Department of National Defence when the requisition contains line items assigned as QAC Q. In the event the requisition has multiple quality assurance codes, the contracting officer is to identify the line item numbers which are associated with each quality assurance clause.

Legal text for SACC item

In the performance of the Work described in the Contract, the Contractor must comply with the requirements of:

ISO 9001:2015 - Quality management systems - Requirements, published by the International Organization for Standardization (ISO), current edition at date of submission of Contractor's bid.

It is not intended that the Contractor be registered to ISO 9001; however, the Contractor's quality management system must address all requirements appropriate to the scope of the Work. Only exclusions in accordance with clause A.5 and 4.3 of ISO 9001 are acceptable.

Assistance for Government Quality Assurance (GQA)

The Contractor must provide the Quality Assurance Representative (QAR) with the accommodation and facilities required for the proper accomplishment of GQA and must provide any assistance required by the QAR for evaluation, verification, validation, documentation or release of product.

The QAR must have the right of access to any site of the Contractor’s, sub-contractors or any sub-tier external providers of goods and/or services where any part of the Work is being carried out. The QAR must be afforded unrestricted opportunity to evaluate and verify Contractor conformity with quality system procedures and to validate product or service conformity with the requirements of the Contract. The Contractor must make available for reasonable use by the QAR the equipment necessary for all validation purposes. Contractor personnel must be made available for operation of such equipment as required.

When the QAR determines that GQA is required at a subcontractors or external provider's facilities, the Contractor must provide for this in the purchasing document or other documented means and forward copies to the QAR, together with relevant technical data as the QAR may request.

The Contractor must notify the QAR of non-conforming product or service received from a subcontractor or external provider when the product or service has been subject to GQA.

For the design, development or maintenance of software, the Contractor must interpret the requirements of ISO 9001:2015 "Quality management systems - Requirements", according to the guidelines of the latest issue (at contract date) of ISO/IEC 90003:2018 "Software engineering - Guidelines for the application of ISO 9001:2015 to computer software".

2019-05-30SupersededD5540CARCHIVED ISO 9001:2015 Quality Management Systems - Requirements (Quality Assurance Code Q)
2010-08-16SupersededD5540CARCHIVED ISO 9001:2008 Quality Management Systems - Requirements (Quality Assurance Code Q)
2010-01-11SupersededD5540CARCHIVED ISO 9001:2008 Quality Management Systems - Requirements (QAC Q)
2007-11-30SupersededD5540CARCHIVED ISO 9001:2000 Quality Management Systems - Requirements (QAC X)

D5540D

Effective Date
Item Status
ID
Title
2004-12-10SupersededD5540DARCHIVED ISO 9001:2000 Quality Management Systems - Requirements (QAC X)

Remarks – Recommended Use of SACC Item

Use the following clause when the system required is for design and development, 
production and installation. In the event the requisition has multiple quality 
assurance codes, the contracting officer is to identify the line item numbers 
which are associated with each Quality Management Systems clause.

Legal text for SACC item

In the performance of the Work described herein, the Contractor shall 
comply with the requirements of:

       ISO 9001:2000 - Quality management systems - Requirements, published 
       by the International Organization for Standardization (ISO), current 
       edition at date of submission of Contractor's bid.

It is not the intent of this clause to require that the Contractor be 
registered to the applicable standard; however, the Contractor's quality 
management system must address each requirement contained in the standard.

Assistance for Government Quality Assurance (GQA):

The Contractor shall provide the Quality Assurance Representative (QAR) 
with the accommodation and facilities required for the proper 
accomplishment of GQA and shall provide any assistance required by the QAR 
for evaluation, verification, validation, documentation or release of 
product.

The QAR shall have the right of access to any area of the Contractor's or 
subcontractor's facilities where any part of the Work is being performed.  
The QAR shall be afforded unrestricted opportunity to evaluate and verify 
Contractor conformity with quality system procedures and to validate 
product conformity with contract requirements.  The Contractor shall make 
available for reasonable use by the QAR the equipment necessary for all 
validation purposes.  Contractor personnel shall be made available for 
operation of such equipment as required.

When the QAR determines that GQA is required at a subcontractor's 
facilities, the Contractor shall provide for this in the purchasing 
document and forward copies to the QAR, together with relevant technical 
data as the QAR may request.

The Contractor shall notify the QAR of non-conforming product received from 
a subcontractor when the product has been subject to GQA.

For the design, development or maintenance of software, the Contractor 
shall interpret the requirements of ISO 9001:2000 Quality management 
systems - Requirements, according to the guidelines of the latest issue (at 
contract date) of ISO/IEC 90003 Software engineering - Guidelines for the 
application of ISO 9001:2000 to computer software.



2003-12-12SupersededD5540DARCHIVED ISO 9001:2000 Quality Management Systems - Requirements (QAC X)
2002-12-13SupersededD5540DARCHIVED ISO 9001:2000 Quality Management Systems - Requirements (QAC X)
2001-05-25SupersededD5540DARCHIVED ISO 9001:2000 Quality Management Systems - Requirements (QAC X)
1998-11-23SupersededD5540DARCHIVED Quality Assurance - ISO 9001 (QAC X)
1998-06-15SupersededD5540DARCHIVED Quality Assurance - ISO 9001
1998-02-16SupersededD5540DARCHIVED Quality Assurance - ISO 9001
1995-03-31SupersededD5540DARCHIVED ISO 9001 Design/Dev./Prod.(QAC X)
1993-10-29SupersededD5540DARCHIVED ISO 9001 Design/Dev./Prod.(QAC X)
1993-05-01SupersededD5540DARCHIVED ISO 9001 Design/Development/Production

D5541C

Effective Date
Item Status
ID
Title
2007-11-30SupersededD5541CARCHIVED ISO 9001:2000 Quality Management Systems - Requirements (QAC Y)

Remarks – Recommended Use of SACC Item

Use the clause in contracts for the Department of National Defence when the 
system required is for production and installation only (no design and 
development).  If the requisition has multiple quality assurance codes, the 
contracting officer is to identify the line item numbers which are associated 
with each Quality Management Systems clause.

Legal text for SACC item

In the performance of the Work described in the Contract, the Contractor 
must comply with the requirements of: 

       ISO 9001:2000 - Quality management systems - Requirements, published 
       by the International Organization for Standardization (ISO), current 
       edition at date of submission of Contractor's bid with the exclusion 
       of the following requirement:

       7.3   Design and development

It is not the intent of this clause to require that the Contractor be 
registered to the applicable standard; however, the Contractor's quality 
management system must address each requirement contained in the standard.

Assistance for Government Quality Assurance (GQA)

The Contractor must provide the Quality Assurance Representative (QAR) with 
the accommodation and facilities required for the proper accomplishment of 
the GQA and must provide any assistance required by the QAR for evaluation, 
verification, validation, documentation or release of product. 

The QAR must have the right of access to any area of the Contractor's or 
subcontractor's facilities where any part of the Work is being performed. 
The QAR must be afforded unrestricted opportunity to evaluate and verify 
Contractor conformity with Quality System procedures and to validate 
product conformity with  the requirements of the Contract.  The Contractor 
must make available for reasonable use by the QAR the equipment necessary 
for all validation purposes.  Contractor personnel must be made available 
for operation of such equipment as required.

When the QAR determines that GQA is required at a subcontractor's 
facilities, the Contractor must provide for this in the purchasing document 
and forward copies to the QAR, together with relevant technical data as the 
QAR may request. 

The Contractor must notify the QAR of non-conforming product received from 
a Subcontractor when the product has been subject to GQA.


D5541D

Effective Date
Item Status
ID
Title
2003-12-12SupersededD5541DARCHIVED ISO 9001:2000 Quality Management Systems - Requirements (QAC Y)

Remarks – Recommended Use of SACC Item

Use the following clause when the system required is for production and 
installation only (no design and development).  If the requisition has multiple 
quality assurance codes, the contracting officer is to identify the line item 
numbers which are associated with each Quality Management Systems clause.

Legal text for SACC item

In the performance of the Work described herein, the Contractor shall 
comply with the requirements of: 

       ISO 9001:2000 - Quality management systems - Requirements, published 
       by the International Organization for Standardization (ISO), current 
       edition at date of submission of Contractor's bid with the exclusion 
       of the following requirement:

       7.3    Design and development

It is not the intent of this clause to require that the Contractor be 
registered to the applicable standard; however, the Contractor's quality 
management system must address each requirement contained in the standard.

Assistance for Government Quality Assurance (GQA):

The Contractor shall provide the Quality Assurance Representative (QAR) 
with the accommodation and facilities required for the proper 
accomplishment of GQA and shall provide any assistance required by the QAR 
for evaluation, verification, validation, documentation or release of 
product. 

The QAR shall have the right of access to any area of the Contractor's or 
Subcontractor's facilities where any part of the Work is being performed.  
The QAR shall be afforded unrestricted opportunity to evaluate and verify 
Contractor conformity with Quality System procedures and to validate 
product conformity with contract requirements.  The Contractor shall make 
available for reasonable use by the QAR the equipment necessary for all 
validation purposes.  Contractor personnel shall be made available for 
operation of such equipment as required.

When the QAR determines that GQA is required at a Subcontractor's 
facilities, the Contractor shall provide for this in the purchasing 
document and forward copies to the QAR, together with relevant technical 
data as the QAR may request. 

The Contractor shall notify the QAR of non-conforming product received from 
a Subcontractor when the product has been subject to GQA.



2002-12-13SupersededD5541DARCHIVED ISO 9001:2000 Quality Management Systems - Requirements (QAC Y)
2001-12-10SupersededD5541DARCHIVED ISO 9001:2000 Quality Management Systems - Requirements (QAC Y)
2001-05-25SupersededD5541DARCHIVED ISO 9001:2000 Quality Management Systems - Requirements (QAC Y)
1998-11-23SupersededD5541DARCHIVED Quality Assurance - ISO 9002 (QAC Y)
1998-06-15SupersededD5541DARCHIVED Quality Assurance - ISO 9002
1998-02-16SupersededD5541DARCHIVED Quality Assurance - ISO 9002
1995-03-31SupersededD5541DARCHIVED ISO 9002 Production/Installation (QAC Y)
1993-10-29SupersededD5541DARCHIVED ISO 9002 Production/Installation (QAC Y)
1993-05-01SupersededD5541DARCHIVED ISO 9002 Production and Installation

D5542C

Effective Date
Item Status
ID
Title
2007-11-30SupersededD5542CARCHIVED ISO 9001:2000 Quality Management Systems - Requirements (QAC Z)

Remarks – Recommended Use of SACC Item

Use the clause in contracts for the Department of National Defence when the 
system required is for final tests and inspection only.  In the event the 
requisition has multiple quality assurance codes, the contracting officer is to 
identify the line item numbers which are associated with each Quality Management 
Systems clause.

Legal text for SACC item

In the performance of the Work described in the Contract, the Contractor 
must comply with the requirements of:

       ISO 9001:2000 - Quality management systems - Requirements, published 
       by the International Organization for Standardization (ISO), current 
       edition at date of submission of Contractor's bid with the exclusion 
       of the following requirements:

       7.1    Planning of product realization 
       7.2.3  Customer communication 
       7.3    Design and development 
       7.4    Purchasing 
       7.5.1  Control of production and service provision 
       7.5.2  Validation of processes for production and service provision 
       7.5.3  Identification and traceability

It is not the intent of this clause to require that the Contractor be 
registered to the applicable standard; however, the Contractor's quality 
management system must address each requirement contained in the standard.

