During a federal government election, it is the buyer’s responsibility to obtain proper approval prior to posting procurement activities on CanadaBuys. For more information on obtaining approval prior to posting on CanadaBuys, buyers should contact their supervisor. For technical questions regarding publications or urgent requirements regarding postings, contact the Service Desk.

Archived - Standard Acquisition Clauses and Conditions Manual - H - Terms of Payment


Version: 06-2023

This page has been archived

Information below is provided for reference, research or recordkeeping purposes. It is not subject to the Government of Canada Web Standards and has not been altered or updated since it was archived. Contact the CanadaBuys Service Desk to request a format other than those available or if you require support.

The Standard Acquisition Clauses and Conditions (SACC) Manual is no longer being maintained as of June 2023. Clauses previously labelled as “Active” in the manual are now shown as archived. Contracts issued with SACC Manual clauses remain valid. This is part of Public Services and Procurement Canada’s modernization efforts. Read a news article for more information.

How to search for clauses

  1. Type a keyword, clause title, ID or effective date in the search bar below and press “Enter” or click the search button
  2. Navigate through search results using the up or down arrow buttons
  3. Click the title of the clause of interest to view the content
  4. Clear your search at any time or begin a new search by clicking the X button

Other tips

Main Content

Table of contents

Terms of Payment

H0001D

Effective Date
Item Status
ID
Title
1998-06-15CancelledH0001DARCHIVED Interest on Overdue Accounts

Remarks – Recommended Use of SACC Item

Use the following clause in bid solicitations and in resulting contracts, with 
General Conditions DSS-MAS 1011A, DSS-MAS 1026A, DSS-MAS 1026B, DSS-MAS 1034, 
DSS-MAS 1053, DSS-MAS 9329, and CCC50.

Legal text for SACC item

1.     Where applicable, the General Conditions are amended by deleting the 
       section entitled "Interest on Overdue Accounts" or "Payment", 
       whichever forms part of the Contract.

2.     For the purposes of this clause:

       "Average Rate" means the simple arithmetic mean of the Bank Rates in 
       effect at 4:00 p.m. Eastern Standard Time each day during the 
       calendar month which immediately precedes the calendar month in 
       which payment is made, where the "Bank Rate" means the rate of 
       interest established from time to time by the Bank of Canada as the 
       minimum rate at which the Bank of Canada makes short term advances 
       to members of the Canadian Payments Association.

       "date of payment" means the date of the negotiable instrument drawn 
       by the Receiver General for Canada and given for payment of an 
       amount due and payable;

       an amount is "due and payable" when it is due and payable by Canada 
       to the Contractor in accordance with the terms of the Contract; and

       an amount becomes "overdue" when it is unpaid on the first day 
       following the day upon which it is due and payable.

3.     Canada shall be liable to pay to the Contractor simple interest at 
       the Average Rate plus 3 percent per annum on any amount that is 
       overdue, from the date such amount becomes overdue until the day 
       prior to the date of payment, inclusive. Interest shall be paid 
       without notice from the Contractor except in respect of payment 
       which is less than fifteen (15) days overdue. No interest will be 
       payable or paid in respect of payment made within such fifteen (15) 
       days unless the Contractor so requests after payment has become due.

4.     Canada shall not be liable to pay interest in accordance with this 
       clause if Canada is not responsible for the delay in paying the 
       Contractor.

5.     Canada shall not be liable to pay interest on overdue advance 
       payments.

1996-10-30SupersededH0001DARCHIVED Interest on Overdue Accounts
1992-12-01SupersededH0001DARCHIVED Interest on Overdue Accounts
1991-06-01SupersededH0001DARCHIVED Interest on Overdue Accounts

H0002D

Effective Date
Item Status
ID
Title
1992-08-01SupersededH0002DARCHIVED Interest on Overdue Accounts

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

(a)    i)     In this Article an amount is "due and payable" when it is due 
              and payable by Canada to the Carrier according to the terms 
              of the Contract.

       ii)    For the purposes of this Article, an amount is overdue when 
              it is unpaid on the first day following the day upon which it 
              is due and payable.

       iii)   In this Article "date of payment" means date of the 
              negotiable instrument drawn by the Receiver General for 
              Canada and given for payment of an amount due and payable.

       iv)    In this Article "Bank Rate" means the discount rate of 
              interest set by the Bank of Canada.

(b)    i)     Canada shall be liable to pay, without demand from the 
              Carrier, simple interest at the Bank Rate plus 1 1/4 per 
              centum on any amount which is overdue from the day such 
              amount became overdue until the day prior to the date of 
              payment, inclusively; however, interest will not be payable 
              nor paid unless the amount has been outstanding (unpaid) for 
              more than 15 days following the due date. Interest will not 
              be payable on overdue advance payments.

       ii)    The Bank Rate shall be that prevailing at the opening of 
              business on the date of payment.

(c)    Interest shall only be paid when Canada is responsible for the delay 
       in paying the Carrier. In the event Canada is not responsible for 
       the delay in paying the Carrier, no interest shall be paid.


1992-01-31SupersededH0002DARCHIVED Interest on Overdue Accounts

H0003D

Effective Date
Item Status
ID
Title
1992-08-01SupersededH0003DARCHIVED Interest on Overdue Accounts

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

(a)    i)     In this Article an amount is "due and payable" when it is due 
              and payable by Canada to the Carrier according to the terms 
              of the Standing Offer.

       ii)    For the purposes of this Article, an amount is overdue when 
              it is unpaid on the first day following the day upon which it 
              is due and payable.

       iii)   In this Article "date of payment" means date of the 
              negotiable instrument drawn by the Receiver General for 
              Canada and given for payment of an amount due and payable.

       iv)    In this Article "Bank Rate" means the discount rate of 
              interest set by the Bank of Canada.

(b)    i)     Canada shall be liable to pay, without demand from the 
              Carrier, simple interest at the Bank Rate plus 1 1/4 per 
              centum on any amount which is overdue from the day such 
              amount became overdue until the day prior to the date of 
              payment, inclusively; however, interest will not be payable 
              nor paid unless the amount has been outstanding (unpaid) for 
              more than 15 days following the due date. Interest will not 
              be payable on overdue advance payments.

       ii)    The Bank Rate shall be that prevailing at the opening of 
              business on the date of payment.

(c)    Interest shall only be paid when Canada is responsible for the delay 
       in paying the Carrier. In the event Canada is not responsible for 
       the delay in paying the Carrier, no interest shall be paid.

1992-01-31SupersededH0003DARCHIVED Interest on Overdue Accounts

H0004C

Effective Date
Item Status
ID
Title
2007-11-30CancelledH0004CARCHIVED Payment Period

Remarks – Recommended Use of SACC Item

Use the following clause in all contracts.

Legal text for SACC item

1.     Canada's standard payment period is thirty (30) days. The payment 
       period is measured from the date an invoice in acceptable form and 
       content is received in accordance with the Contract or the date the 
       Work is delivered in acceptable condition as required in the 
       Contract, whichever is later. A payment is considered overdue on the 
       31st day following that date and interest will be paid automatically 
       in accordance with the section entitled Interest on Overdue Accounts 
       of the general conditions.

2.     If the content of the invoice and its substantiating documentation 
       are not in accordance with the Contract or the Work is not in 
       acceptable condition, Canada will notify the Contractor within 
       fifteen (15) days of receipt. The 30-day payment period begins upon 
       receipt of the revised invoice or the replacement or corrected Work. 
       Failure by Canada to notify the Contractor within fifteen (15) days 
       will only result in the date specified in subsection 1 of the clause 
       to apply for the sole purpose of calculating interest on overdue 
       accounts.


H1000C

Effective Date
Item Status
ID
Title
2008-05-12ActiveH1000CSingle Payment

Remarks – Recommended Use of SACC Item

Use the following clause in contracts for goods and services (except construction and utility contracts) when a single payment will be made upon completion of all work and deliveries.

Legal text for SACC item

Canada will pay the Contractor upon completion and delivery of the Work in accordance with the payment provisions of the Contract if:

  1. an accurate and complete invoice and any other documents required by the Contract have been submitted in accordance with the invoicing instructions provided in the Contract;
  2. all such documents have been verified by Canada;
  3. the Work delivered has been accepted by Canada.
2007-11-30SupersededH1000CARCHIVED Single Payment

H1000D

Effective Date
Item Status
ID
Title
2005-06-10SupersededH1000DARCHIVED Method of Payment

Remarks – Recommended Use of SACC Item

Use the following clause in contracts, standing offers, purchase orders or bid 
solicitations (except construction and utility contracts) that provide for 
payment upon completion.

Legal text for SACC item

1.     Payment by Canada to the Contractor for the Work shall be made 
       within:

       (a)    thirty (30) days following the date on which all of the Work 
              has been delivered at the delivery point specified in the 
              Contract, not the ultimate destination, and all other Work 
              required to be performed by the Contractor under the terms of 
              the Contract has been completed; or 

       (b)    thirty (30) days following the date on which an invoice and 
              substantiating documentation are received according to the 
              terms of the Contract;

       whichever date is the later.

2.     If Canada has any objection to the form of the invoice or the 
       substantiating documentation, within fifteen (15) days of its 
       receipt, Canada shall notify the Contractor of the nature of the 
       objection. "Form of the invoice" means an invoice which contains or 
       is accompanied by such substantiating documentation as Canada 
       requires.  Failure by Canada to act within fifteen (15) days will 
       only result in the date specified in subsection 1 of the clause to 
       apply for the sole purpose of calculating interest on overdue 
       accounts.


2004-12-10SupersededH1000DARCHIVED Method of Payment
2003-12-12SupersededH1000DARCHIVED Method of Payment
1999-06-21SupersededH1000DARCHIVED Method of Payment
1992-12-01SupersededH1000DARCHIVED Method of Payment
1991-06-01SupersededH1000DARCHIVED Method of Payment

H1001C

Effective Date
Item Status
ID
Title
2008-05-12ActiveH1001CMultiple Payments

Remarks – Recommended Use of SACC Item

Use the following clause in contracts for goods (except construction and utility contracts) with multiple deliveries when payment will be made on completion of each delivery.

Legal text for SACC item

Canada will pay the Contractor upon completion and delivery of units in accordance with the payment provisions of the Contract if:

  1. an accurate and complete invoice and any other documents required by the Contract have been submitted in accordance with the invoicing instructions provided in the Contract;
  2. all such documents have been verified by Canada;
  3. the Work delivered has been accepted by Canada.
2007-11-30SupersededH1001CARCHIVED Multiple Payments

H1001D

Effective Date
Item Status
ID
Title
2004-12-10SupersededH1001DARCHIVED Method of Payment - Multiple Deliveries

Remarks – Recommended Use of SACC Item

Use the following clause in contracts, standing offers, purchase orders, bid 
solicitations (except construction and utility contracts) applicable to the 
multiple unit/multiple shipment category, with payment on completion of each 
shipment.