Assistance for Government Quality Assurance (GQA)

The Contractor must provide the Quality Assurance Representative (QAR) with 
the accommodation and facilities required for the proper accomplishment of 
GQA and must provide any assistance required by the QAR for evaluation, 
verification, validation, documentation or release of product. 

The QAR must have the right of access to any area of the Contractor's or 
subcontractor's facilities where any part of the Work is being performed. 
The QAR must be afforded unrestricted opportunity to evaluate and verify 
Contractor compliance with Quality System procedures and to validate 
product conformance with  the requirements of the Contract.  The Contractor 
must make available for reasonable use by the QAR the equipment necessary 
for all validation purposes. Contractor personnel must be made available 
for operation of such equipment as required.

When the QAR determines that GQA is required at a subcontractor's 
facilities, the Contractor must provide for this in the purchasing document 
and forward copies to the QAR, together with relevant technical data as the 
QAR may request.

The Contractor must notify the QAR of non-conforming product received from 
a Subcontractor when the product has been subject to GQA.


D5542D

Effective Date
Item Status
ID
Title
2003-12-12SupersededD5542DARCHIVED ISO 9001:2000 Quality Management Systems - Requirements (QAC Z)

Remarks – Recommended Use of SACC Item

Use the following clause when the system required is for final tests and 
inspection only.  In the event the requisition has multiple quality assurance 
codes, the contracting officer is to identify the line item numbers which are 
associated with each Quality Management Systems clause.

Legal text for SACC item

In the performance of the Work described herein, the Contractor shall 
comply with the requirements of:

       ISO 9001:2000 - Quality management systems - Requirements, published 
       by the International Organization for Standardization (ISO), current 
       edition at date of submission of Contractor's bid with the exclusion 
       of the following requirements:

       7.1    Planning of product realization 
       7.2.3  Customer communication 
       7.3    Design and development 
       7.4    Purchasing 
       7.5.1  Control of production and service provision 
       7.5.2  Validation of processes for production and service  provision 
       7.5.3  Identification and traceability

It is not the intent of this clause to require that the Contractor be 
registered to the applicable standard; however, the Contractor's quality 
management system must address each requirement contained in the standard. 

Assistance for Government Quality Assurance (GQA): 

The Contractor shall provide the Quality Assurance Representative (QAR) 
with the accommodation and facilities required for the proper 
accomplishment of GQA and shall provide any assistance required by the QAR 
for evaluation, verification, validation, documentation or release of 
product. 

The QAR shall have the right of access to any area of the Contractor's or 
Subcontractor's facilities where any part of the Work is being performed. 
The QAR shall be afforded unrestricted opportunity to evaluate and verify 
Contractor compliance with Quality System procedures and to validate 
product conformance with contract requirements. The Contractor shall make 
available for reasonable use by the QAR the equipment necessary for all 
validation purposes. Contractor personnel shall be made available for 
operation of such equipment as required.

When the QAR determines that GQA is required at a Subcontractor's 
facilities, the Contractor shall provide for this in the purchasing 
document and forward copies to the QAR, together with relevant technical 
data as the QAR may request.

The Contractor shall notify the QAR of non-conforming product received from 
a Subcontractor when the product has been subject to GQA.

2002-12-13SupersededD5542DARCHIVED ISO 9001:2000 Quality Management Systems - Requirements (QAC Z)
2001-12-10SupersededD5542DARCHIVED ISO 9001:2000 Quality Management Systems - Requirements (QAC Z)
2001-05-25SupersededD5542DARCHIVED ISO 9001:2000 Quality Management Systems - Requirements (QAC Z)
1998-11-23SupersededD5542DARCHIVED Quality Assurance - ISO 9003 (QAC Z)
1998-06-15SupersededD5542DARCHIVED Quality Assurance - ISO 9003
1998-02-16SupersededD5542DARCHIVED Quality Assurance - ISO 9003
1995-03-31SupersededD5542DARCHIVED ISO 9003 Final Inspection (QAC Z)
1993-10-29SupersededD5542DARCHIVED ISO 9003 Final Inspection (QAC Z)
1993-05-01SupersededD5542DARCHIVED ISO 9003 Final Inspection

D5543C

Effective Date
Item Status
ID
Title
1995-03-31SupersededD5543CARCHIVED Contractor Quality System (QAC C)

Remarks – Recommended Use of SACC Item

Use the following clause in contracts when clause D5543T was used.

Legal text for SACC item

The Contractor shall be responsible for implementing a quality system 
appropriate to the scope of the work to be performed.

The Contractor shall be responsible for performing or having performed all 
inspections and tests necessary to substantiate that the materiel or 
services provided conform to the drawings, specifications and contract 
requirements.  The Contractor shall keep accurate and complete inspection 
records which shall, upon request, be made available to the authorized 
Department of National Defence (DND)representative, who may make copies 
thereof and take extracts therefrom during the performance of the Contract 
and for a period of one (1) year thereafter.

The Contracting Authority and DND shall have access to the Work at any time 
during working hours where any part of the Work is being carried out and 
may make examinations and such tests of the Work as they may think fit 
under the circumstances. Should the Work or any part thereof not be in 
accordance with the requirements of the Contract, the authorized DND 
representative  shall have the right to reject the Work and require its 
correction or replacement at the Contractor's expense.  DND shall inform 
the Contractor of the motives for any such rejection.

Notwithstanding the foregoing, all materiel is subject to verification and 
acceptance by DND at destination prior to payment.  The authorized DND 
representative at destination may either be the consignee(s), the Technical 
Authority, or the Quality Assurance Authority.

D5543D

Effective Date
Item Status
ID
Title
2004-12-10SupersededD5543DARCHIVED ISO 9001:2000 - Quality Management Systems - Requirements (QAC C)

Remarks – Recommended Use of SACC Item

Use the following clause when conformance with the contract requirements can 
adequately be determined at destination (identity, condition and count).  In the 
event the requisition has multiple Quality Assurance (QA) codes, the contracting 
officer is to identify the line items that are associated with each QA clause.

Legal text for SACC item

The Contractor shall be responsible for implementing a quality system 
appropriate to the scope of the work to be performed.  It is recommended 
that the quality system be based on ISO 9001:2000 - Quality Management 
Systems - Requirements.

The Contractor shall be responsible for performing or having performed all 
inspections and tests necessary to substantiate that the materiel or 
services provided conform to the drawings, specifications and contract 
requirements.  The Contractor shall keep accurate and complete inspection 
records which shall, upon request, be made available to the authorized 
Department of National Defence (DND) representative, who may make copies 
thereof and take extracts therefrom during the performance of the Contract 
and for a period of one (1) year thereafter.

The Contracting Authority and DND shall have access to the Work at any time 
during working hours where any part of the Work is being carried out and 
may make examinations and such tests of the Work as they may think fit 
under the circumstances.  Should the Work or any part thereof not be in 
accordance with the requirements of the Contract, the authorized DND 
representative shall have the right to reject the Work and require its 
correction or replacement at the Contractor's expense.  DND shall inform 
the Contractor of the motives for any such rejection.

Notwithstanding the foregoing, all materiel is subject to verification and 
acceptance by DND at destination.  The authorized DND representative at 
destination may either be the consignee(s), the Technical Authority, or the 
Quality Assurance Authority.

2003-12-12SupersededD5543DARCHIVED ISO 9001:2000 - Quality Management Systems - Requirements (QAC C)
2002-12-13SupersededD5543DARCHIVED ISO 9001:2000 - Quality Management System - Requirements (QAC C)
1998-11-23SupersededD5543DARCHIVED Contractor Quality System (QAC C)

D5543T

Effective Date
Item Status
ID
Title
1995-03-31CancelledD5543TARCHIVED Contractor Quality System (QAC C)

Remarks – Recommended Use of SACC Item

Use the following clause in bid solicitations when the Department of National 
Defence (DND) requisition specifies acceptance by DND at destination (DND QAC 
C).  For requisitions with more than one Quality Assurance Code (QAC), the 
procurement officer is to identify the line item numbers which are associated 
with each QA clause. When new bid solicitations are being issued, use the 
following clause wherever QAC A (clause D5531D) or QAC B (clause D5530D) is 
called up in a requisition. Use this clause in conjunction with clause D5543C.

Legal text for SACC item

Bidders are encouraged to implement a quality system, appropriate to the 
scope of the work to be performed, based on the applicable model of the ISO 
9000 series.

The Contractor shall be responsible for implementing a quality system 
appropriate to the scope of the work to be performed.

The Contractor shall be responsible for performing or having performed all 
inspections and tests necessary to substantiate that the materiel or 
services provided conform to the drawings, specifications and contract 
requirements.  The Contractor shall keep accurate and complete inspection 
records which shall, upon request, be made available to the authorized 
Department of National Defence (DND) representative, who may make copies 
thereof and take extracts therefrom during the performance of the Contract 
and for a period of one (1) year thereafter.

The Contracting Authority and DND shall have access to the Work at any time 
during working hours where any part of the Work is being carried out and 
may make examinations and such tests of the Work as they may think fit 
under the circumstances.  Should the Work or any part thereof not be in 
accordance with the requirements of the Contract, the authorized DND 
representative  shall have the right to reject the Work and require its 
correction or replacement at the Contractor's expense.  DND shall inform 
the Contractor of the motives for any such rejection.

Notwithstanding the foregoing, all materiel is subject to verification and 
   acceptance by DND at destination prior to payment.  The authorized DND 
   representative at destination may either be the consignee(s), the 
   Technical Authority, or the Quality Assurance Authority.

D5544C

Effective Date
Item Status
ID
Title
2021-05-20ActiveD5544CLaboratories - ISO/IEC 17025:2017

Remarks – Recommended Use of SACC Item

Use the following clause in contracts for the Department of National Defence when the work under the contract is for the calibration or testing of equipment.

Legal text for SACC item

In the performance of the Work described in the Contract, the Contractor must conform to the requirements of:

ISO/IEC 17025:2017 General requirements for the competence of testing and calibration laboratories.

The Contractor's quality management system must address each requirement contained in the standard, however, the Contractor is not required to be registered to the applicable standard.

Assistance for Government Quality Assurance (GQA)

The Contractor must provide the Quality Assurance Representative (QAR) with the accommodation and facilities required for the proper accomplishment of GQA and must provide any assistance required by the QAR for evaluation, verification, validation, documentation or release of product.

The QAR must have the right of access to any area of the Contractor's or subcontractor's facilities where any part of the Work is being performed. The QAR must be afforded unrestricted opportunity to evaluate and verify Contractor conformity with Quality System procedures and to validate product conformity with the requirements of the Contract. The Contractor must make available for reasonable use by the QAR the equipment necessary for all validation purposes. Contractor personnel must be made available for operation of such equipment as required.

When the QAR determines that GQA is required at a subcontractor's facilities, the Contractor must provide for this in the purchasing document and forward copies to the QAR, together with relevant technical data as the QAR may request.

The Contractor must notify the QAR of non-conforming product received from a Subcontractor when the product has been subject to GQA.

2010-01-11SupersededD5544CARCHIVED Laboratories - ISO/IEC 17025:2005
2007-11-30SupersededD5544CARCHIVED Laboratories - ISO/IEC 17025:2005

D5544D

Effective Date
Item Status
ID
Title
2006-06-16SupersededD5544DARCHIVED Laboratories - ISO/IEC 17025:2005

Remarks – Recommended Use of SACC Item

Use the following clause when the work under contract is for calibration or 
testing of equipment.

Legal text for SACC item

In the performance of the Work described herein, the Contractor shall 
conform to the requirements of:

       ISO/IEC 17025:2005 General requirements for the competence of 
       testing and calibration laboratories.

It is not the intent of this clause to require that the Contractor be 
registered to the applicable standard; however, the Contractor's quality 
management system must address each requirement contained in the standard.

Assistance for Government Quality Assurance (GQA):

The Contractor shall provide the Quality Assurance Representative (QAR) 
with the accommodation and facilities required for the proper 
accomplishment of GQA and shall provide any assistance required by the QAR 
for evaluation, verification, validation, documentation or release of 
product.

The QAR shall have the right of access to any area of the Contractor's or 
Subcontractor's facilities where any part of the Work is being performed.  
The QAR shall be afforded unrestricted opportunity to evaluate and verify 
Contractor conformity with Quality System procedures and to validate 
product conformity with contract requirements.  The Contractor shall make 
available for reasonable use by the QAR the equipment necessary for all 
validation purposes.  Contractor personnel shall be made available for 
operation of such equipment as required.

When the QAR determines that GQA is required at a Subcontractor's 
facilities, the Contractor shall provide for this in the purchasing 
document and forward copies to the QAR, together with relevant technical 
data as the QAR may request.

The Contractor shall notify the QAR of non-conforming product received from 
   a Subcontractor when the product has been subject to GQA.
2003-12-12SupersededD5544DARCHIVED Laboratories - ISO/IEC 17025:1999
2002-12-13SupersededD5544DARCHIVED Quality Assurance - ISO 10012-1
1998-11-23SupersededD5544DARCHIVED Quality Assurance - ISO 10012-1
1995-03-31SupersededD5544DARCHIVED Inspection/Measuring/Test Equipment

D5545C

Effective Date
Item Status
ID
Title
2019-05-30ActiveD5545CISO 9001:2015 - Quality Management Systems - Requirements (Quality Assurance Code C)

Remarks – Recommended Use of SACC Item

Use the following clause in contracts for the Department of National Defence when the requisition contains line items assigned QAC C. In the event the requisition has multiple quality assurance codes, the contracting officer is to identify the line items that are associated with each quality assurance clause.

Legal text for SACC item

The Contractor is responsible for implementing a quality system appropriate to the scope of the work to be performed. It is recommended that the quality system be based on ISO 9001:2015 "Quality management systems - Requirements."

The Contractor is responsible for performing or having performed all inspections and tests necessary to substantiate that the materiel or services provided conform to the drawings, specifications and the requirements of the contract. The Contractor must keep accurate and complete inspection records which must, upon request, be made available to the authorized Department of National Defence (DND) representative, who may make copies and take extracts during the performance of the Contract and for a period of one (1) year after the completion of the Contract.

Despite the above, all materiel is subject to verification and acceptance by DND at destination. The authorized DND representativeat destination may either be the consignee(s), the Technical Authority, or the Quality Assurance Authority.

2010-08-16SupersededD5545CARCHIVED ISO 9001:2008 - Quality Management Systems - Requirements (Quality Assurance Code C)
2010-01-11SupersededD5545CARCHIVED ISO 9001:2008 - Quality Management Systems - Requirements (QAC C)
2007-11-30SupersededD5545CARCHIVED ISO 9001:2000 - Quality Management Systems - Requirements (QAC C)

D5545D

Effective Date
Item Status
ID
Title
1995-12-15CancelledD5545DARCHIVED ISO 9000 Certification Requirement

Remarks – Recommended Use of SACC Item

This clause can be used in conjunction with D5540D, D5541D or D5542D for 
clarification purposes when full certification is not required. This clause must 
immediately follow the ISO 9000 inspection clause.

Legal text for SACC item

It is not the intent of the previous clause to require that the Contractor 
be registered to the applicable standard; however, the Contractors' quality 
system must address each element contained in the model.


D5580C

Effective Date
Item Status
ID
Title
2007-11-30ActiveD5580CCivil Aircraft Inspection (Quality Assurance Code J)

Remarks – Recommended Use of SACC Item

Use the following clause in contracts when the requisition specifies U.S. Federal Aviation Administration (FAA) and/or Canadian Department of Transport regulations (DND QAC J). If the requisition has multiple quality assurance codes, the contracting officer is to identify the line item numbers which are associated with each quality assurance clause.

Legal text for SACC item

The Contractor must inspect the Work described in the Contract in compliance with the requirements of the U.S. Federal Aviation Administration (FAA) and/or the Canadian Department of Transport (DOT) civil aircraft regulations. The Work is subject to verification by the Department of National Defence at destination. Proof of inspection must accompany each shipment.

The material must be released for shipment to the consignee(s) using properly completed FAA or DOT approved inspection documents. The completed inspection document(s) must be attached to, or enclosed with, each shipment, as applicable, in compliance with FAA/DOT regulations.

D5580D

Effective Date
Item Status
ID
Title
1998-11-23SupersededD5580DARCHIVED Civil Aircraft Inspection (QAC J)

Remarks – Recommended Use of SACC Item

Use the following clause when the requisition specifies U.S. Federal Aviation 
Administration (FAA) and/or Canadian Department of Transport regulations (DND 
QAC J). If the requisition has multiple Quality Assurance (QA) codes, the 
contracting officer is to identify the line item numbers which are associated 
with each QA clause.

Legal text for SACC item

The Work described herein shall be inspected in compliance with the 
requirements of the U.S. Federal Aviation Administration (FAA) and/or the 
Canadian Department of Transport (DOT) civil aircraft regulations and is 
subject to verification by the Department of National Defence at 
destination.  Proof of inspection shall accompany each shipment.

The materiel is to be released for shipment to the consignee(s) using 
properly completed FAA or DOT approved inspection documents. The completed 
inspection document(s) shall be attached to, or enclosed with, each 
shipment, as applicable, in compliance with FAA/DOT regulations.


1995-03-31SupersededD5580DARCHIVED Inspection - U.S. FAA/DOT (QAC J)
1994-06-01SupersededD5580DARCHIVED Inspection - U.S. FAA/DOT (QAC J)
1993-10-29SupersededD5580DARCHIVED Inspec. Require.- U.S. FAA/DOT (QAC J)
1992-08-01SupersededD5580DARCHIVED Inspection Requirements - U.S. FAA/DOT

D5600D

Effective Date
Item Status
ID
Title
1992-12-01SupersededD5600DARCHIVED Release Documents U.S. FAA/DOT

Remarks – Recommended Use of SACC Item

Use the following clause if the requisition specifies U.S. Federal Aviation 
Administration (FAA) or Canadian Department of Transport approved inspection 
documents and clause D5580D is used.

Legal text for SACC item

The materiel is to be released for shipment to the consignee(s) using 
properly completed U.S. Federal Aviation Administration (FAA) or Canadian 
Department of Transport (DOT) approved inspection documents.  The completed 
inspection document(s) shall be attached to, or enclosed with, each 
shipment, as applicable, in compliance with FAA/DOT regulations.

1992-08-01SupersededD5600DARCHIVED Release Documents U.S. FAA/DOT
1991-06-01SupersededD5600DARCHIVED Release Documents - U.S. FAA/DOT

D5601C

Effective Date
Item Status
ID
Title
1991-06-01CancelledD5601CARCHIVED Release Documents - CF 1280

Remarks – Recommended Use of SACC Item

Use the following clause if the requisition specifies form CF 1280 and clause 
D5601T was used.  Enter fill-in data.  See also clauses D5602C and D5600D.

Legal text for SACC item

Materiel is to be released for shipment using either form CF 1280, 
   Certificate of Inspection and Release, or a release document meeting the 
   requirements of the Department of National Defence.  Forms CF 1280 or 
   other release documents will be prepared by the Contractor and, when 
   properly completed and signed, distributed as follows: _____ . 

D5601D

Effective Date
Item Status
ID
Title
2003-12-12SupersededD5601DARCHIVED Release Documents - Contractor

Remarks – Recommended Use of SACC Item

Use the following clause when clause D5510D was used.  At the contract stage, 
include clause D5620C.

Legal text for SACC item

Materiel is to be released for shipment using one of the release documents 
indicated below:

FOR CANADIAN CONTRACTORS

Unless otherwise directed by the Department of National Defence (DND) 
Quality Assurance Authority, signature of the DND Quality Assurance 
Representative (QAR) on the release document is not required.

Materiel is to be released for shipment using either DND form CF 1280, 
Certificate of Inspection and Release, or a release document containing the 
same information.  Release document(s) shall be prepared by the Contractor.

For return of materiel from repair and overhaul contractors to the Canadian 
Forces Supply System Upgrade (CFSSU), use forms DND 2227/DND 2228 in lieu 
of DND form CF 1280.

FOR UNITED STATES (U.S.) CONTRACTORS

Materiel is to be released for shipment using a DD Form 250, Materiel 
Inspection and Receiving Report, or a release document containing the same 
information and acceptable to the QAR. Release document(s) shall be 
prepared by the Contractor.

FOR NON-CANADIAN CONTRACTORS (EXCEPT U.S)

Materiel is to be released for shipment using a Certificate of Conformity 
in accordance with NATO STANAG 4107 which shall be prepared by the 
Contractor.



1996-10-30SupersededD5601DARCHIVED Release Documents - Contractor
1995-03-31SupersededD5601DARCHIVED Release Documents - Contractor
1994-06-01SupersededD5601DARCHIVED GQA at Source - Release Documents
1993-10-29SupersededD5601DARCHIVED GQA at Source - Release Documents
1993-05-01SupersededD5601DARCHIVED GQA at Source - Release Documents
1992-08-01SupersededD5601DARCHIVED GQA at Source - Release Documents

D5601T

Effective Date
Item Status
ID
Title
1991-06-01SupersededD5601TARCHIVED Release Documents - CF 1280

Remarks – Recommended Use of SACC Item

Use the following clause when the requisition specifies form CF 1280.  Use 
clause D5601C in the contract. 

Legal text for SACC item

Materiel is to be released for shipment using either form CF 1280, 
   Certificate of Inspection and Release, or a release document meeting the 
   requirements of the Department of National Defence.  Forms CF 1280 or 
   other release documents will be prepared by the Contractor and, when 
   properly completed and signed, distributed as directed in the Contract.

D5602C

Effective Date
Item Status
ID
Title
1991-06-01SupersededD5602CARCHIVED Release Documents - CF 1280 (U.S.)

Remarks – Recommended Use of SACC Item

Use the following clause if the requisition specifies form CF 1280 and 
contractor resides in the U.S.A. and clause D5602T was used. Enter distribution 
as per requisition. 