Legal text for SACC item

1.     Payment by Canada to the Contractor for each delivery shall be made 
       within:

       (a)    thirty (30) days following the date on which completed units 
              have been delivered at the delivery point specified in the 
              Contract, not the ultimate destination, and all other Work 
              required to be performed by the Contractor with respect to 
              these units under the terms of the Contract has been 
              completed; or

       (b)    thirty (30) days following the date on which an invoice and 
              substantiating documentation are received according to the 
              terms of the Contract; 

       whichever date is the later.

2.     If Canada has any objection to the form of the invoice or the 
       substantiating documentation, within fifteen (15) days of its 
       receipt, Canada shall notify the Contractor of the nature of the 
       objection. "Form of the invoice" means an invoice which contains or 
       is accompanied by such substantiating documentation as Canada 
       requires.  Failure by Canada to act within fifteen (15) days will 
       only result in the date specified in subsection 1 of the clause to 
       apply for the sole purpose of calculating interest on overdue 
       accounts.


2003-12-12SupersededH1001DARCHIVED Method of Payment - Multiple Deliveries
1999-06-21SupersededH1001DARCHIVED Method of Payment - Multiple Deliveries
1991-06-01SupersededH1001DARCHIVED Method of Payment - Multiple Deliveries

H1002C

Effective Date
Item Status
ID
Title
2005-12-16CancelledH1002CARCHIVED Method of Payment - One Lump Sum

Remarks – Recommended Use of SACC Item

Use the following clause in contracts when one lump sum payment is to be made to 
the contractor after all deliverables have been received and accepted.

Legal text for SACC item

1.     One payment shall be made following delivery and acceptance of all 
       deliverables.

2.     The Contractor shall prepare and certify an original and two (2) 
       copies of its claim on form PWGSC-TPSGC 1111, Claim for Progress 
       Payment  (http://www.pwgsc.gc.ca/acquisitions/text/forms/forms-e.html
).  The claim will be forwarded to the Contracting Authority who will 
certify the claim and forward it to the Technical Authority for 
certification and payment.

2003-12-12SupersededH1002CARCHIVED Method of Payment - One Lump Sum
2000-12-01SupersededH1002CARCHIVED Method of Payment
2000-05-12SupersededH1002CARCHIVED Method of Payment
1997-09-15SupersededH1002CARCHIVED Method of Payment
1991-06-01SupersededH1002CARCHIVED Method of Payment

H1003C

Effective Date
Item Status
ID
Title
2022-12-01ActiveH1003CProgress payments

Remarks – Recommended Use of SACC Item

Use the following clause in contracts when progress payments will be made based on cost incurred using progress claim form PWGSC-TPSGC 1111 .

Use this clause in conjunction with H3022C or H3024C , if applicable; and in conjunction with H4500C in contracts for goods with a Canadian-based contractor.

For more information on progress payments, consult 4.70.30.15 of the Supply Manual .

Instructions to contracting officers:

  1. Complete the clause where required.
  2. Insert one of the following options in paragraph 2 of the clause. If the options provided below do not reflect the requirement, contracting officers may revise the paragraph accordingly.
    • Option 1: Use this paragraph in unit price contracts when the holdback will be paid upon delivery and acceptance of each item.
      "The balance of the amount payable will be paid in accordance with the payment provisions of the Contract upon completion and delivery of the item if the Work has been accepted by Canada and a final claim for the payment is submitted."
    • Option 2: Use this paragraph when payment will be made upon completion and acceptance of all work and deliveries.
      "The balance of the amount payable will be paid in accordance with the payment provisions of the Contract upon completion and delivery of all work required under the Contract if the Work has been accepted by Canada and a final claim for the payment is submitted."

Legal text for SACC item

  1. Canada will make progress payments in accordance with the payment provisions of the Contract, no more than once a month, for cost incurred in the performance of the Work, up to _____ percent of the amount claimed and approved by Canada if:
    1. an accurate and complete claim for payment using form PWGSC-TPSGC 1111, Claim for Progress Payment, and any other document required by the Contract have been submitted in accordance with the invoicing instructions provided in the Contract;
    2. the amount claimed is in accordance with the basis of payment;
    3. the total amount for all progress payments paid by Canada does not exceed _____ percent of the total amount to be paid under the Contract;
    4. all certificates appearing on form PWGSC-TPSGC 1111 have been signed by the respective authorized representatives.
  2. _________ (insert one of the options provided under the Remarks section above.)
  3. Progress payments are interim payments only. Canada may conduct a government audit and interim time and cost verifications and reserves the rights to make adjustments to the Contract from time to time during the performance of the Work. Any overpayment resulting from progress payments or otherwise must be refunded promptly to Canada.
2010-01-11SupersededH1003CARCHIVED Progress Payments
2008-05-12SupersededH1003CARCHIVED Progress Payments
2007-11-30SupersededH1003CARCHIVED Progress Payments

H1003D

Effective Date
Item Status
ID
Title
2005-12-16SupersededH1003DARCHIVED Method of Payment - Progress Payments

Remarks – Recommended Use of SACC Item

Use the following clause in bid solicitations and contracts when it is intended 
that progress payments will be made.

If holdback will be applied at different rates for different line items, then it 
should be reflected in this clause.  The following is an option clause relative 
to a holdback position on any given contract and relates to paragraphs 1. (c) 
and 2. (b) of this clause.  If the same rate of payment/holdback is not 
applicable to all commodities or phases of the contract, add the following 
phrase to the foregoing:

	"applicable to _____ (Name the commodity or phase of the contract appropriate 
to the payment/holdback rate stated) and payment/holdback equal to _____ percent 
of such expenditures applicable to _____ (Name the commodity or phase of the 
contract appropriate to the payment/holdback rate stated)."

Legal text for SACC item

1.     Progress payments shall be made not more frequently than once a 
       month, upon the following terms and conditions:

       (a)    progress claims shall be completed in full, on form 
              PWGSC-TPSGC 1111, Claim for Progress Payment (http://www.pwgsc.gc.ca
              /acquisitions/text/forms/forms-e
.html) and submitted to Canada in accordance with the invoicing 
instructions specified herein;

       (b)    all the certificates appearing on the said form are to be 
              signed by the respective persons indicated thereon or their 
              delegate, and

       (c)    payments shall be made up to _____ percent of the claimed 
              amounts approved by Canada but in no event will cumulative 
              payments exceed _____ percent of the total to be paid by 
              Canada under the Contract.

2.     Each claim must show the following:

       (a)    expenditures plus pro-rated profit or fee if applicable or, 
              alternatively, the value of milestones during the claim 
              period by line item as detailed in the payment terms of the 
              Contract;

       (b)    less holdback at _____ percent, calculated on the amount in 2. 
              (a);

       (c)    total of all previous claims against the Contract;

       (d)    Goods and Services Tax or Harmonized Sales Tax, as applicable, 
              calculated on the amount in 2. (a) above.

3.     The balance of the amount payable will be paid upon satisfactory 
       completion of the Contract or in the case of unit price contracts 
       upon the delivery and acceptance of each unit, provided that a final 
       claim for such payment is submitted.  (Refer to the invoicing 
       instructions in the Contract.)

4.     If specified herein, the form PWGSC-TPSGC 1111 shall be accompanied 
       by the required copies of monthly progress reports.

5.     The Contractor shall prepare the original and two (2) copies of its 
       claim on form PWGSC-TPSGC 1111, and they shall be routed as follows:

       (a)    _____ Authority;
       (b)    _____ Authority;
       (c)    Payment Office.

6.     Progress payments shall be regarded as interim payments only and 
       Canada shall have the right to conduct interim cost/time 
       verifications or audits and to make adjustments from time to time 
       during the performance of the Work.  Any overpayment resulting from 
       such progress payments or otherwise shall be refunded promptly to 
       Canada.
 
7.     Payment by Canada to the Contractor for the Work shall be made:

       (a)    in the case of a progress payment other than the final 
              payment, within thirty (30) days following the date of 
              receipt of a duly completed form PWGSC-TPSGC 1111;

       (b)    in the case of a final payment, within thirty (30) days 
              following the date of receipt of the duly completed final 
              form PWGSC-TPSGC 1111, or within thirty (30) days following 
              the date on which the Work is completed, whichever date is 
              the later.

8.     If Canada has any objection to the form of the progress claim, 
       within fifteen (15) days of its receipt, Canada shall notify the 
       Contractor of the nature of the objection.  "Form of the claim" 
       means a claim that contains or is accompanied by such substantiating 
       documentation as Canada requires.  Failure by Canada to act within 
       fifteen (15) days will only result in the date specified in 
       subsection 7 of the clause to apply for the sole purpose of 
       calculating interest on overdue accounts.

2004-12-10SupersededH1003DARCHIVED Method of Payment - Progress
2003-12-12SupersededH1003DARCHIVED Method of Payment - Progress
2000-05-12SupersededH1003DARCHIVED Method of Payment - Progress
1998-11-23SupersededH1003DARCHIVED Method of Payment - Progress
1997-09-15SupersededH1003DARCHIVED Method of Payment - Progress
1992-08-01SupersededH1003DARCHIVED Progress Payments
1992-01-31SupersededH1003DARCHIVED Progress Payments

H1004D

Effective Date
Item Status
ID
Title
1992-08-01SupersededH1004DARCHIVED Method of Payment

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

1.     Payment by Canada for the work shall be made in accordance with the 
       Basis of Payment specified herein:

       a)     within thirty (30) days following the date on which the work 
              has been performed; or

       b)     within thirty (30) days following the date on which an 
              invoice and substantiating documentation are received 
              according to the terms of the Contract;

              whichever is later.

2.     If Canada has any objection to the form of the invoice or the 
       substantiating documentation, within fifteen (15) days of its 
       receipt Canada shall notify the Carrier of the nature of the 
       objection. "Form of the invoice" means an invoice which contains or 
       is accompanied by such substantiating documentation as Canada 
       requires. Failure by Canada to act within fifteen (15) days will 
       only result in the date specified in paragraph 1 of the clause to 
       apply for the sole purpose of calculating interest on overdue 
       accounts.


1992-01-31SupersededH1004DARCHIVED Method of Payment

H1005D

Effective Date
Item Status
ID
Title
1992-08-01SupersededH1005DARCHIVED Method of Payment

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

1.     Payment by Canada for the work shall be made in accordance with the 
       Basis of Payment specified herein:

       a)     within thirty (30) days following the date on which the work 
              has been performed; or

       b)     within thirty (30) days following the date on which an 
              invoice and substantiating documentation are received 
              according to the terms of the Standing Offer;

              whichever is later.

2.     If Canada has any objection to the form of the invoice or the 
       substantiating documentation, within fifteen (15) days of its 
       receipt Canada shall notify the Carrier of the nature of the 
       objection. "Form of the invoice" means an invoice which contains or 
       is accompanied by such substantiating documentation as Canada 
       requires. Failure by Canada to act within fifteen (15) days will 
       only result in the date specified in paragraph 1 of the clause to 
       apply for the sole purpose of calculating interest on overdue 
       accounts.

1992-01-31SupersededH1005DARCHIVED Method of Payment

H1006D

Effective Date
Item Status
ID
Title
1992-01-31CancelledH1006DARCHIVED Proposed Basis of Payment

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

Refer to Appendix "A" attached hereto which forms part of this Request of 
   Proposal.    It is understood and agreed that payment is subject to 
   delivery, inspection and acceptance of the work and any interim payment 
   is conditional on the acceptability of the photography and prints to the 
   Inspection Authority.  

H1007D

Effective Date
Item Status
ID
Title
2004-12-10CancelledH1007DARCHIVED Quarterly Release of Holdbacks

Remarks – Recommended Use of SACC Item

Use the following clause in conjunction with H1003D.

Legal text for SACC item

1.     The balance of the amount payable in any quarter will be paid 
       quarterly, provided a claim for such payment is submitted.  Each 
       claim received at the end of a quarter is to include the claim for 
       the release of the quarterly holdback.

2.     Progress payments shall be regarded as interim payments only and 
       Canada shall have the right to conduct interim cost/time 
       verifications or audits and to make adjustments from time to time 
       during the performance of the Work.  Any overpayment resulting from 
       such progress payments or otherwise shall be promptly refunded to 
       Canada.


1996-05-01SupersededH1007DARCHIVED Quarterly Release of Holdbacks

H1008C

Effective Date
Item Status
ID
Title
2008-05-12ActiveH1008CMonthly Payment

Remarks – Recommended Use of SACC Item

Use the following clause in contracts for services when payment will be made on a monthly basis for work performed.

Legal text for SACC item

Canada will pay the Contractor on a monthly basis for work performed during the month covered by the invoice in accordance with the payment provisions of the Contract if:

  1. an accurate and complete invoice and any other documents required by the Contract have been submitted in accordance with the invoicing instructions provided in the Contract;
  2. all such documents have been verified by Canada;
  3. the Work performed has been accepted by Canada.
2007-11-30SupersededH1008CARCHIVED Monthly Payment

H3000D

Effective Date
Item Status
ID
Title
1991-06-01SupersededH3000DARCHIVED Progress Payments

Remarks – Recommended Use of SACC Item

Use the following clause in bid solicitations and contracts when it is intended 
that progress payments will be made.  If the contract is for shipbuilding or 
ship repair or alteration or repair to real property, or the holdback is 
pursuant to legislation, then use clause H3025D.  Enter fill-in data. 

1.  The routing instructions of paragraph 5 are those used for most contracts.  
These may be adjusted to suit a particular contract so long as the Payment 
Office is the last one to receive the claim.

2.  If holdback will be applied at different rates for different line items, 
then it should be reflected in clause H3000D.  The following is an option clause 
relative to a holdback position on any given procurement and relates to 
paragraphs 3 and 4(b) of standard clause H3000D.  If the same rate of 
payment/holdback is not applicable to all commodities or phases of the 
procurement, add the following phrase to the foregoing:

	"applicable to _____ (name the commodity or phase of the contract appropriate 
to the payment/holdback rate stated) and payment/holdback equal to _____ percent 
of such expenditures applicable to _____ (name the commodity or phase of the 
contract appropriate to the payment/holdback rate stated )."

Legal text for SACC item

Progress payments will be made not more frequently that once a month upon 
the following terms and conditions:

1.  Progress claims shall be completed in full, including a brief report of 
the progress of the Work to the date of the claim, and submitted to the 
Minister on form DSS-MAS 1111, Claim for Progress Payment.

2.  All the certificates appearing on the form are to be signed by or for 
the respective persons indicated.

3.  Payments will be made up to _____ percent of the claimed amounts 
approved by the Minister but in no event will cumulative payments exceed _____ 
percent of the Contract value.

4.  Each claim will show:

       a)  expenditures plus pro-rated profit or fee or, alternatively, the 
       value of milestones during the claim period by line item as detailed 
       in the payment terms of the Contract;

       b)  holdback at _____ percent, calculated on the amount in a);

       c)  goods and services tax calculated on the amount in a) above.

5.  The Contractor shall prepare the original and _____ copies of the Claim 
   for Progress Payment, form DSS-MAS 1111, and forward them to the 
   scientific/inspection authority, who in turn will send them to the DSS 
   representative for further submission to the payment office.

H3001T

Effective Date
Item Status
ID
Title
1991-06-01CancelledH3001TARCHIVED Progress or Advance Payments

Remarks – Recommended Use of SACC Item

Use the following clause in a bid solicitation when it is intended that progress 
or advance payments will be made upon request.  If the contract is for 
shipbuilding or ship repair or alteration or repair to real property, or where 
the holdback is pursuant to legislation, use clause H3026T.  Enter fill-in-data.

NOTES:

The following is an option clause relative to a holdback position on any given 
procurement and relates to paragraph 4 and 5(b) of standard clause H3001T.  If 
the same rate of payment/holdback is not applicable to all commodities or phases 
of the procurement, then add the following phrase to the foregoing:

"applicable to _____(name the commodity or phase of the contract appropriate to 
the payment/holdback rate stated) and payment/holdback equal to _____ percent of 
such expenditures applicable to _____(name the commodity of phase or the 
contract appropriate to the payment/holdback rate stated)."

Legal text for SACC item

Progress or advance payments will be made if requested in the bid, but not 
more frequently than once a month upon the following terms and conditions:

1.     Arrangements for progress or advance payments will constitute a bid 
       evaluation criterion. The preferred method of payment is stated 
       below:

       (a)    Advance payments: _____ percent of Contract value _____ 
              months after Contract award date (third party guarantees will 
              be made available as set out in attachment _____).

       (b)    Progress Payments:

              (i)    milestones achieved, as described on attachment _____ 
                     and corresponding values as set out;

              (ii)   cost incurred (plus pro-rated fee or profit), with 
                     projected monthly instalments as set out in attachment _____;

              (iii)  combination of 1) and 2) above, as set out in 
                            attachment _____.

              (iv)   combination of a) and b) above, as set out in 
                     attachment _____.

2.     Progress claims shall be completed in full including a brief report 
       of the progress of the Work to date of the claim, and submitted to 
       the Minister on form DSS-MAS 1111, Claim for Progress Payment.

3.     All the certificates appearing on the said form are to be signed by 
       or for the respective persons indicated.

4.     Progress payments will be made up to _____ percent of the claimed 
       amounts approved by the Minister but in no event will cumulative 
       payments exceed _____ percent of the Contract value.

5.     Each progress claim will show:

       (a)    expenditures plus pro-rated profit or fee or, alternatively, 
              the value of milestones during the claim period by line item 
              as detailed in the payment terms of any contract resulting 
              from this bid;

       (b)    holdback at _____ percent, calculated on the amount in (a) 
              above; 

       (c)    goods and services tax on the amount in (a) above.
 
6.     The Bidder shall prepare the original and _____ copies of the Claim 
   for Progress Payment, form DSS-MAS 1111, and forward them to the 
   scientific/inspection authority who in turn will send them to the DSS 
   representative for further submission to the payment office.

H3002D

Effective Date
Item Status
ID
Title
1991-06-01SupersededH3002DARCHIVED Progress Payments

Remarks – Recommended Use of SACC Item

Use clause H3002D for cost reimbursable or fixed time rate contracts when using 
clause H3000D or H3001T.  (For cost reimbursable contracts only, after the 
phrase "provided a final claim for such payment is submitted" add the phrase 
"together with a completed Contractor's Cost Submission on form DSS-MAS 7953.") 

Legal text for SACC item

The balance of the amount payable will be paid upon satisfactory completion 
of the Contract, provided that a final claim for such payment is submitted.

Progress payments shall be regarded as interim payments only.  The Minister 
   shall have the right to conduct interim cost/time verifications or 
   audits and to make adjustments during the performance of the Work. Any 
   overpayments resulting from such progress payments or otherwise shall be 
   promptly refunded to Canada.

H3003D

Effective Date
Item Status
ID
Title
1991-06-01SupersededH3003DARCHIVED Progress Payments

Remarks – Recommended Use of SACC Item

Use clause H3003D for firm unit price contracts, when clause H3000D or H3001T is 
used.

Legal text for SACC item

The balance due on each unit shall be paid upon the delivery and acceptance 
   of each, provided that an invoice for such payment is submitted (refer 
   to the Contract's invoicing instructions).

H3004D

Effective Date
Item Status
ID
Title
2003-12-12SupersededH3004DARCHIVED Payment, Conditions Precedent to

Remarks – Recommended Use of SACC Item

Use the following clause in bid solicitations and contractual documents with 
progress payments, and which use one of the general conditions shown below.

Fill in the blanks with the appropriate section and general conditions number.

General conditions	Section
1026A			10
1026B			19
CCC-50		17.

Use of this clause is not required when general conditions 9601, General 
Conditions - Long Form, is used.

Legal text for SACC item

Section _____ of general conditions _____ that forms part of this Contract 
is hereby deleted and the following is substituted:

       "1.    No payment shall be made to the Contractor unless or until 
              invoices, inspection notes, and all other documents 
              prescribed by the Minister or by the inspector are submitted 
              in accordance with either the terms of the Contract or the 
              instructions of the Minister.

       2.     In cases where costs have been paid by the Contractor and 
              where payment is being made by the Minister, Canada shall 
              make no payment to the Contractor unless or until the 
              Contractor, if required to do so, establishes to the 
              satisfaction of the Minister that the materials, parts, work 
              in process, or finished work are free from all claims, liens, 
              attachments, charges, or encumbrances.