Legal text for SACC item

Materiel is to be released for shipment using a  DD form 250, Materiel 
   Inspection and Receiving Report.  DD Form 250 will be prepared by the 
   Contractor and, when properly completed and signed, be distributed as 
   follows: _____ . 

D5602T

Effective Date
Item Status
ID
Title
1991-06-01SupersededD5602TARCHIVED Release Documents - CF 1280 (US)

Remarks – Recommended Use of SACC Item

Use the following clause when the requisition specifies form CF 1280, 
Certificate of Inspection and Release, and supplier resides in the U.S.A.  Use 
clause D5602C in the contract.

Legal text for SACC item

Materiel is to be released for shipment using a DD form 250, Material 
   Inspection and Receiving Report.  DD form 250 will be prepared by the 
   Contractor and, when properly completed and signed, be distributed as 
   directed in the Contract.

D5603C

Effective Date
Item Status
ID
Title
1991-06-01SupersededD5603CARCHIVED Release Documents - CF 1280/Site Instal.

Remarks – Recommended Use of SACC Item

Use the following clause if the requisition specifies form CF 1280 and delivery 
to and completion of installation at site is required and clause D5603T was 
used. 

Legal text for SACC item

On completion of the installation, form CF 1280, Certificate of Inspection 
and Release, shall be prepared by the Contractor listing the Contract items 
and, when properly completed and signed by the Department of National 
Defence Quality Assurance Representative, be distributed as follows: _____ . 

The equipment shall remain the responsibility of the Contractor until 
   accepted by an authorized Department of National Defence representative. 

D5603T

Effective Date
Item Status
ID
Title
1991-06-01SupersededD5603TARCHIVED Release Documents - CF1280/Site Install.

Remarks – Recommended Use of SACC Item

Use the following clause when the requisition specifies form CF 1280 and 
delivery to and completion of installation at site is required. Use clause 
D5603C in contract. 

Legal text for SACC item

On completion of the installation, form CF 1280, Certificate of Inspection 
   and Release, shall be prepared by the Contractor listing the Contract 
   items and, when properly completed and signed by the Department of 
   National Defence Quality Assurance Representative, be distributed as 
   directed in the Contract. 

D5604C

Effective Date
Item Status
ID
Title
2008-12-12ActiveD5604CRelease Documents (Department of National Defence) - Foreign-based Contractor

Remarks – Recommended Use of SACC Item

Use the following clause in contracts for the Department of National Defence when the goods are supplied by a foreign-based contractor (except United States).

Use this clause in conjunction with D5515C and D5620C .

Legal text for SACC item

Material must be released for shipment using a Certificate of Conformity in accordance with NATO STANAG 4107 which must be prepared by the Contractor.

2007-11-30SupersededD5604CARCHIVED Release Documents (DND) - Foreign-based Contractor

D5605C

Effective Date
Item Status
ID
Title
2021-05-20ActiveD5605CRelease Documents (Department of National Defence) - United States-based Contractor

Remarks – Recommended Use of SACC Item

Use the following clause in contracts for the Department of National Defence when the goods are supplied by a United States-based contractor.

Use this clause in conjunction with D5515C and D5620C in the part "resulting contract clauses" of the bid solicitation.

Legal text for SACC item

Material must be released for shipment using a DD Form 250, Material Inspection and Receiving Report, or a release document containing the same information and acceptable to the Quality Assurance Representative. The Contractor must prepare the release document(s).

2010-01-11SupersededD5605CARCHIVED Release Documents (Department of National Defence) - United States-based Contractor
2007-11-30SupersededD5605CARCHIVED Release Documents (DND) - United States-based Contractor

D5606C

Effective Date
Item Status
ID
Title
2017-11-28ActiveD5606CRelease documents (Department of National Defence): Canadian-based contractor

Remarks – Recommended Use of SACC Item

Use the following clause in contracts for the Department of National Defence when the goods are supplied by a Canadian-based contractor.

Use this clause in conjunction with D5510C , D5604C and D5605C in the part "resulting contract clauses" of the bid solicitation. At contract award, use this clause in conjunction with D5510C .

Use this clause in conjunction with D5620C .

Legal text for SACC item

Unless otherwise directed by the Department of National Defence (DND) Quality Assurance Authority, the signature of the DND Quality Assurance Representative on the release document is not required.

Material must be released for shipment using either DND form CF 1280, Certificate of Release, Inspection and Acceptance,or a release document containing the same information. The Contractor must prepare the release document(s).

For return of repair and overhaul material to the Defence Supply Chain, use forms DND 2227/DND 2228 in lieu of DND form CF 1280.

2012-07-16SupersededD5606CARCHIVED Release Documents (Department of National Defence) - Canadian-based Contractor
2007-11-30SupersededD5606CARCHIVED Release Documents (DND) - Canadian-based Contractor

D5620C

Effective Date
Item Status
ID
Title
2012-07-16ActiveD5620CRelease Documents - Distribution

Remarks – Recommended Use of SACC Item

Use the following clause in contracts if the clause D5606C was used except where the contract is for repair and overhaul with a Canadian-based contractor who has an account on the Canadian Forces Supply System. Contracting officers are to insert the designation of the originator of the requisition.

Legal text for SACC item

The Contractor must prepare the release documents in a current electronic format and distribute them as follows:

  1. One (1) copy mailed to consignee marked: "Attention: Receipts Officer";
  2. Two (2) copies with shipment (in a waterproof envelope) to the consignee;
  3. One (1) copy to the Contracting Authority;
  4. One (1) copy to:

    National Defence Headquarters
    Mgen George R. Pearkes Building
    101 Colonel By Drive
    Ottawa, ON K1A OK2
    Attention: _____
  5. One (1) copy to the Quality Assurance Representative;
  6. One (1) copy to the Contractor; and
  7. For all non-Canadian contractors, one (1) copy to:

    DQA/Contract Administration
    National Defence Headquarters
    Mgen George R. Pearkes Building
    101 Colonel By Drive
    Ottawa, ON K1A OK2

    E-mail: ContractAdmin.DQA@forces.gc.ca.

NOTE: For into-plane refuelling contracts b, c and d above are not required.

2007-11-30SupersededD5620CARCHIVED Release Documents - Distribution
2007-05-25SupersededD5620CARCHIVED Release Documents - Distribution
1998-02-16SupersededD5620CARCHIVED Release Documents - Distribution
1995-03-31SupersededD5620CARCHIVED Release Documents - Distribution
1994-06-01SupersededD5620CARCHIVED Release Documents - Distribution
1993-10-29SupersededD5620CARCHIVED Release Documents - Distribution
1993-05-01SupersededD5620CARCHIVED Release Documents - Distribution
1992-12-01SupersededD5620CARCHIVED GQA at Source - Dist of Documents
1992-08-01SupersededD5620CARCHIVED GQA at Source - Dist of Documents

D5650D

Effective Date
Item Status
ID
Title
2004-12-10CancelledD5650DARCHIVED Government Quality Assurance - Ship Repairs

Remarks – Recommended Use of SACC Item

Use the following clause when the requisition is for ship repairs (Department of 
National Defence QAC L).  Use in conjunction with clauses D5510D and D5651D.

Legal text for SACC item

The Work described herein shall be controlled and inspected in compliance 
with the requirements of general conditions 1026A and supplemental general 
conditions 1029.


1992-08-01SupersededD5650DARCHIVED GQA - controlled/inspected - Ship Repairs

D5651C

Effective Date
Item Status
ID
Title
2017-08-17ActiveD5651CRelease documents and acceptance of ships

Remarks – Recommended Use of SACC Item

Use the following clause in contracts for ship refits when acceptance of ships and vessels is subject to procedures.

Legal text for SACC item

The acceptance of ships and vessels must be in accordance with the procedures of CFTO C-03-005-012/AM-001, Part 8, using form CF 1148, Report of Inspection of (SHIP) and, as applicable, form CF 702, Acceptance of (SHIP) into the Canadian Forces.

2007-11-30SupersededD5651CARCHIVED Release Documents/Acceptance of Ships

D5651D

Effective Date
Item Status
ID
Title
1995-03-31SupersededD5651DARCHIVED Release Documents/Acceptance of Ships

Remarks – Recommended Use of SACC Item

Use the following clause when clause D5650D was used.

Legal text for SACC item

The acceptance of ships and vessels shall be in accordance with the 
procedures of CFTO C-03-005-012/AM-001, Part 13, using form CF 1148, Report 
of Inspection of (SHIP) and, as applicable, form CF 702, Acceptance of 
(SHIP) into the Canadian Forces.

1992-08-01SupersededD5651DARCHIVED GQA - Acceptance of Ships

D5700D

Effective Date
Item Status
ID
Title
1992-08-01CancelledD5700DARCHIVED GQA - Site Install

Remarks – Recommended Use of SACC Item

Use the following clause whenever installation activity is to be verified on 
site by the Director General Quality  Assurance. Include release document clause 
D5701C in the Contract.                 

Legal text for SACC item

All installation work shall be subject to Government Quality Assurance (GQA).  
The Quality Assurance Authority for all work provided under this Contract 
is the Director General Quality Assurance, Department of National Defence, 
MGen George R. Pearkes Building, Ottawa, Ontario.  K1A 0K2, or his 
delegated representative.  At least 30 days prior to the commencement of 
work at the installation, the Contractor shall make arrangements for 
on-site GQA with the Director, Quality Assurance Operations, Site 
Installation Supervisor, (613) 996-4625.

The Design Change, Deviation and Waiver Procedure as defined in National 
Defence Standard D-02-006-008/SG-001 shall apply to this Contract.                                               

All work performed by the Contractor at the installation site  shall be 
controlled and inspected in compliance with the requirements of AQAP-4, 
NATO Inspection System Requirements for Industry.

Quality Control and Inspection records shall be retained by the Contractor 
for a period of three (3) years from the date of completion or termination 
of the Contract.

The Contractor is responsible for delivery, installation and proving of the 
equipment.  The equipment shall remain the responsibility of the Contractor 
until accepted by an authorized DND representative.

Proof of Government Quality Assurance is required in the form of properly 
completed release documents.  Such proof is required by DND prior to 
payment of invoices.

On completion of the installation, form CF 1280, Certificate of Inspection 
and Release, shall be prepared by the Contractor listing the contract items 
and, when properly completed and signed by the Department of National 
Defence Quality Assurance Representative (QAR), be distributed as directed 
in the Contract.


D5701C

Effective Date
Item Status
ID
Title
1992-12-01CancelledD5701CARCHIVED GQA - Site Instal - Release Documents

Remarks – Recommended Use of SACC Item

Use the following clause if the requisition specifies form CF 1280 and delivery 
to and completion of installation at site is required and clause D5700D was 
used.  Enter the distribution as per the requisition.

Legal text for SACC item

On completion of the installation, form CF 1280, Certificate of Inspection 
and Release, listing the contract items, shall be prepared by the 
Contractor and when signed by the Quality Assurance Representative shall be 
distributed as follows:  _____

1992-08-01SupersededD5701CARCHIVED GQA - Site Instal - Release Documents

D5710D

Effective Date
Item Status
ID
Title
1992-08-01CancelledD5710DARCHIVED EMC Compliance Testing

Remarks – Recommended Use of SACC Item

Use the following clause when the DND requisition specifies the requirement for 
Electromagnetic Compatibility Compliance Testing.