       3.     In cases where costs have accrued in the accounts of the 
              Contractor as liabilities to be discharged in the normal 
              course of business and where the Minister is making payment, 
              no payment shall be made to the Contractor unless or until 
              the Contractor, if required to do so, establishes to the 
              satisfaction of the Minister that:

              (a)    the Contractor is not, in the ordinary course of 
                     business, delinquent in discharging any accrued 
                     liabilities that have arisen under this Contract,

              (b)    the Minister's payment shall be used only to discharge 
                     such liabilities, and

              (c)    upon such discharge, the materials, parts, work in 
                     process, and finished work shall be free from all 
                     claims, liens, charges, or encumbrances.

       4      In case of finished work, Canada shall make no payment to the 
              Contractor unless or until such finished work has been 
              inspected and accepted in accordance with the terms of this 
              Contract."


1999-06-21SupersededH3004DARCHIVED Payment, Conditions Precedent to
1991-06-01SupersededH3004DARCHIVED Payment, Conditions Precedent to

H3005C

Effective Date
Item Status
ID
Title
1991-06-01SupersededH3005CARCHIVED Method of Payment

Remarks – Recommended Use of SACC Item

Use this clause in Science contracts when firm milestone payments are to be made 
in accordance with a predetermined "Schedule of Milestones." 

Legal text for SACC item

1.     Milestone payments will be made in accordance with the Schedule of 
       Milestones attached as Annex "_____", provided that:

       (a)    the Contractor submits a claim for payment on form DSS-MAS 
              1111, Claim for Progress Payment. A sample is attached as 
              Annex "_____";

       (b)    all of the certificates appearing on the said form are signed 
              by the respective persons indicated thereon or their delegate; 
              and

       (c)    all reports required for the milestone claimed have been 
              received and accepted by the Scientific Authority.

2.     The claim must show the following:

       (a)    amount currently claimed;

       (b)    total of all previous claims against the Contract and the 
              extensions of the total to date;

       (c)    Requisition Number (RN), Financial Code (FC), and Contract 
              Number as shown on page 1 of this Contract.

3.     The Contractor shall prepare and certify an original and four (4) 
       copies of its claim on form DSS-MAS 1111.  The claim will be 
       forwarded to the Science Contracting Officer who will certify the 
       claim and forward it to the Scientific Authority for certification 
       and payment.

4.     The balance of the amount payable will be made following:

       (a)    delivery and acceptance of all deliverable items;

       (b)    the approval of the final claim by the Science Contracting 
              Officer and by the Scientific Authority.

5.     Payment by Canada to the Contractor for the Work shall be made:

       (a)    in the case of a milestone payment other than the final 
              payment, within thirty (30) days following the date of 
              receipt of a duly completed milestone claim on form DSS-MAS 
              1111;

       (b)    in the case of a final payment, within thirty (30) days 
              following the date of receipt of a duly completed final 
              milestone claim, on form DSS-MAS 1111, or within thirty (30) 
              days following the date on which the Work is completed, 
              whichever date is the later; 

       (c)    if Canada has any objection to the form of the milestone 
   claim, within fifteen (15) days of its receipt, Canada shall notify the 
   Contractor of the nature of the objection. "Form of the claim" means a 
   claim which contains or is accompanied by such substantiating 
   documentation as Canada requires.  Failure by Canada to act within 
   fifteen (15) days will only result in the date specified in 
   subparagraphs 5(a) and (b) of this clause applying for the sole purpose 
   of calculating interest on overdue accounts. 

H3005D

Effective Date
Item Status
ID
Title
2005-12-16SupersededH3005DARCHIVED Method of Payment - Milestone Payments

Remarks – Recommended Use of SACC Item

Use the following clause when milestone payments are to be made in accordance 
with a predetermined Schedule of Milestones.

Legal text for SACC item

1.     Milestone payments shall be made in accordance with the Schedule of 
       Milestones attached as Annex "______", upon the following terms and 
       conditions:

       (a)    milestone claims shall be completed in full, on form 
              PWGSC-TPSGC 1111, Claim for Progress Payment, (http://www.pwgsc.gc.ca
              /acquisitions/text/forms/forms-e
.html) and submitted to Canada in accordance with the invoicing 
instructions specified herein;

       (b)    all the certificates appearing on the said form are to be 
              signed by the respective persons indicated thereon or their 
              delegate; and

       (c)    all deliverables required for the milestone claimed have been 
              received and accepted by the ________ Authority.

2.     Each claim must show the following:

       (a)    amount currently claimed;

       (b)    total of all previous claims against the Contract and the 
              extension of the totals to date; and

       (c)    Contract Number, Financial Codes and Client Reference Number 
              as shown on page 1 of the Contract.

3.     The Contractor shall prepare and certify an original and _____ 
       copies of its claim on form PWGSC-TPSGC 1111 and forward it to the _____ 
       Authority.

4.     The balance owing shall be paid to the Contractor, subject to:

       (a)    delivery and acceptance of all deliverables; and 

       (b)    the certification of the final claim by the Contracting 
              Authority and the _______ Authority.

5.     Payment by Canada to the Contractor for the Work shall be made:

       (a)    in the case of a milestone payment other than the final 
              payment, within thirty (30) days following the date of 
              receipt of a duly completed form PWGSC-TPSGC 1111;

       (b)    in the case of a final payment, within thirty (30) days 
              following the date of receipt of the duly completed form 
              PWGSC-TPSGC 1111, or within thirty (30) days following the 
              date on which the Work is completed, whichever date is the 
              later.

6.     If Canada has any objection to the form of the milestone claim, 
       within fifteen (15) days of its receipt, Canada shall notify the 
       Contractor of the nature of the objection.  "Form of the claim" 
       means a claim that contains or is accompanied by such substantiating 
       documentation as Canada requires.  Failure by Canada to act within 
       fifteen (15) days will only result in the date specified in 
       subsection 5 of the clause to apply for the sole purpose of 
       calculating interest on overdue accounts.

2004-12-10SupersededH3005DARCHIVED Method of Payment - Milestone Payments
2003-12-12SupersededH3005DARCHIVED Method of Payment - Milestone Payment
2003-05-30SupersededH3005DARCHIVED Method of Payment - Milestone Payment
2000-05-12SupersededH3005DARCHIVED Method of Payment - Milestone
1998-11-23SupersededH3005DARCHIVED Method of Payment - Milestone
1998-06-15SupersededH3005DARCHIVED Method of Payment - Milestone

H3006C

Effective Date
Item Status
ID
Title
2005-12-16SupersededH3006CARCHIVED Method of Payment - Universities

Remarks – Recommended Use of SACC Item

Use the following clause in contracts with universities when progress payments 
are to be made to the contractor.

Legal text for SACC item

1.     Progress payments, monthly or less frequently, shall be made up to 
       100 percent of the costs and charges incurred or of the invoice that 
       has been received and accrued in the accounts payable, and in 
       accordance with the Basis of Payment, but not to exceed 90 percent 
       of the value of the Contract, provided that:

       (a)    the Contractor submits to the Contracting Authority a fully 
              completed "Claim for Progress Payment", form PWGSC-TPSGC 1111 
              (http://www.pwgsc.gc.ca/acquisitions/text/forms/forms-e
.html).  The claim must show the following:

              (i)    expenditures in accordance with the Basis of Payment 
                     for the Work performed during the period of the claim;

              (ii)   deductions for holdback, if applicable;

              (iii)  total of all previous claims against the Contract;

              (iv)   extension of the totals to date and the calculation of 
                            the amount due;

              (v)    Goods and Services Tax or Harmonized Sales Tax, as 
                     applicable;

              (vi)   Procurement Business Number; and

              (vii)  Contract Number, Financial Codes, and Client Reference 
                            Number as shown on page 1 of the Contract.

       (b)    all the certificates appearing on the said form are signed by 
              the respective persons indicated thereon or their delegate;

       (c)    the claim is accompanied by the deliverables required for the 
              period of the claim;

       (d)    the deliverables are accepted by the Technical Authority;

       (e)    the claim is certified by the Contracting Authority and the 
              Technical Authority; and

       (f)    the following documentation, in two (2) copies, accompanies 
              the claim:

              (i)    a listing of all expenses in support of the claim;

              (ii)   a copy of the invoice for each non-consumable item 
                     valued at $1,000 or more; and

              (iii)  a statement regarding all travel and living expenses 
                     indicating who, where, when, duration and purpose of 
                     travel.

2.     The Contractor shall prepare and certify an original and two (2) 
       copies of its claim on form PWGSC-TPSGC 1111.  The claim will be 
       forwarded to the Contracting Authority who will certify the claim 
       and forward it to the Technical Authority for certification and 
       payment.

3.     The balance owing shall be paid to the Contractor, subject to:

       (a)    completion and acceptance of the Work;

       (b)    the submission of all deliverables to the Technical Authority; 
              and

       (c)    the certification of the final claim by the Technical 
              Authority and the Contracting Authority. 
4.     Progress payments shall be regarded as interim payments only and 
       Canada shall have the right to conduct interim cost/time 
       verifications or audits and to make adjustments from time to time 
       during the performance of the Work.  Any overpayment resulting from 
       such progress payments or otherwise shall be refunded promptly to 
       Canada.

5.     Payment by Canada to the Contractor for the Work shall be made:

       (a)    in the case of a progress payment other than the final 
              payment, within thirty (30) days following the date of 
              receipt of the duly completed form PWGSC-TPSGC 1111;

       (b)    in the case of a final payment, within thirty (30) days 
              following the date of receipt of the duly completed form 
              PWGSC-TPSGC 1111, or within thirty (30) days following the 
              date on which Work is completed, whichever date is the later.

6.     If Canada has any objection to the form of the progress claim, 
       within fifteen (15) days of its receipt, Canada shall notify the 
       Contractor of the nature of the objection.  "Form of the claim" 
       means a claim that contains or is accompanied by such substantiating 
       documentation as Canada requires.  Failure by Canada to act within 
       fifteen (15) days will only result in the date specified in 
       subsection 5 of the clause to apply for the sole purpose of 
       calculating interest on overdue accounts.

2004-12-10SupersededH3006CARCHIVED Method of Payment - Universities
2000-05-12SupersededH3006CARCHIVED Method of Payment
1998-11-23SupersededH3006CARCHIVED Method of Payment
1997-09-15SupersededH3006CARCHIVED Method of Payment
1991-06-01SupersededH3006CARCHIVED Method of Payment

H3007C

Effective Date
Item Status
ID
Title
2005-12-16SupersededH3007CARCHIVED Method of Payment - Progress Payments

Remarks – Recommended Use of SACC Item

Use the following clause in contracts when progress payments are to be made 
based on actual expenditures less a percentage for holdback.

Legal text for SACC item

1.     Progress payments, monthly or less frequently, shall be made up to ____ 
       percent of the costs and charges incurred in accordance with the 
       Basis of Payment, but not in excess of ____ percent of the value of 
       the Contract, provided that:

       (a)    the Contractor submits to the Contracting Authority a fully 
              completed "Claim for Progress Payment", form PWGSC-TPSGC 1111 
              (http://www.pwgsc.gc.ca/acquisitions/text/forms/forms-e
.html).  Each claim must show the following:

              (i)    expenditures in accordance with the Basis of Payment 
                     for the Work performed during the period of the claim;

              (ii)   holdback of ____ percent;

              (iii)  total of all previous claims against the Contract and 
                            the extension of the totals to date;

              (iv)   Goods and Services Tax or Harmonized Sales Tax, as 
                            applicable;

              (v)    Procurement Business Number; and

              (vi)   Contract Number, Financial Codes, and Client Reference 
                            Number as shown on page 1 of the Contract.

       (b)    all the certificates appearing on the said form are signed by 
              the respective persons indicated thereon or their delegate;

       (c)    the claim is accompanied by the deliverables required for the 
              period of the claim;

       (d)    the deliverables are accepted by the Technical Authority;

       (e)    the claim is certified by the Contracting Authority and the 
              Technical Authority; and

       (f)    two (2) sets of backup documentation (receipts, vouchers, etc.) 
              to support the claim are supplied to the Contracting 
              Authority.

2.     The Contractor shall prepare and certify an original and two (2) 
       copies of its claim on form PWGSC-TPSGC 1111.  The claim will be 
       forwarded to the Contracting Authority who will certify the claim 
       and forward it to the Technical Authority for certification and 
       payment.

3.     The balance owing shall be paid to the Contractor, subject to:

       (a)    completion and acceptance of the Work; 

       (b)    the submission of all deliverables to the Technical Authority; 
              and 

       (c)    the certification of the final claim by the Contracting 
              Authority and the Technical Authority.

4.     Progress payments shall be regarded as interim payments only and 
       Canada shall have the right to conduct interim cost/time 
       verifications or audits and to make adjustments from time to time 
       during the performance of the Work.  Any overpayments resulting from 
       such progress payments or otherwise shall be refunded promptly to 
       Canada.

5.     Payment by Canada to the Contractor for the Work shall be made:

       (a)    in the case of a progress payment other than the final 
              payment, within thirty (30) days following the date of 
              receipt of the duly completed form PWGSC-TPSGC 1111;

       (b)    in the case of a final payment, within thirty (30) days 
              following the date of receipt of the duly completed form 
              PWGSC-TPSGC 1111, or within thirty (30) days following the 
              date on which the Work is completed, whichever date is the 
              later.

6.     If Canada has any objection to the form of the progress claim, 
       within fifteen (15) days of its receipt, Canada shall notify the 
       Contractor of the nature of the objection.  "Form of the claim" 
       means a claim that contains or is accompanied by such substantiating 
       documentation as Canada requires.  Failure by Canada to act within 
       fifteen (15) days will only result in the date specified in 
       subsection 5 of the clause to apply for the sole purpose of 
       calculating interest on overdue accounts.

2004-12-10SupersededH3007CARCHIVED Method of Payment
2003-12-12SupersededH3007CARCHIVED Method of Payment
2000-05-12SupersededH3007CARCHIVED Method of Payment
1998-11-23SupersededH3007CARCHIVED Method of Payment
1997-09-15SupersededH3007CARCHIVED Method of Payment
1991-07-01SupersededH3007CARCHIVED Method of Payment
1991-06-01SupersededH3007CARCHIVED Method of Payment

H3008C

Effective Date
Item Status
ID
Title
1991-06-01CancelledH3008CARCHIVED Conditions Precedent to Payment

Remarks – Recommended Use of SACC Item

Use he following clause in all Science contracts. 

Legal text for SACC item

No payment shall be made to the Contractor unless or until:

       (a)  invoices, inspection notes and all other documents prescribed 
       by the Contract are submitted in accordance with the terms of the 
       Contract or instructions of the Minister;

       (b)  with respect to all parts of the Work, the cost of which has 
       been paid by the Contractor and in respect of which payment is being 
       made by Canada, the Contractor, where required to do so, establishes 
       to the satisfaction of the Minister that such parts of the Work are 
       free from all claims, liens, attachments, charges or encumbrances;

       (c)  with respect to all parts of the Work, the costs of which have 
       been recorded in the accounts of the Contractor as a liability to be 
       discharged in the normal course of business and in respect of which 
       parts of the Work payment is being made by Canada, the Contractor, 
       where required to do so, establishes to the satisfaction of the 
       Minister that it is not, in the ordinary course of business, 
       delinquent in discharging its recorded liabilities arising from the 
       performance of the Contract and that the payment to be made by 
       Canada shall be used only for the purpose of discharging such 
       liability and that on such discharge the parts of the Work shall be 
       free from all claims, liens, charges or encumbrances; and

       (d)  in the case of payment in respect of finished Work, or any part 
   thereof, such Work has been accepted in accordance with the terms of 
   this Contract. 

H3009C

Effective Date
Item Status
ID
Title
2016-01-28ActiveH3009CMilestone Payments - Subject to holdback

Remarks – Recommended Use of SACC Item

Use the following clause in contracts when progress payment against milestone will be made in accordance with an established schedule of milestones using form PWGSC-TPSGC 1111 and the amount claimed is subject to holdback. Use clause H3010C when the amount claimed is not subject to holdback.

Use this clause in conjunction with H3022C or H3024C and H4012C , if applicable.

For more information on progress payments, consult 4.70.30.15 of the Supply Manual . Milestone payment is a form of progress payment addressed under the policy related to progress payments.

Instructions to contracting officers:

  1. Delete paragraph 1.(b) if not applicable.
  2. Insert one of the following options in paragraph 2 of the clause. If the options provided below do not reflect the requirement, contracting officers may revise the paragraph accordingly.
    • Option 1: Use this paragraph in unit prices contract when the holdback will be paid upon delivery and acceptance of the item for which milestones payments were made.
      "The balance of the amount payable will be paid in accordance with the payment provisions of the Contract upon completion and delivery of the item if the Work has been accepted by Canada and a final claim for the payment is submitted."
    • Option 2: Use this paragraph when payment will be made upon completion and acceptance of all work and deliveries.
      "The balance of the amount payable will be paid in accordance with the payment provisions of the Contract upon completion and delivery of all Work required under the Contract if the Work has been accepted by Canada and a final claim for the payment is submitted."

Legal text for SACC item

  1. Canada will make milestone payments in accordance with the Schedule of Milestones detailed in the Contract and the payment provisions of the Contract, up to ________ percent of the amount claimed and approved by Canada if:
    1. an accurate and complete claim for payment using form PWGSC-TPSGC 1111, Claim for Progress Payment, and any other document required by the Contract have been submitted in accordance with the invoicing instructions provided in the Contract;
    2. the total amount for all milestone payments paid by Canada does not exceed _____ percent of the total amount to be paid under the Contract;
    3. all the certificates appearing on form PWGSC-TPSGC 1111 have been signed by the respective authorized representatives;
    4. all work associated with the milestone and as applicable any deliverable required have been completed and accepted by Canada.
  2. __________ (insert one of the options provided under the Remarks section above.)
2010-01-11SupersededH3009CARCHIVED Milestone Payments
2008-05-12SupersededH3009CARCHIVED Milestone Payments
2007-11-30SupersededH3009CARCHIVED Milestone Payments

H3010C

Effective Date
Item Status
ID
Title
2016-01-28ActiveH3010CMilestone Payments - Not subject to holdback

Remarks – Recommended Use of SACC Item

Use the following clause in contracts when progress payment against milestone will be made in accordance with an established schedule of milestones using form PWGSC-TPSGC 1111 and the amount claimed is not subject to holdback. Use clause H3009C when the amount claimed is subject to holdback.

Use this clause in conjunction with H3022C or H3024C and H4012C , if applicable.

For more information on progress payments, consult 4.70.30.15 of the Supply Manual . Milestone payment is a form of progress payment addressed under the policy related to progress payments.

Legal text for SACC item

Canada will make milestone payments in accordance with the Schedule of Milestones detailed in the Contract and the payment provisions of the Contract if:

  1. an accurate and complete claim for payment using PWGSC-TPSGC 1111, Claim for Progress Payment, and any other document required by the Contract have been submitted in accordance with the invoicing instructions provided in the Contract;
  2. all the certificates appearing on form PWGSC-TPSGC 1111 have been signed by the respective authorized representatives;
  3. all work associated with the milestone and as applicable any deliverable required has been completed and accepted by Canada.
2010-01-11SupersededH3010CARCHIVED Milestone Payments
2008-05-12SupersededH3010CARCHIVED Milestone Payments
2007-11-30SupersededH3010CARCHIVED Milestone Payments

H3012D

Effective Date
Item Status
ID
Title
1992-01-31SupersededH3012DARCHIVED Method of Payment

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

Monthly progress payments will be made up to ___% for actual time worked 
and up to ___% for _____ (direct expenses/travel and living expenses/etc.) 
incurred, provided that:

(i) invoices are submitted in accordance with the invoicing instructions 
contained herein;

(ii) all direct expenses, travel and living expenses, etc. are supported by 
invoices, receipts, vouchers;

(iii) time sheets are provided to support time being claimed.  


H3013D

Effective Date
Item Status
ID
Title
1992-01-31SupersededH3013DARCHIVED Method of Payment

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

The accumulated holdback will be released upon receipt of an invoice and 
   acceptance of all work and/or deliverables by the Project Authority.  

H3014D

Effective Date
Item Status
ID
Title
1992-01-31SupersededH3014DARCHIVED Method of Payment

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

Progress payments will be made not more frequently than once a month, upon 
the following terms and conditions:

1. Progress Claims shall be completed in full, including a brief report of 
the progress of the work to the date of the claim, and submitted on Form 
DSS 1111, in accordance with invoicing instructions specified herein.

2. All the certificates appearing on the said form are to be signed by or 
for the respective persons indicated thereon.

3. Payments will be made up to ___% of the claimed amount approved by the 
Minister, but in no event will cumulative payments exceed ___% of the 
contract value, provided that:

(i) all direct expenses, travel and living expenses, etc. are supported by 
invoices, receipts, vouchers, etc.;

(ii) each claim shows:

a) expenditures plus prorated profit or fee or, alternatively, the value of 
milestones during the claim period by line item as detailed in the basis of 
payment;

b) Holdback at _____%, calculated on the amount in a);

c) Goods and Services Tax on the amount in a) above.