Legal text for SACC item

The Contractor and any of his subcontractors shall ensure that all test 
facilities used for Electromagnetic Compatibility (EMC) compliance testing 
are recognized by DND as having the necessary specific capabilities. They 
shall further ensure that all facilities in the United States to be used 
for EMC compliance testing are recognized under the National Voluntary 
Accreditation program (NVLAP) as having the necessary specific capabilities.  

Facilities other than Canadian and U.S. must be recognized under an 
equivalent certification program that is acceptable to DND.  Contractors 
and subcontractors with test facilities not recognized, but used to perform 
EMC compliance testing, shall take action to have their capabilities 
reviewed prior to commencement of any EMC compliance testing and the 
facility must be acceptable to the DND Quality Assurance Authority.  

Testing will be witnessed by government personnel when judged necessary by 
the DND Quality Assurance Authority or his/her delegated representative.  
This requirement is in addition to any other quality assurance clauses.  

Where the necessary and specific capabilities for EMC compliance testing 
are found lacking, no further testing shall proceed until such time as the 
Contractor rectifies the situation to the satisfaction of the DND Quality 
Assurance Authority or his/her delegated representative.

D5720D

Effective Date
Item Status
ID
Title
1992-08-01CancelledD5720DARCHIVED Test Reports - Grade 8 Fasteners

Remarks – Recommended Use of SACC Item

Use the following clause to outline Contractor responsibility for provision of 
test reports when the procurement is for Grade 8 material fasteners Class 5305 
and 5306.

Legal text for SACC item

For all Grade 8 material fasteners being provided as a requirement of this 
Contract, the Contractor shall provide a valid chemical test report to the 
Quality Assurance Representative (QAR) prior to shipment. If the test 
report is not available from the original manufacturer, the Contractor 
shall have the analysis performed at the Contractor's expense, at a test 
facility acceptable to the QAR.

D5725C

Effective Date
Item Status
ID
Title
2008-05-12ActiveD5725CInspection/Test Reports - Safety Critical Items

Remarks – Recommended Use of SACC Item

Use the following clause in contracts for the Department of National Defence to outline the contractor's responsibility to inspect and provide an inspection/test report of actual measurements taken when procurement is for Safety Critical Class 3 Threaded Fasteners, NATO Stock Number classes 5305, 5306, 5307, 5310 and 5315.

Use this clause in conjunction with D5510C or D5515C .

Legal text for SACC item

  1. For items identified in the Contract as Safety Critical Class 3 fasteners, NATO Stock Number classes 5305, 5306, 5307, 5310 and 5315, the Contractor must provide to the Quality Assurance Representative (QAR) a valid inspection/test report of the results obtained for the following parameters:
    1. "GO" functional diameter size;
    2. pitch diameter size;
    3. major diameter size (external threads only);
    4. minor diameter size (does not apply to ______ (insert applicable specification) external threads);
    5. root radius (applies to ______ (insert applicable specification) external threads only);
    6. flank angle;
    7. lead (including helix variations);
    8. circularity;
    9. taper;
    10. runout; and
    11. surface roughness.
  2. Definitions of these terms can be found in the latest issue of ______ (insert applicable specification).
  3. If the differential between "GO" functional and pitch diameter does not exceed ______ (insert applicable dimension and pertinent specification) of the pitch diameter tolerance, inspection of the flank angle and lead (including helix variations) is not necessary.
  4. The Contractor must provide actual measurement results obtained for 100 percent of the contract quantity.
  5. If the inspection/test report is not available from the manufacturer, the Contractor must have the inspection performed, at the Contractor's expense, either at its own facility or at a facility acceptable to the QAR.

D5725D

Effective Date
Item Status
ID
Title
1994-06-01SupersededD5725DARCHIVED Test Reports - Safety Critical Items

Remarks – Recommended Use of SACC Item

Use the following clause to outline Bidder/Contractor responsibility to inspect 
and provide an inspection/test report of actual measurements taken when 
procurement is for Safety Critical Class 3 Threaded Fasteners, NSN classes 5305, 
5306, 5307, 5310 and 5315.

Legal text for SACC item

1.     Items identified as Safety Critical Class 3 fasteners on the 
       Contract, require the Contractor to provide to the Quality Assurance 
       Representative (QAR) a valid inspection/test report of the results 
       obtained for the following parameters:

       (a)    "go" functional diameter size;
       (b)    pitch diameter size;
       (c)    major diameter size (external threads only);
       (d)    minor diameter size (does not apply to MIL-S-7742 external 
              threads);
       (e)    root radius (applies to MIL-S-8879 external threads only);
       (f)    flank angle;
       (g)    lead (including helix variations);
       (h)    circularity;
       (j)    taper;
       (k)    runout; and
       (l)    surface roughness

2.     If the differential between "GO" Functional and Pitch diameter does 
       not exceed 0.5 for MIL-S-7742 or 0.4 for MIL-S-8879 of the Pitch 
       diameter tolerance, inspection of the Flank Angle and Lead 
       (including helix variations) is not necessary.

3.     Definitions of these terms can be found in the latest revision of 
       MIL-S-7742 or MIL-S-8879.

4.     The Contractor shall provide actual measurement results obtained for 
       100 percent of the contract quantity.

5.     If the inspection/test report is not available from the manufacturer, 
       the Contractor shall have the inspection performed, at the 
       Contractor's expense, either at his own facility or at a facility 
       acceptable to the QAR.

6.     The Bidder/Contractor hereby certifies that the stated unit price 
       for each of the items identified above includes the Test Reports 
       called up under this clause.



       __________________          _____________
       Signature                          Date

7.     Failure to provide this certification will result in your bid being 
       declared as non-responsive.

1992-08-01SupersededD5725DARCHIVED Test Reports - Safety Critical Items

D5725T

Effective Date
Item Status
ID
Title
2008-05-12ActiveD5725TInspection/Test Reports - Safety Critical Items - Certification

Remarks – Recommended Use of SACC Item

Use the following clause in bid solicitations for the Department of National Defence for procurement of Safety Critical Class 3 threaded fasteners, NATO Stock Number classes 5305, 5306, 5307, 5310 and 5315.

Use this clause in conjunction with D5725C .

Legal text for SACC item

By submitting a bid, the Bidder certifies that the stated price for each of the items above includes inspection/test reports called up under clause D5725C.

D5726D

Effective Date
Item Status
ID
Title
1994-06-01CancelledD5726DARCHIVED Test Reports - Non-safety Critical Items

Remarks – Recommended Use of SACC Item

Use the following clause to outline Bidder/Contractor responsibility to inspect 
and provide an inspection/test report of actual measurements taken when 
procurement is for Non-Safety Critical Class 3 Threaded Fasteners.  NSN Classes 
5305, 5306, 5307, 5310 and 5315.

Legal text for SACC item

If Class 3 Threaded Fasteners are being provided as a requirement of the 
Contract, then the Contractor shall provide to the Quality Assurance 
Representative (QAR) a valid inspection/test report of the results obtained 
for the following parameters:


       a.     "go" functional diameter size;

       b.     pitch diameter size;

       c.     major diameter size (external threads only);

       d.     minor diameter size (does not apply to MIL-S-7742 external 
              threads); and

       e.     root radius (applies to MIL-S-8879 external threads only);

Unless otherwise specified, the above excludes self-locking nuts, internal 
threads smaller than 0.190 inch diameter, and external threads smaller than 
0.138 inch diameter.

Products manufactured prior to March 1993 where Pitch diameter or 
Functional Diameter cannot be accomplished due to configuration change (e.g. 
deformation, slots, self-locking devices), acceptance shall be based on 
performance requirements only.  For products manufactured after March 1993, 
the screw threads shall be measured at the point of manufacture prior to 
configuration change.

Definitions of these terms can be found in the latest revision of 
MIL-S-7742 or MIL-S-8879.

Copies of the original manufacturing inspection data with batch/lot 
traceability covering the above parameters, a. through e., may be utilized 
or, if not available, then the Contractor shall use the sampling table 
shown below and shall test/record the results for the thread elements 
listed.

Contract Quantity           Sample Size

1                           1
2-8                         2
9-15                        3
16-25                       5
26-50                       8
51-90                       13
91-150                      20
151-280                     32
281-500                     50
501-1200                    80
1201-3200                   125
3201-10000                  200
10001-35000                 315
over 35000                  500

If the inspection/test report is not available from the manufacturer, the 
Contractor shall have the inspection performed, at the Contractor's expense, 
either at his own facility or at a facility acceptable to the QAR.

The Bidder/Contractor hereby certifies that the stated unit price for each 
of the items identified above includes the Test Reports called up under 
this clause.




Signature                                                          

Date



Failure to provide this certification will result in your bid being 
declared as non-responsive. 

1992-08-01SupersededD5726DARCHIVED Test Reports - Non-safety Critical Items

D5800D

Effective Date
Item Status
ID
Title
1991-06-01CancelledD5800DARCHIVED Inspection and Acceptance

Remarks – Recommended Use of SACC Item

Use the following clause for maintenance or repair and overhaul contracts when 
the work is performed on-site by a mobile repair party.

Legal text for SACC item

The Contractor shall comply with the requirements of _____.

All matters, pertaining to the performance of Work on-site shall be 
   referred to _____, who shall signify satisfactory completion and 
   acceptance of the Work by signing _____. 

D5801C

Effective Date
Item Status
ID
Title
2008-05-12ActiveD5801COutstanding Work and Acceptance

Remarks – Recommended Use of SACC Item

Use the following clause in marine refit, repair, and conversion contracts.

If a warranty holdback will be applied to the final payment for the contract then contracting officers are to insert the sentence that makes reference to the holdback.

Legal text for SACC item

  1. The Inspection Authority, in conjunction with the Contractor, will prepare a list of outstanding work items at the end of the work period. This list will form the annexes to the formal acceptance document for the vessel. A contract completion meeting will be convened by the Inspection Authority on the work completion date to review and sign off the form PWGSC-TPSGC 1205, Acceptance. (Insert, if applicable: "In addition to any amount held under the Warranty Holdback Clause, a holdback of twice the estimated value of outstanding work will be held until that work is completed").
  2. The Contractor must complete the above form in three (3) copies, which will be distributed by the Inspection Authority as follows:
    1. original to the Contracting Authority;
    2. one copy to the Technical Authority;
    3. one copy to the Contractor.
2007-11-30SupersededD5801CARCHIVED Outstanding Work and Acceptance

D5801D

Effective Date
Item Status
ID
Title
2002-12-13SupersededD5801DARCHIVED Acceptance Document (Civilian)

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

1.     On delivery of the said vessel to Canada, form PWGSC-TPSGC 1205, 
       Ship Refit and Repair - Civilian Departments (Acceptance Form - 
       Victoria), shall be completed and signed as required on the form.

2.     The Acceptance Form is to be completed in quintuplicate: 
       distribution is to be made by Public Works and Government Services 
       Canada field representative as follows:

       (a)    original to: Contracting Authority

       (b)    copy to: _____

       (c)    copy to: _____

       (d)    copy to: _____

       (e)    copy to: _____.