4. The Contractor shall prepare the original and ___ copies of the Claim 
for Progress Payment (Form DSS 1111) and they shall be routed as follows:

a) Project/Inspection Authority;

b) Contracting Authority (DSS);

c) Payment Office.  

H3016C

Effective Date
Item Status
ID
Title
1992-01-31SupersededH3016CARCHIVED Method of Payment

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

1.     Payment by Her Majesty for the work shall be made in accordance with 
       the Basis of Payment specified herein:

       (a)    within thirty (30) days following the date on which the work 
              has been performed;

       (b)    within thirty (30) days following the date on which an 
              invoice and substantiating documentation are received 
              according to the terms of the Contract;

              whichever is later.

2.     If Her Majesty has any objection to the form of the invoice or the 
       substantiating documentation, with fifteen (15) days of its receipt, 
       She shall notify the Contractor of the nature of the objection. "
       Form of the invoice" means an invoice which contains or is 
       accompanied by such substantiating documentation as Her Majesty 
       requires. Failure by Her Majesty to act within fifteen (15) days 
       will only result in the date specified in paragraph 1 of the clause 
       to apply for the sole purpose of calculating interest on overdue 
       accounts.

H3017D

Effective Date
Item Status
ID
Title
1992-01-31CancelledH3017DARCHIVED Invoicing and Method of Payment

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

1.     Payments shall be made for services rendered relating to the 
       Milestones as stated in Annex "D" attached. Corresponding invoices 
       showing the DSS file number, contract serial number and financial 
       codes shall be made out to the Department of National Defence and 
       mailed in duplicate to the Mapping and Charting Establishment, 
       National Defence Headquarters, Ottawa, Ontario, K1A 0K2 for 
       certification and onward transmission for payment.

       (a)    50% of the firm lot price per graphic will be paid to the 
              selected Contractor for each graphic accepted by the Project 
              Authority upon receipt and acceptance of the "derived 
              manuscripts", "keys", "overlays", "edge tie strips", 
              "in-house colour proof" and a satisfactory invoice.

       (b)    50% of the firm lot price will be paid to the selected 
   Contractor for each graphic accepted by the Project Authority upon 
   receipt and acceptance of the final "reproduction negatives", "final 
   full colour proof" and a "satisfactory invoice". When the last/final "
   graphic" of the contract is submitted, the selected Contractor will at 
   this point return all the technical specifications (as amended), plus 
   materials provided by the Department of National Defence for the 
   contract, to the Project Authority. Upon final inspection and acceptance 
   of all materials associated with the contract,by the Department of 
   National Defence (MCE), final payment shall be made to the selected 
   Contractor. 

H3018C

Effective Date
Item Status
ID
Title
2015-02-25ActiveH3018CInvoicing - Air Charter

Remarks – Recommended Use of SACC Item

Use the following clause in standing offers for air charter services for the carriage of goods and people.

Legal text for SACC item

  1. The Contractor must submit invoices in accordance with the section entitled "Invoice Submission" of the general conditions.
    Each invoice must show:
    1. all applicable information as detailed under the section entitled "Invoice Submission" of the general conditions;
    2. the total amount payable based on the Basis of Payment;
    3. the name and address of the client department as shown on the call-up;
    4. the call-up number;
    5. all direct expenses, supported by a copy of invoice
  2. Each original invoice for flying must be supported by charter tickets signed by the Charterer after each flight, showing that the service covered by the invoice has been completed in accordance with the Contract. Contracting officer must choose one of the following options:
    The original and one (1) copy of the invoice must be forwarded to the consignee for certification and payment.
    OR
    The invoice must be distributed as follows:
    1. the original and one (1) copy must be forwarded to the following address for certification and payment: _________. (contracting officers must insert the name and address of the organization)
    2. a copy must be forwarded to the Standing Offer Authority identified under the section entitled "Authorities" of the Standing Offer.
2007-11-30SupersededH3018CARCHIVED Invoicing - Air Charter

H3018D

Effective Date
Item Status
ID
Title
1997-09-15SupersededH3018DARCHIVED Invoicing, Air Charter

Remarks – Recommended Use of SACC Item

Use this clause in solicitation and contract documents covering air charter 
services for the carriage of goods and people.

Legal text for SACC item

1.     Invoices are to be made out to the Charterer and sent to the address 
       on Page 1.

2.     Each original invoice for flying shall be accompanied by charter 
       tickets signed by the Charterer, after each flight, showing that the 
       service covered by the invoice has been completed in accordance with 
       the Contract.

3.     Each original invoice for items listed in the Basis of Payment shall 
       clearly identify the nature of the charge and shall be supported by 
       appropriate receipt vouchers. Goods and Services Tax or Harmonized 
       Sales Tax, as appropriate, is to be shown as a separate item on each 
       invoice.

4.     All invoices for services rendered or for other charges under this 
       contract/call-up shall be submitted as above by the Carrier within 
       three (3) months after such service was performed.


1995-03-31SupersededH3018DARCHIVED Invoicing, Air Charter

H3019T

Effective Date
Item Status
ID
Title
2002-12-13SupersededH3019TARCHIVED Invoicing Instructions

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

1.     Invoices must be submitted on the Contractor's own form and must be 
       prepared to show:

       (a)    the date;
       (b)    name and address of the CONSIGNEE;
       (c)    Contract Number, Serial Number and Financial Code(s);
       (d)    device type, manufacturer, and serial number;
       (e)    Client Reference Number (CRN);
       (f)    Procurement Business Number (PBN). 

2.     Mailing addresses for the invoices will be defined in the resulting 
       contract.

2000-05-12SupersededH3019TARCHIVED Invoicing Instructions
1996-05-01SupersededH3019TARCHIVED Invoicing Instructions

H3020C

Effective Date
Item Status
ID
Title
2015-02-25ActiveH3020CInvoicing Instructions - Maintenance Services

Remarks – Recommended Use of SACC Item

Use the following clause in contracts for maintenance services invoiced monthly or bi-monthly or quarterly.

Legal text for SACC item

  1. The Contractor must submit invoices in accordance with the section entitled "Invoice Submission" of the general conditions along with the ________ (insert "monthly" or "bi-monthly" or"quarterly") maintenance report described in ________ (insert "the Statement of Work" or "article ____" ) of the Contract.
    Invoices cannot be submitted until all work identified in the invoice has been completed and that all maintenance service call reports related to the Work identified in the invoice have been received by the Project Authority.
  2. The Contractor must distribute the invoices and reports as follows:
    The original and two (2) copies of the invoices and ________ (insert "monthly" or "bi-monthly" or "quarterly" ) maintenance reports must be forwarded to the address shown on page 1 of the Contract for certification and payment.
    OR
    The original and two (2) copies of the invoices and ________ (insert "monthly" or "bi-monthly" or "quarterly" ) maintenance reports must be forwarded to the following address for certification and payment ________. (Contracting officers must insert the name and address of the organization)
    One (1) copy of the invoice and ________(insert "monthly" or "bi-monthly" or "quarterly" ) maintenance report must be forwarded to the Contracting Authority identified under the section entitled "Authorities" of the Contract.
2011-05-16SupersededH3020CARCHIVED Invoicing Instructions - Maintenance Services
2007-11-30SupersededH3020CARCHIVED Invoicing Instructions - Maintenance Services

H3020D

Effective Date
Item Status
ID
Title
2004-12-10SupersededH3020DARCHIVED Invoicing Instructions - Maintenance Services

Remarks – Recommended Use of SACC Item

Use the following clause in bid solicitations and contracts for maintenance 
services invoiced monthly.

Legal text for SACC item

I.     Payment will only be made on receipt of satisfactory invoices duly 
       supported by specified release documents and other documents called 
       for under any resulting contract.

2.     An invoice must be submitted monthly, on the Contractor's own form 
       and must be prepared to show:

       (a)    company name and address;
       (b)    File Number, Contract Serial Number, and Financial Code;
       (c)    destination;
       (d)    hourly rate, number of hours, labour cost;
       (e)    cost of materials;
       (f)    Goods and Services Tax/Harmonized Sales Tax, as applicable;
       (g)    Client Reference Number;
       (h)    Procurement Business Number.

3.     The monthly invoice will be processed for payment only if:

       (a)    all the maintenance service call reports applicable for that 
              month as described under Article "_____" of the Statement of 
              Work (SOW) have been received by the Technical Authority; and

       (b)    the monthly maintenance reports as described in Articles "_____
              " and "_____" of the SOW are attached to the monthly invoice.

4.     The original and two (2) copies of the invoices, with the monthly 
       reports, shall be sent to:

       Attention: ______________.

5.     One (1) copy of the invoice accompanied with a copy of the monthly 
       reports shall be sent to:

       Department of Public Works and Government Services
       Attention: _______________.


H3020T

Effective Date
Item Status
ID
Title
2002-12-13SupersededH3020TARCHIVED Invoicing Instructions

Remarks – Recommended Use of SACC Item

Use the following clause for maintenance contracts invoiced monthly.

Legal text for SACC item

1.     Payment will only be made on receipt of satisfactory invoices duly 
       supported by specified release documents and other documents called 
       for under any resulting contract.

2.     An invoice must be submitted monthly, on the Contractor's own form 
       and must be prepared to show:

       (a)    company name and address;
       (b)    File Number, Contract Serial Number, and Financial Code;
       (c)    destination;
       (d)    hourly rate, number of hours, labour cost;
       (e)    cost of materials;
       (f)    Goods and Services Tax;
       (g)    Harmonized Sales Tax;
       (h)    Client Reference Number (CRN);
       (i)    Procurement Business Number (PBN).

3.     The monthly invoice will be processed for payment only if:

       (a)    all the maintenance service call reports applicable for that 
              month as described under Article "_____" of the Statement of 
              Work (SOW) have been received by the Technical Authority; and

       (b)    that the monthly maintenance reports as described in Articles 
              "_____" and "_____" of the SOW are attached to the monthly 
              invoice.

4.     The original and two (2) copies of the invoices with the monthly 
       reports shall be sent to:

       Attention: ______.

5.     One (1) copy of the invoice accompanied with a copy of the monthly 
       reports shall be sent to:

       Department of Public Works and Government Services
       Attention: _______.


2000-05-12SupersededH3020TARCHIVED Invoicing Instructions
1997-09-15SupersededH3020TARCHIVED Invoicing Instructions
1997-02-03SupersededH3020TARCHIVED Invoicing Instructions
1996-05-01SupersededH3020TARCHIVED Invoicing Instructions

H3021D

Effective Date
Item Status
ID
Title
2002-12-13SupersededH3021DARCHIVED Invoicing Instructions

Remarks – Recommended Use of SACC Item

Use the following clause to provide invoicing instructions for requirements with 
a single payment on delivery and acceptance.

Legal text for SACC item

1.     Payment will only be made on receipt of a satisfactory invoice duly 
       supported by specified release documents and other documents called 
       for under the Contract.

2.     Invoices must be submitted on the Contractor's own invoice form and 
       must be prepared to show:

       (a)    the date;
       (b)    name and address of the CONSIGNEE;
       (c)    item/reference number, deliverable and/or description of work;
       (d)    contract serial number and financial codes;
       (e)    the amount invoiced (exclusive of the Goods and Services Tax 
              [GST] or Harmonized Sales Tax [HST] as appropriate) and the 
              amount of GST or HST, as appropriate, shown separately;
       (f)    Client Reference Number (CRN)
       (g)    Procurement Business Number (PBN).


2000-05-12SupersededH3021DARCHIVED Invoicing Instructions
1997-09-15SupersededH3021DARCHIVED Invoicing Instructions
1996-05-01SupersededH3021DARCHIVED Invoicing Instructions

H3022C

Effective Date
Item Status
ID
Title
2016-01-28ActiveH3022CInvoicing Instructions - Progress Payment Claim - Supporting Documentation required

Remarks – Recommended Use of SACC Item

Use the following clause in contracts when the form PWGSC-TPSGC 1111 is required to make progress or milestone payments and supporting documents must be submitted with the claim.

See clause H3024C when no supporting document is required with the claim.

Legal text for SACC item

  1. The Contractor must submit a claim for payment using form PWGSC-TPSGC 1111, Claim for Progress Payment.
    Each claim must show:
    1. all information required on form PWGSC-TPSGC 1111;
    2. all applicable information detailed under the section entitled "Invoice Submission" of the general conditions;
    Instruction to contracting officers: Insert specific information that must be shown on the claim and is not covered under (a) and (b) above to reflect the requirement. The following are examples only.
    1. a list of all expenses;
    2. expenditures plus pro-rated profit or fee;
    3. the description and value of the milestone claimed as detailed in the Contract.
    Instruction to contracting officers: Use the following paragraph when claims must be accompanied by supporting documents. The documents listed are examples only and must be revised to reflect the requirement.
    Each claim must be supported by:
    1. a copy of time sheets to support the time claimed;
    2. a copy of the invoices, receipts, vouchers for all direct expenses, travel and living expenses;
    3. a copy of the monthly progress report.
  2. Applicable Taxes must be calculated on the total amount of the claim before the holdback is applied. At the time the holdback is claimed, there will be no Applicable Taxes payable as it was claimed and payable under the previous claims for progress payments.
  3. The Contractor must prepare and certify one original and two (2) copies of the claim on form PWGSC-TPSGC 1111, and forward it to the ______ (insert "Project" or "Technical" or "Inspection") Authority identified under the section entitled "Authorities" of the Contract for appropriate certification after inspection and acceptance of the Work takes place.
    The ______ (insert "Project" or "Technical" or "Inspection") Authority will then forward the original and two (2) copies of the claim to the Contracting Authority for certification and onward submission to the Payment Office for the remaining certification and payment action.
  4. The Contractor must not submit claims until all work identified in the claim is completed.
2013-04-25SupersededH3022CARCHIVED Invoicing Instructions - Progress Payment Claim
2010-01-11SupersededH3022CARCHIVED Invoicing Instructions - Progress Payment Claim
2008-05-12SupersededH3022CARCHIVED Invoicing Instructions - Progress Claim
2007-11-30SupersededH3022CARCHIVED Invoicing Instructions - Progress Claim

H3022D

Effective Date
Item Status
ID
Title
2005-12-16SupersededH3022DARCHIVED Invoicing Instructions

Remarks – Recommended Use of SACC Item

Use the following clause to provide invoicing instructions when progress 
payments are made.

Legal text for SACC item

1.     Progress payments will only be made upon receipt of satisfactory 
       form PWGSC-TPSGC 1111, Claim for Progress Payment (http://www.pwgsc.gc.ca
       /acquisitions/text/forms/forms-e.html), as specified in the Contract.

2.     Progress claims are to be forwarded to the Project/Inspection 
       Authority for appropriate certification after inspection and 
       acceptance of the Work takes place.  Upon certification, the 
       original and two (2) copies of the claim are then forwarded to the 
       Contracting Authority for certification and onward submission to the 
       Project Manager's Payment Office for all remaining certifications 
       and payment action.

3.     Progress claims shall not be submitted by the Contractor until all 
       Work identified in the claim has been completed.

4.     Goods and Services Tax or Harmonized Sales Tax (GST/HST), as 
       appropriate, is to be calculated and paid on the total amount of the 
       claim before the 10 percent holdback is applied.  At the time that 
       the holdback is released, there will be no GST/HST payable, as it 
       was included in the previous payments.

1997-09-15SupersededH3022DARCHIVED Invoicing Instructions
1996-05-01SupersededH3022DARCHIVED Invoicing Instructions

H3023C

Effective Date
Item Status
ID
Title
2006-06-16SupersededH3023CARCHIVED T1204 - Invoicing Instructions

Remarks – Recommended Use of SACC Item

Use the following clause in procurements involving applicable service 
requirements (such as transportation and telecommunications; advertising 
services; professional and special services; and repair and maintenance 
services), as well as procurements involving a mix of goods and services, when 
the service component is $500 or more in the calendar year, and whenever the 
client department wishes to receive the required information through the 
invoicing procedure.  This includes contracts or standing offers with Canadians 
undertaking government work abroad.

Legal text for SACC item

1.     Pursuant to paragraph 221(1)(d) of the Income Tax Act, R.S.C. 1985, 
       c.1 (5th Supp.), payments made by departments and agencies to 
       contractors under applicable services contracts (including contracts 
       involving a mix of goods and services) must be reported on a T1204 
       Government Service Contract Payments slip.

2.     To enable departments and agencies to comply with this requirement, 
       the Contractor must provide the following information with its first 
       invoice:

       (a)    the legal name of the Contractor, i.e. the legal name 
              associated with its business number or Social Insurance 
              Number (SIN), as well as its address and postal code;

       (b)    the status of the Contractor, i.e. an individual, a sole 
              proprietorship, a corporation, or a partnership;

       (c)    the business number of the Contractor if the Contractor is a 
              corporation or a partnership and the SIN if the Contractor is 
              an individual or a sole proprietorship.  In the case of a 
              partnership, if the partnership does not have a business 
              number, the partner who has signed the Contract must provide 
              its SIN;

       (d)    in the case of a joint venture, the business number of all 
              parties to the joint venture who have a business number or 
              their SIN if they do not have a business number.

3.     If the information includes a SIN, the information should be 
   provided in a separate envelope marked "PROTECTED" and attached to the 
   invoice.

H3023D

Effective Date
Item Status
ID
Title
2004-12-10SupersededH3023DARCHIVED T1204 - Invoicing Instructions

Remarks – Recommended Use of SACC Item

Use the following clause in procurements involving applicable service 
requirements (such as transportation and telecommunications; advertising 
services; professional and special services; and purchase repair and 
maintenance), if the service component is $500 or more in the calendar year, (as 
well as procurement involving a mix of goods and services).  This includes 
contracts or standing offers with Canadians undertaking government work abroad, 
and whenever the client department wishes to receive the required information 
through the invoicing procedure.

Legal text for SACC item

1.     Pursuant to paragraph 221 (1)(d) of the Income Tax Act, payments 
       made by departments and agencies to contractors under applicable 
       services contracts (including contracts involving a mix of goods and 
       services) must be reported on a T1204, Government Service Contract 
       Payments slip.

2.     To enable departments and agencies to comply with this requirement, 
       the Contractor shall provide the information listed below with its 
       first invoice.  Where the required information includes a Social 
       Insurance Number (SIN), the information should be provided in a 
       separate envelope marked "PROTECTED" and attached to the invoice:

       (a)    the legal name of the business entity or sole proprietorship, 
              as applicable, i.e. the legal name associated with the 
              Business Number (BN) or SIN, as well as the address and the 
              postal code;

       (b)    the type of entity, i.e. corporation, partnership, sole 
              proprietorship, or joint venture;

       (c)    the BN if the entity is a corporation or partnership; the SIN 
              if the entity is a sole proprietorship:

              (i)    if the entity is a partnership and does not have a BN, 
                     then the partner who has signed the contract must 
                     provide its SIN.

              (ii)   if the entity is a joint venture, then the BN of all 
                     contractors comprising the joint venture that will 
                     receive payment (SIN for applicable contractor(s) 
                     without a BN);

       (d)    the following certification signed by the Contractor or an 
              authorized officer:

              "I certify that I have examined the information provided in (
              a), (b) and (c) above, and that it is correct and complete, 
              and fully discloses the identification of this Contractor."



2004-05-14SupersededH3023DARCHIVED T1204 Government Service Contract Payments
2002-12-13SupersededH3023DARCHIVED T1204 Government Service Contract Payments
2000-05-12SupersededH3023DARCHIVED T4A Supplementary Slip Requirement - Invoicing Procedures
1998-11-23SupersededH3023DARCHIVED T4A Supplementary Slip Requirement - Invoicing Procedures

H3024C

Effective Date
Item Status
ID
Title
2016-01-28ActiveH3024CInvoicing Instructions - Progress Payment Claim - Supporting Documentation not required

Remarks – Recommended Use of SACC Item

Use the following clause in contracts when the form PWGSC-TPSGC 1111 is required to make progress or milestone payments and no supporting document is required with the claim.

See clause H3022C when supporting documents must be submitted with the claim.