1998-02-16SupersededD5801DARCHIVED Acceptance Document (Civilian)
1991-06-01SupersededD5801DARCHIVED Acceptance Document (Civilian)

D5802D

Effective Date
Item Status
ID
Title
1991-06-01SupersededD5802DARCHIVED Acceptance Document

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

On delivery of the vessel to the Crown, the Acceptance Document, form 
DND-MDN CF1148, shall be completed and signed. 

D5900C

Effective Date
Item Status
ID
Title
2007-11-30ActiveD5900CBasis of Pricing - Inspection and Technical Services

Remarks – Recommended Use of SACC Item

Use the following clause in contracts for inspection and technical services for ship refit, if applicable. Contracting officers must identify the "Lead On-site Inspector" in the contract.

Legal text for SACC item

  1. For the provision of Inspection Services as and when required during the period commencing _____ until _____ to carry out the Work as stated in Annex ____ , on an all inclusive firm by day chargeout rate.
    Calendar year: 20____
    $_____ by day
  2. Overtime, if necessary, and where authorized by the Lead On-site Inspector of the Public Works and Government Services Canada Inspection Office, at the following firm chargeout rates:
    Outside regular hours: $_____
    Monday to Friday incl.: ______ by hour
    Outside regular hours: $_____
    Saturday and Sunday: $ ______ by hour.

D5900D

Effective Date
Item Status
ID
Title
1998-02-16SupersededD5900DARCHIVED Pricing

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

1.     For the provision of Inspection Services as and when required during 
       the period commencing _____ until _____ to carry out the above work, 
       on an all inclusive firm per diem chargeout rate.

       CALENDAR YEAR: 19____ 

       $_____ per diem

2.     Overtime, if necessary, and where authorized by the Senior Inspector 
       of the Department of Public Works and Government Services Inspection 
       Office, at the following firm chargeout rates:

       Outside regular hours:      $_____
       Monday to Friday incl.:     per hour

       Outside regular hours:      $_____
       Saturday and Sunday: per hour.
1991-06-01SupersededD5900DARCHIVED Pricing

D5901D

Effective Date
Item Status
ID
Title
1998-02-16CancelledD5901DARCHIVED Inspection Office - DPWGS

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

The Inspectors shall report to the Senior Inspector of the Department of 
Public Works and Government Services (DPWGS) Inspection Office: _____.

DPWGS Inspection Office: _____.

The worksite shall be co-located with the DPWGS Inspection Office.
1991-06-01SupersededD5901DARCHIVED Inspection Office - DSS

D5902D

Effective Date
Item Status
ID
Title
1998-02-16CancelledD5902DARCHIVED Personal Suitability

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

In the event that the assigned inspector cannot perform his or her duties 
   for any reason whatsoever, or, in the opinion of the Chief Inspector, is 
   not discharging his or her duties satisfactorily, the Inspector shall be 
   removed and replaced upon thirty (30) days' notice of dissatisfaction.
1991-06-01SupersededD5902DARCHIVED Personal Suitability

D5903D

Effective Date
Item Status
ID
Title
1998-02-16SupersededD5903DARCHIVED Professional Qualifications

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

1.     Marine Inspectors shall be qualified by the Inspection and Technical 
       Services Directorate of the Department of Public Works and 
       Government Services, Aerospace, Marine and Electronics Systems 
       Sector, Ottawa, Ontario.

2.     The qualification process will include a Résumé review and where 
       necessary a personal interview to assess candidate's knowledge, 
       ability and experience. Bidders are to identify proposed candidates, 
       their area of expertise, and provide Résumés for evaluation.

       Candidate                          Area of expertise

       1. _____                           _____

       2. _____                           _____

       3. _____                           _____
1991-06-01SupersededD5903DARCHIVED Professional Qualifications

D5903T

Effective Date
Item Status
ID
Title
1998-03-15CancelledD5903TARCHIVED Professional Qualifications

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

1.     Marine Inspectors shall be qualified by the Inspection and Technical 
       Services Directorate of the Department of Public Works and 
       Government Services, Aerospace, Marine and Electronics Systems 
       Sector, Ottawa, Ontario.

2.     The qualification process will include a Résumé review and where 
       necessary a personal interview to assess candidate's knowledge, 
       ability and experience. Bidders are to identify proposed candidates, 
       their area of expertise, and provide Résumés for evaluation.

       Candidate                          Area of expertise

       1. _____                           _____

       2. _____                           _____

       3. _____                           _____

D5904D

Effective Date
Item Status
ID
Title
1991-06-01CancelledD5904DARCHIVED Inspection and Technical Services

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

ANTICIPATED LEVEL OF EFFORT - INSPECTION AND TECHNICAL SERVICES:   
1.     For planning purposes only the anticipated level of effort for each 
       discipline will be:

       (a)  hull: _____ days;
       (b)  electrical: _____ days;
       (c)  electronics: _____ days;
       (d)  machinery: _____ days.
   

D5909D

Effective Date
Item Status
ID
Title
1998-02-16SupersededD5909DARCHIVED Administration Provisions

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

1.     For the purposes of this requirement, the following working hours 
       and overtime periods shall apply:

       (a)    A normal working day shall be any 7.5-hour period between the 
              hours of 7:00 a.m. and 5:00 p.m., Monday to Friday inclusive, 
              and totalling 37.5 hours per week.

       (b)    Overtime Monday to Friday will commence after 7.5 hours of 
              continuous work each day.

       (c)    Overtime Saturday and Sunday will be any period worked either 
              Saturday or Sunday.

2.     Travel beyond a 25-mile radius of the work site will, when 
       authorized by the Department of Public Works and Government Services 
       (DPWGS) Inspection Office, be paid in accordance with Treasury Board 
       Travel Directives for the Public Service, current issue in force at 
       the time, and such expense incurred shall be paid without any 
       allowance for overhead or profit.

3.     No allowance will be made for any removal expense incurred by the 
       assigned personnel either to or from the work area.

4.     During the term of the Contract, the scheduling of vacation time and
   /or time off for the incumbent shall be as per agreement with and the 
   prior approval of the DPWGS Inspection Office, whose prime concern will 
   be to ensure adequate staff is available at all times.
1991-06-01SupersededD5909DARCHIVED Administration Provisions

D5910D

Effective Date
Item Status
ID
Title
1991-06-01SupersededD5910DARCHIVED Conflict of Interest

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

1.     In order to avoid any real or apparent conflicts of interest, the 
       Contractor hereby agrees that it will not, during the term of the 
       contract, undertake or perform services on behalf of, or contract 
       with the Shipbuilder - _____. 

2.     The Contractor further agrees that it will ensure that personnel 
       provided, pursuant to this Contract, shall devote their full time 
       and attention to the performance of the services to be provided 
       hereunder and will not, therefore, be in a position of any possible 
       conflict of interest during the term hereof. 

3.     It shall be a term of the Contract: 

       (a)    that no former public office holder who is not in compliance 
              with the post-employment provisions of the Conflict of 
              Interest and Post-Employment Code for Public Office Holders 
              shall derive a direct benefit from this Contract; and 

       (b)    that during the term of the Contract any persons engaged in 
              the course of carrying out this Contract shall conduct 
              themselves in compliance with the principles of the Conflict 
              of Interest and Post-Employment Code for Public Office 
              Holders. Should an interest be acquired during the life of 
              the Contract that would cause a conflict of interest or seem 
              to cause a departure from the principles, the Contractor 
              shall declare it immediately to the departmental 
              representative.
  

D5911D

Effective Date
Item Status
ID
Title
1991-06-01SupersededD5911DARCHIVED Method of Payment

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

1. Payment by Her Majesty for the work shall be made within thirty (30) 
days following the date on which an invoice and substantiating 
documentation are received according to the terms of the Contract. 

2. If Her Majesty has any objection to the form of the invoice or the 
   substantiating documentation, within fifteen (15) days of its receipt 
   She shall notify the Contractor of the nature of the objection. "Form of 
   the invoice" means an invoice which contains or is accompanied by such 
   substantiating documentation as Her Majesty requires. Failure by Her 
   Majesty to act within 15 days will only result in the date specified in 
   paragraph 1 of the clause to apply for the sole purpose of calculating 
   interest on overdue accounts.  

D5912D

Effective Date
Item Status
ID
Title
1992-01-31SupersededD5912DARCHIVED Method of Payment

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

Payment in full will be made after receipt of an invoice, completion of all 
   work, and receipt and acceptance of all deliverables by the Project 
   Authority.  

D5913D

Effective Date
Item Status
ID
Title
1992-01-31SupersededD5913DARCHIVED Method of payment

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

Payment will be made monthly for all tasks called-up and completed within 
   the month, after receipt of an invoice which contains an itemized 
   account of all tasks and the relevant call-up reference numbers.  

D6000C

Effective Date
Item Status
ID
Title
1991-06-01SupersededD6000CARCHIVED Shipping Instructions

Remarks – Recommended Use of SACC Item

Use the following clause in contracts placed with a U.S. supplier where there is 
a possibility of shipments exceeding 20,000 lbs.  When requests for routing 
instructions are received from the supplier, the directorate will refer such 
requests to the Consumer Products and Traffic Management Branch, to obtain 
details of shipping instructions. 

Legal text for SACC item

Immediately it is known there will be available a shipment weighing 20,000 
lbs. or over, the Contractor is to notify the _____ Directorate, Department 
of Supply and Services, Hull, Quebec, Canada K1A 0S5 who will issue routing 
instructions.  Shipment is not to be made until such instructions are 
received.  Report of availability must state the following:

       1.  contract number,
       2.  gross weight and freight classification,
       3.  name of railway serving the Contractor's plant site,
       4.  the Contractor's recommended method of shipment and
           cost,
       5.  name of consignee and destination,
       6.  location of stores and date of availability.

Unless otherwise directed, all shipments shall be shipped collect in 
   accordance with the Shipping provisions of this Contract.

D6000D

Effective Date
Item Status
ID
Title
2003-12-12SupersededD6000DARCHIVED Shipping Instructions - United States Supplier

Remarks – Recommended Use of SACC Item

Do not use this clause for Department of National Defence requirements.

Use the following clause in contracts and bid solicitations placed with a United 
States supplier.  When requests for routing instructions are received from the 
supplier, the contracting officer will refer such requests to the Traffic 
Management Directorate, National Programs Sector, to obtain details of routing 
instructions.

Legal text for SACC item

1.     In cases where the Contractor pays the shipping charges and absorbs 
       these charges as part of the purchase price, the Contractor may ship 
       the goods in accordance with its regular shipping practice. 

2.     In cases where Canada either pays the shipping charges or the 
       Contractor pays the shipping charges and Canada reimburses the 
       Contractor for direct and identifiable shipping charges, Canada 
       reserves the right to provide shipping instructions to the 
       Contractor, as follows: 

       (a)    for shipments (truck/rail) weighing under 10,000 lbs and (air) 
              under 1,000 lbs, the Contractor shall, unless otherwise 
              directed, ship the goods in accordance with its regular 
              shipping practice,

       (b)    for shipments (truck/rail) weighing 10,000 lbs or over and 
              (air) over 1,000 lbs, the Contractor shall:

              (i)    provide at the first opportunity the Contracting 
                     Authority with the following information:

                     -      contract number;
                     -      commodity and freight classification;
                     -      gross weight and cube of shipment;
                     -      name of railway serving the Contractor's plant 
                            site (if applicable);
                     -      shipping point and address;
                     -      date of availability;
                     -      consignee and destination address;
                     -      Contractor's recommended method of shipment and 
                            cost;
                     -      type of packaging and dimensions of each 
                            package;
                     -      if shipment is dangerous goods/hazardous 
                            materiel, the United Nations number, class, 
                            division, packing group and packing 
                            instructions;
                     -      contact name and phone number; and

              (ii)   not make any shipment prior to receiving directions 
                     from the Contracting Authority concerning mode of 
                     shipment, carrier, routing, and method of billing for 
                     transportation charges.

1997-09-15SupersededD6000DARCHIVED Shipping Instructions

D6001C

Effective Date
Item Status
ID
Title
1991-06-01SupersededD6001CARCHIVED Shipping Instructions

Remarks – Recommended Use of SACC Item

Use the following clause in all FOB plant (origin) contracts valued at $ 25,000 
or more, where destinations are not known at the time of award of the contract.  
When shipping detail is received by a contracting officer, the Traffic 
Management Group, Consumer Products and Traffic Management Branch will be 
requested to provide shipping instructions, which will be relayed by the 
contracting officer to the contractor.  Include clause C5201C in the contract. 
Buyer will obtain fill-in data concerning the weight from the Traffic Management 
Group.

Legal text for SACC item

Notwithstanding the Shipping provisions of this Contract, as soon as it is 
known that a shipment weighing _____lbs.  (_____kg) or over will be 
available, and provided the consignee is known, the Contractor shall 
request shipping instructions from the _____ Directorate, Department of 
Supply and Services, Hull, Quebec, Canada K1A 0S5, giving the following 
information:

       1.  shipping weight and cubic measurement per unit,
       2.  freight classification,
       3.  name of shipping point,
       4.  name of rail carrier if plant is served by siding,
       5.  recommended method of shipment and cost.

Shipments are not to be made until instructions have been received.  

D6002C

Effective Date
Item Status
ID
Title
1991-06-01CancelledD6002CARCHIVED Shipping Notices

Remarks – Recommended Use of SACC Item

The following clause is used by the Aerospace, Marine and Electronics 
Directorate, where applicable.  Enter fill-in data.

Legal text for SACC item

When the goods are shipped, copies of the appropriate shipping notices are 
   to be forwarded to the Department of Supply and Services, Aerospace, 
   Marine and Electronics Directorate, and to the Department of National 
   Defence, attention: _____ .

D6003D

Effective Date
Item Status
ID
Title
1991-06-01CancelledD6003DARCHIVED Consignee

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

Shipment shall be consigned to: _____


D6004D

Effective Date
Item Status
ID
Title
1991-06-01CancelledD6004DARCHIVED Consignee

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

Shipment shall be consigned FOB including all delivery charges to: _____


D6005D

Effective Date
Item Status
ID
Title
1991-06-01CancelledD6005DARCHIVED Consignee

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

Shipment shall be consigned via bonded carrier to: _____


D6006D

Effective Date
Item Status
ID
Title
2003-12-12CancelledD6006DARCHIVED Shipping Instructions - DND Ammunition

Remarks – Recommended Use of SACC Item

Use the following clause when contractors must obtain shipping instructions for 
ammunition.

Legal text for SACC item

1.     At or prior to ammunition deliverable end items becoming available 
       for shipment, the Contractor shall request shipping instructions 
       from National Defence Quality Assurance Representative and provide 
       the following information:

       (a)    Work Order Number;
       (b)    NATO Stock Number and Description; and
       (c)    recommended method of shipment.

2.     The Contractor shall not ship any ammunition deliverable end items 
       until instructions are received from:

       NDQAR TA TORONTO
       ATTENTION: Canadian Forces Quality Assurance
       4900 Yonge Street
       Toronto, Ontario
       Canada    M2M 6B7

       Telephone:    1-877-447-7701 (TOLL FREE), OR
                     (416) 635-4405, ext. 6101/ 6102 / 6103 / 6104

       Facsimile:    (416) 635-2757 / 2758, OR
                     1-877-877-7409 (TOLL FREE).

1996-10-30SupersededD6006DARCHIVED Shipping Instructions, Ammunition

D6007C

Effective Date
Item Status
ID
Title
2014-09-25ActiveD6007CWork Period - Marine - Contract

Remarks – Recommended Use of SACC Item

Use the following clause in contracts for ship refit, repair and conversion, if applicable.

Use this clause in conjunction with D6007T .

Legal text for SACC item

  1. Work must commence and be completed as follows:
    Commence: ______ (insert date);
    Complete: _______ (insert date).
  2. The Contractor certifies that they have sufficient material and human resources allocated or available and that the above work period is adequate to both complete the known work and absorb a reasonable amount of unscheduled work.
2007-11-30SupersededD6007CARCHIVED Work Period - Marine
1999-06-21SupersededD6007CARCHIVED Work Period - Marine
1991-06-01SupersededD6007CARCHIVED Delivery - Ship Repair

D6007T

Effective Date
Item Status
ID
Title
2014-09-25ActiveD6007TWork Period - Marine - Bid

Remarks – Recommended Use of SACC Item

Use the following clause in bid solicitations for ship refit, repair and conversion.

Legal text for SACC item

  1. Work must commence and be completed as follows:
    Commence: _______ (insert date)
    Complete: ________ (insert date).
  2. By submitting a bid, the Bidder certifies that they have sufficient material and human resources allocated or available and that the above work period is adequate to both complete the known work and absorb a reasonable amount of unscheduled work.
2007-11-30SupersededD6007TARCHIVED Work Period - Marine

D6008C

Effective Date
Item Status
ID
Title
2008-05-12ActiveD6008CBatteries

Remarks – Recommended Use of SACC Item

Use the following clause in contracts for non-commercial, off-the-shelf or special production run batteries, to define delivery tolerances.

Legal text for SACC item

When the Contractor is required to supply other than commercial off-the-shelf batteries or must make a special production run of batteries, the following over/under run allowances are acceptable:

  1. for quantities 1 to 500, plus or minus 5 percent;
  2. for quantities 501 to 5,000, plus or minus 2.5 percent; and
  3. for quantities in excess of 5,000, plus or minus 1 percent.

D6008D

Effective Date
Item Status
ID
Title
1996-10-30SupersededD6008DARCHIVED Quantity Supplied, Batteries

Remarks – Recommended Use of SACC Item

Use this clause to define delivery tolerances for special production runs of 
batteries.

Legal text for SACC item

1.     Where the Contractor is required to supply other than commercial 
       off-the-shelf batteries or must make a special production run of 
       batteries, the following over/under run allowances are acceptable:

       (a)    for quantities 1 to 500, plus or minus 5 percent;
       (b)    for quantities 501 to 5000, plus or minus 2.5 percent; and
       (c)    for quantities in excess of 5000, plus or minus 1 percent.

D6009C

Effective Date
Item Status
ID
Title
2021-12-02ActiveD6009CShipping instructions: Delivery and destination schedules unknown

Remarks – Recommended Use of SACC Item

Use the following clause in contracts for the Department of National Defence when destination and delivery schedules are not known at the time of contract award.

Legal text for SACC item

  1. The Contractor must ship the goods prepaid DDP - Delivered Duty Paid (... named place of destination). Unless otherwise directed, delivery must be made by the most economical means. Shipping charges must be shown as a separate item on the Contractor's invoice. The Contractor is responsible for all delivery charges, administration, costs and risks of transport and customs clearance, including the payment of customs duties and Applicable Taxes.
  2. The Contractor must deliver the goods to Canadian Forces (CF) Supply Depots by appointment only. The Contractor or its carrier must arrange delivery appointments by contacting the Depot Traffic Section at the appropriate location shown below. The consignee may refuse shipments when prior arrangements have not been made.
    1. 7 CF Supply Depot Lancaster Park
      Edmonton, Alta
      Email: Edm-7CFSDNMDS@forces.gc.ca
    2. 25 CF Supply Depot Montreal
      Montreal, Qué.
      Email: 25DAFCTrafficRDV@forces.gc.ca
    3. 2B1 CF Esquimalt
      Esquimalt, B.C.
      Telephone: 250-363-4963
    4. 7H1 CF Halifax
      Halifax, N.S.
      Email: P-HFX.BLog.CargoOps@intern.mil.ca
2017-11-28SupersededD6009CARCHIVED Shipping instructions: Delivery and destination schedules unknown
2013-04-25SupersededD6009CARCHIVED Shipping Instructions - Delivery and Destination Schedules Unknown
2008-05-12SupersededD6009CARCHIVED Shipping Instructions - Delivery and Destination Schedules Unknown

D6009D

Effective Date
Item Status
ID
Title
2004-05-14SupersededD6009DARCHIVED Shipping Instructions - Delivery and Destination Schedules Unknown

Remarks – Recommended Use of SACC Item

Use the following clause in contracts and bid solicitations competed on behalf 
of Department of National Defence where destination and delivery schedules are 
not known at the time of execution.

Legal text for SACC item

1.     The Contractor shall ship prepaid DDP Delivery Duty Paid (_____ 
       named place of destination).  Unless otherwise directed, delivery 
       shall be made by the most economical means.  Shipping charges shall 
       be shown as a separate item on the Contractor's invoice.  The 
       Contractor is responsible for all delivery charges, administration, 
       costs and risks of transport and customs clearance, including the 
       payment of customs duties and taxes.

2.     The Contractor shall make deliveries to Canadian Forces (CF) Supply 
       Depots by appointment only.  The Contractor or its carrier shall 
       arrange delivery appointments by contacting the Depot Traffic 
       Section at the appropriate location shown below.  The consignee may 
       refuse shipments when prior arrangements have not been made.

       (a)    7 CF Supply Depot Lancaster Park
              Edmonton, Alta
              Telephone: (780) 973-4011, ext. 4524

       (b)    25 CF Supply Depot Montreal
              Montreal, Qué.
              Telephone: (514) 252-2777, ext. 2363

       (c)    2B1 CF Esquimalt
              Esquimalt, B.C.
              Telephone: (250) 363-4963

       (d)    7H1 CF Halifax
              Halifax, N.S.
              Telephone: (902) 427-0550


2003-12-12SupersededD6009DARCHIVED Shipping Instructions - Delivery and Destination Schedules Unknown
2000-12-01SupersededD6009DARCHIVED Shipping Instructions
2000-05-12SupersededD6009DARCHIVED Shipping Instructions
1996-10-30SupersededD6009DARCHIVED Shipping Instructions

D6010C

Effective Date
Item Status
ID
Title
2007-11-30ActiveD6010CPalletization

Remarks – Recommended Use of SACC Item

Use this clause in contracts to define the palletization requirements for shipments to Canadian Forces Supply Depots.

Legal text for SACC item

  1. For all shipments exceeding 0.566 m3 or 15.88 kg (20 ft3 or 35 lbs), except for those shipped by courier, the following applies:
    1. The Contractor must strap, and if necessary wrap, shipments on standard 1.22 m x 1.02 m (48 in. x 40 in.) wood pallets. The four-way forklift entry pallet must be supplied at no charge to Department of National Defence. Total height, including pallet, must not exceed 1.19 m (47 in.). The pallet load must not extend further than 2.54 cm (1 in.) from any edge of the pallet.
    2. The Contractor must group items by stock number (on the same pallet) within consolidated shipments. Pallet loads composed of more than one stock number must be marked as "Mixed Items".
    3. Individual items exceeding 1.22 m (48 in.) in length or 453.6 kg (1000 lbs) must be secured to larger pallets or must have 10.16 cm x 10.16 cm (4 in. x 4 in.) skids securely fastened to the bottom of the item. Skids must be separated by a minimum of 71.12 cm (28 in.).
  2. Any exception requires the prior approval of the Contracting Authority.

D6010D

Effective Date
Item Status
ID
Title
2004-12-10SupersededD6010DARCHIVED Palletization

Remarks – Recommended Use of SACC Item

Use this clause to define the palletization requirements for shipments to 
Canadian Forces Supply Depots.

Legal text for SACC item

1.     For all shipments exceeding 0.566 m3 or 15.88 kg (20 ft3 or 35 lbs), 
       except for those shipped by courier, the following shall apply:

       (a)    The Contractor shall strap, and if necessary wrap, shipments 
              on standard 1.22 m x 1.02 m (48 in. x 40 in.) wood pallets.  
              The four-way forklift entry pallet shall be supplied at no 
              charge to Department of National Defence .  Total height, 
              including pallet, shall not exceed 1.19 m (47 in.).  The 
              pallet load shall not extend further than 2.54 cm (1 in.) 
              from any edge of the pallet.

       (b)    The Contractor shall group items by stock number (on the same 
              pallet) within consolidated shipments.  Pallet loads composed 
              of more than one stock number shall be marked as "MIXED ITEMS
              ".

       (c)    Individual items exceeding 1.22 m (48 in.) in length or 453.6 
              kg (1000 lbs) shall be secured to larger pallets or shall 
              have 10.16 cm x 10.16 cm (4 in. x 4 in.) skids securely 
              fastened to the bottom of the item.  Skids shall be separated 
              by a minimum of 71.12 cm (28 in.).

2.     Any exception shall require the prior approval of the Contracting 
       Authority.


1996-10-30SupersededD6010DARCHIVED Palletization

D6012C

Effective Date
Item Status
ID
Title
2008-05-12ActiveD6012CShipping Instructions

Remarks – Recommended Use of SACC Item

Do not use this clause for food and bulk fertilizer for external aid or for Department of National Defence requirements.

Use the following clause in contracts awarded on the basis of FOB Free on Board origin when the contractor is to ship the goods in accordance with the shipping instructions provided by Canada and when:

  1. the delivery points are known and the material is shipped from a point in the United States (U.S.); or
  2. the delivery points are not known at contract award and the material is shipped from either a point in Canada or the U.S.

Legal text for SACC item

In addition to the shipping requirements contained in the section entitled "Transportation Charges" in the general conditions, the Contractor must ship the goods in accordance with the following shipping instructions:

  1. for shipments (truck/rail) weighing under 10,000 lbs and (air) under 1,000 lbs, the Contractor must, unless otherwise directed, ship the goods in accordance with normal shipping practice;
  2. for shipments (truck/rail) weighing 10,000 lbs and over and (air) 1,000 lbs and over, the Contractor must:
    1. provide the Contracting Authority with the following information:
      • contract number;
      • commodity and freight classification;
      • gross weight and cube of shipment;
      • name of railway serving the Contractor's plant site (if applicable);
      • shipping point and address;
      • date of availability;
      • consignee and destination address;
      • Contractor's recommended method of shipment and cost;
      • type of packaging and dimensions of each package;
      • if shipment is dangerous goods or hazardous products, the United Nations number, class, division, packing group and packing instructions;
      • contact name and phone number; and
    2. not make any shipment before receiving directions from the Contracting Authority concerning mode of shipment, carrier, routing, and method of billing for transportation charges.

D9000C

Effective Date
Item Status
ID
Title
2007-11-30ActiveD9000CDeliverable Items

Remarks – Recommended Use of SACC Item

Use the following clause in contracts when the deliverable items have not been specifically identified in the Statement of Work and there will be items in addition to reports.

Legal text for SACC item

  1. The Contractor must deliver the following deliverable items to the Technical Authority at the location and time designated below:
    No. Item Delivery Date/Location
    1 _________ _________
    2 _________ _________
    3 _________ _________
  2. The Contractor must notify the Contracting Authority, in writing, once these items have been delivered.
2000-12-01SupersededD9000CARCHIVED Deliverables
1998-02-16SupersededD9000CARCHIVED Deliverables
1991-06-01SupersededD9000CARCHIVED Deliverables

D9001C

Effective Date
Item Status
ID
Title
1991-06-01CancelledD9001CARCHIVED Printing Requirements

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

The following with an "X" shall apply:

( ) PROOFS:

Proofs must be approved, prior to printing, by:

       ( ) the consignee
       ( ) 

 ( ) DELIVERY:

( ) a. The following delivery schedule is applicable:

       _____ working days from receipt of _____ to delivery of _____;

       working days from receipt of _____ to delivery of _____;

       working days from receipt of _____ to delivery of _____.

( ) b. Delivery will be made at destination by _____.

( ) c. Submission of a bid is taken as certification that this delivery can 
be met.

( ) d. Delivery will be made within _____ from receipt of a demand.

( ) PRINT QUALITY LEVEL:

The Print Quality Level for this requirement is _____ as per Supply and 
Services Canada booklet entitled:

       ( ) Quality Levels for Printing
       ( ) Quality Levels for Colour Reproduction
       ( ) Quality Levels for Forms
       ( ) Quality Levels for Typesetting

( ) COMPONENTS:

All components, including negatives, progressive proofs, colour separation, 
all photographer's negatives and prints taken for any aspect of a job and 
other materials required to produce this job and other materials required 
to produce this job and originals, whether purchased by or supplied by the 
Contractor, are to be considered property of the Crown and must be 
forwarded prepaid, upon completion of the job, to:

              name of the consignee.

Components must be suitably packaged to ensure arrival at destination in an 
undamaged condition and clearly marked "DO NOT FOLD".  The Contractor must 
itemize components on the delivery slip and obtain proof of return.  
Failure to return components may hold up payment of invoice.

( ) PAPER STOCK:

Paper supplied is to be in accordance with Supply and Services Canada 
booklet "Generic Identification of Paper and Paperboard Brand names".

( ) SALES TAX:

( ) Goods and Services Tax extra, as applicable.
 
       It is understood and agreed that the Contractor is responsible for 
       determining GST applicability on the goods or services supplied at 
       the time of job completion. Accordingly, the amount of the tax to be 
       paid shall be shown as a separate item on the invoice(s).

( ) Provincial Sales Tax not exigible.

( ) If exigible, is applicable to the requirement and must be included on 
your invoice as Provincial Sales Tax extra.  This document is issued on 
behalf of Canada Post Corporation by Supply and Services Canada as agent of 
the consignee.

( ) OVERRUNS/UNDERRUNS:

Unless otherwise stated herein, overruns or underruns must not exceed the 
following:

       - 10 percent overrun on quantities of less than 5,000
       - 5 percent overrun on quantities between 5,000 and 100,000
       - 2 percent overrun on quantities in excess of 100,000
       - underruns must not exceed 2 percent
       - overruns and underruns for labels and tags will be standard in 
       trade practice

( ) AUTHOR ALTERATIONS:

The allowance for author's alterations will be as follows, unless shown 
otherwise in the Basis of Payment.

       DOLLAR VALUE                       PERCENTAGE OF EXTRA EXPENDITURE
       1 -  1,000                                       5 percent
       1,001 - 10,000                                          4 percent
       10,001 - 30,000                                  3 percent
       30,001 - 40,000                                         2 percent
       40,001 and over                                  1 percent

 Author's alterations which exceed the allowance must be approved by the 
Department of Supply and Services prior to implementation.  The cost of 
author's alterations within the allowable range must be approved by the 
consignee prior to implementation.

( ) INVOICING:

1. Overruns and underruns are to be shown as a separate item on the invoice.

2. Overruns are to be invoiced at the "additional same run" price.

3. Underruns - invoice for the total contract quantity at the "additional 
same run" price.

4. Invoices for author's alterations are to be rendered separately.

5. Failure to return components may hold up payment of invoice. 

D9002C

Effective Date
Item Status
ID
Title
2007-11-30ActiveD9002CIncomplete Assemblies

Remarks – Recommended Use of SACC Item

Use the following clause in contracts when an authority is required to ship incomplete assemblies.

Legal text for SACC item

The Contractor must not ship incomplete assemblies unless the authorization for such shipment has been obtained before from the Contracting Authority.

1998-02-16SupersededD9002CARCHIVED Incomplete Assemblies
1991-06-01SupersededD9002CARCHIVED Incomplete Assemblies

D9003C

Effective Date
Item Status
ID
Title
1992-01-31SupersededD9003CARCHIVED Deliverables

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

The following deliverables are required during the performance of the 
contract:    _____   


D9003D

Effective Date
Item Status
ID
Title
2000-12-01CancelledD9003DARCHIVED Deliverables

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

The following deliverables are required during the performance of the 
contract: ______.

1998-02-16SupersededD9003DARCHIVED Deliverables

D9004C

Effective Date
Item Status
ID
Title
1992-01-31SupersededD9004CARCHIVED Deliverables

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

The following deliverables are required during the performance of the 
   proposed contract:    _____  

D9010C

Effective Date
Item Status
ID
Title
2015-02-25ActiveD9010CMilitary Aviation Replacement Parts - Airworthiness Documentation

Remarks – Recommended Use of SACC Item

Use the following clause in contracts when airworthiness documentation is required.

Use this clause in conjunction with A0300T .

Legal text for SACC item

The Contractor must provide the following airworthiness documentation, for each unit of issue, within the interior packaging or attached to the good(s) supplied:

______________________

______________________

______________________ .

2007-11-30SupersededD9010CARCHIVED Military Aviation Replacement Parts - Airworthiness Documentation
2004-12-10SupersededD9010CARCHIVED Military Avation Replacement Parts - Airworthiness Documentation

D9011C

Effective Date
Item Status
ID
Title
2004-12-10SupersededD9011CARCHIVED Military Avation Replacement Parts - Traceability

Remarks – Recommended Use of SACC Item

Use the following clause in contracts as a follow-up to clause A0301T, Military 
Aviation Replacement Parts - Substitutes and Traceability.

Legal text for SACC item

Records of the manufacturer sufficient to constitute proof of origin must 
be available for review, and must be retained and maintained by the 
Contractor for three (3) years following delivery of the last item under 
this Contract.  Such records shall include the following:

(a)    sufficient information to identify the item by type, class, style, 
       grade (including lot or batch number), cast number, the source of 
       the part, and the date and place of manufacture,  as appropriate;

(b)    the name and description (or other positive identification) of, and 
       the application issue of, the specification, drawing, process and 
       inspection requirements, as appropriate;

(c)    records of all inspections and tests carried out, including those 
       carried out on behalf of either the manufacturer or the Contractor;

(d)    copies of any Certificate of Conformance or Certificate of 
       Compliance issued by the manufacturer; and

(e)    all other relevant technical data.