Legal text for SACC item

  1. The Contractor must submit a claim for payment using form PWGSC-TPSGC 1111, Claim for Progress Payment.
    Each claim must show:
    1. all information required on form PWGSC-TPSGC 1111;
    2. all applicable information detailed under the section entitled "Invoice Submission" of the general conditions;
    Instruction to contracting officers: Insert specific information that must be shown on the claim and is not covered under (a) and (b) above to reflect the requirement. The following are examples only.
    1. a list of all expenses;
    2. expenditures plus pro-rated profit or fee;
    3. the description and value of the milestone claimed as detailed in the Contract.
  2. Applicable Taxes, must be calculated on the total amount of the claim before the holdback is applied. At the time the holdback is claimed, there will be no Applicable Taxes payable as it was claimed and payable under the previous claims for progress payments.
  3. The Contractor must prepare and certify one original and two (2) copies of the claim on form PWGSC-TPSGC 1111, and forward it to the __________ (insert "Project" or "Technical" or "Inspection") Authority identified under the section entitled "Authorities" of the Contract for appropriate certification after inspection and acceptance of the Work takes place.
    The ________ (insert "Project" or "Technical" or "Inspection") Authority will then forward the original and two (2) copies of the claim to the Contracting Authority for certification and onward submission to the Payment Office for the remaining certification and payment action.
  4. The Contractor must not submit claims until all work identified in the claim is completed.
2013-04-25SupersededH3024CARCHIVED Invoicing Instructions - Progress Payment Claim
2010-01-11SupersededH3024CARCHIVED Invoicing Instructions - Progress Payment Claim
2008-05-12SupersededH3024CARCHIVED Invoicing Instructions - Progress Claim
2007-11-30SupersededH3024CARCHIVED Invoicing Instructions - Progress Claim

H3025D

Effective Date
Item Status
ID
Title
1991-06-01SupersededH3025DARCHIVED Progress Payments

Remarks – Recommended Use of SACC Item

Use the following clause to cover normal arrangements for progress payments in 
bid solicitations and contracts for shipbuilding or ship repair or alteration or 
repair to real property, or where the holdback is pursuant to legislation.  
Enter fill-in data.

1.  The routing instructions of paragraph 5 are those used for most contracts.  
These may be adjusted to suit a particular contract so long as the Payment 
Office is the last one to receive the claim.

2.  If holdback will be applied at different rates for different line items, 
then it should be reflected in clause H3025D.  The following is an option clause 
relative to a holdback position on any given procurement and relates to 
paragraph 3 and 4.b) of standard clause H3025D.  If the same rate of 
payments/holdback is not applicable to all commodities or phases of the 
procurement, add the following phrase to the foregoing:

	"applicable to _____ (name the commodity or phase of the contract appropriate 
to the payment/holdback rate stated) and payment/holdback equal to _____ percent 
of such expenditures applicable to _____ (name the commodity or phase of the 
contract appropriate to the payment/holdback rate stated )."

3.  Should the Contractor require detailed information on elements of price such 
as material, then this must also be reflected in clause H3025D.

Legal text for SACC item

Progress payments will be made not more frequently that once a month upon 
the following terms and conditions:

1.  Progress claims shall be completed in full including a brief report of 
the progress of the work to the date of the claim, and submitted to the 
Minister on form DSS-MAS 1111, Claim for Progress Payment.

2.  All the certificates appearing on the form are to be signed by or for 
the respective persons indicated.

3.  Payments shall be made up to _____ percent of the claimed amounts 
approved by the Minister but in no event shall cumulative payments exceed _____ 
percent of the Contract value.

4.  Each claim shall show:

       a)  expenditures plus pro-rated profit or fee or, alternatively, the 
       value of milestones during the claim period by line item as detailed 
       in the payment terms of the Contract;

       b)  holdback at _____ percent, calculated on the amount in a);

       c)  goods and services tax, calculated on the amount in a) above 
       less the amount of the holdback.

5.  The Contractor shall prepare the original and _____ copies of the Claim 
   for Progress Payment, form DSS-MAS 1111, and forward them to the 
   scientific/inspection authority, who in turn will send them to the DSS 
   representative for further submission to the payment office.

H3026T

Effective Date
Item Status
ID
Title
1991-06-01CancelledH3026TARCHIVED Progress or Advance Payments

Remarks – Recommended Use of SACC Item

Use the following clause in a bid solicitation when it is intended that progress 
or advance payments will be made upon request and where the resulting contract 
will be for shipbuilding or ship repair or alteration or repair to real 
property, or where the holdback is pursuant to legislation.  Enter fill-in data. 

NOTES:

The following is an option clause relative to a holdback position on any given 
procurement and relates to paragraphs 4 and 5(c) of standard clause H3026T.  If 
the same rate of payment/holdback is not applicable to all commodities or phase 
of the procurement, then add the following phrase to the foregoing:

	"applicable to _____(name the commodity or phase of the contract appropriate to 
the payment/holdback rate stated) and payment/holdback equal to _____ percent of 
such expenditures applicable to _____(name the commodity or phase of the 
contract appropriate to the payment/holdback rate stated)."

Legal text for SACC item

1.     Progress or advance payments will be made if requested in the bid, 
       but not more frequently than once a month upon the following terms 
       and conditions:

       (a)    Arrangements for progress or advance payments will constitute 
              a bid evaluation criterion.  The preferred method of payment 
              is stated below:

              (i)    Advance payments: _____ percent of Contract value _____ 
                     months after Contract award date (third party 
                     guarantees will be made available as set out in 
                     attachment _____).

              (ii)   Progress Payments:

                     (1)    milestones achieved, as described on attachment _____ 
                            and corresponding values as set out;

                     (2)    cost incurred (plus pro-rated fee or profit), 
                            with projected monthly instalments as set out 
                            in attachment _____;

                     (3)    combination of (1) and (2) above, as set out in 
                            attachment _____.

              (iii)combination of a) and b) above, as set out in
                     attachment _____.

       (b)    Progress claims shall be completed in full including a brief 
              report of the progress of the work to date of the claim, and 
              submitted to the Minister on form DSS-MAS 1111, Claim 
              Progress Payment.

       (c)    All the certificates appearing on the said form are to be 
              signed by or for the respective persons indicated.

       (d)    Progress payments will be made up to _____ percent of the 
              claimed amounts approved by the Minister but in no event will 
              cumulative payments exceed _____ percent of the Contract 
              value.

       (e)    Each progress claim will show:

              (i)    expenditures plus pro-rated profit or fee or, 
                     alternatively, the value of milestones during the 
                     claim period by line item as detailed in the payment 
                     terms of any contract resulting from this bid;

              (ii)   holdback at _____ percent, calculated on the amount in 
                     a);

              (iii)goods and services tax on the amount in a) above, 
                     less the amount of the holdback.

       (f)    The Bidder shall prepare the original and _____ copies of the 
   Claim for Progress Payment, form DSS-MAS 1111, and forward them to the 
   scientific/inspection authority who in turn will send them to the DSS 
   representative for further submission to the payment office.

H3027C

Effective Date
Item Status
ID
Title
2016-01-28ActiveH3027CElectronic Payment of Invoices - Contract

Remarks – Recommended Use of SACC Item

Use the following clause in contracts when the contractor indicated in its bid that payment of invoices by Electronic Payment Instruments will be accepted, and clause H3027T was included in the bid solicitation.

For more information, consult 4.70.55 of the Supply Manual .

Contracting officers must indicate from the list provided below, which Electronic Payment Instruments are accepted by the Contractor, as identified in their bid.

Legal text for SACC item

(Contracting officers must include in the contract Electronic Payment Instruments accepted by the contractor, as identified in its bid and renumber accordingly.)

The Contractor accepts to be paid using the following Electronic Payment Instrument(s):

  1. Visa Acquisition Card;
  2. MasterCard Acquisition Card;
  3. Direct Deposit (Domestic and International);
  4. Electronic Data Interchange (EDI);
  5. Wire Transfer (International Only);
  6. Large Value Transfer System (LVTS) (Over $25M)
2010-01-11SupersededH3027CARCHIVED Payment of Invoices by Credit Card
2008-05-12SupersededH3027CARCHIVED Payment of Invoices by Credit Card
2004-12-10SupersededH3027CARCHIVED Payment of Invoices by Credit Card
2002-12-13SupersededH3027CARCHIVED Payment of Invoices by Credit Card
2000-12-01SupersededH3027CARCHIVED Payment of Invoices by Credit Card
1997-02-03SupersededH3027CARCHIVED Payment of Invoices by Credit Card
1996-10-30SupersededH3027CARCHIVED Payment of Invoices by Credit Card

H3027T

Effective Date
Item Status
ID
Title
2016-01-28ActiveH3027TElectronic Payment of Invoices - Bid

Remarks – Recommended Use of SACC Item

Use the following clause in bid solicitations when the client department would like to know whether the bidder is willing to accept payment of invoices by Electronic Payment Instruments listed in the clause below.

Use this clause in conjunction with H3027C .

Refer to section 4.70.55 of the Supply Manual for more information.

Legal text for SACC item

Canada requests that Bidders complete option 1 or 2 below:

  1. ( ) Electronic Payment Instruments will be accepted for payment of invoices.
    The following Electronic Payment Instrument(s) are accepted:
    • ( ) VISA Acquisition Card;
    • ( ) MasterCard Acquisition Card;
    • ( ) Direct Deposit (Domestic and International);
    • ( ) Electronic Data Interchange (EDI);
    • ( ) Wire Transfer (International Only);
    • ( ) Large Value Transfer System (LVTS) (Over $25M)
  2. ( ) Electronic Payment Instruments will not be accepted for payment of invoices.

The Bidder is not obligated to accept payment by Electronic Payment Instruments.

Acceptance of Electronic Payment Instruments will not be considered as an evaluation criterion.

2015-07-03SupersededH3027TARCHIVED Payment of Invoices by Credit Card
2008-05-12SupersededH3027TARCHIVED Payment of Invoices by Credit Card
2004-12-10SupersededH3027TARCHIVED Payment of Invoices by Credit Card
2002-12-13SupersededH3027TARCHIVED Payment of Invoices by Credit Card
2000-12-01SupersededH3027TARCHIVED Payment of Invoices by Credit Card
1997-02-03SupersededH3027TARCHIVED Payment of Invoices by Credit Card
1996-10-30SupersededH3027TARCHIVED Payment of Invoices by Credit Card

H3028C

Effective Date
Item Status
ID
Title
2010-01-11ActiveH3028CAdvance Payment

Remarks – Recommended Use of SACC Item

Use the following clause in contracts when advance payment will be made.

Use this clause in conjunction with K9010C , if applicable.

For more information, consult 4.70.30 of the Supply Manual .

Legal text for SACC item

Canada will pay the Contractor in advance for the Work if:

  1. an accurate and complete invoice and any other documents required by the Contract have been submitted in accordance with the invoicing instructions provided in the Contract;
  2. all such documents have been verified by Canada.
2008-05-12SupersededH3028CARCHIVED Advance Payment
2007-11-30SupersededH3028CARCHIVED Advance Payment

H3028D

Effective Date
Item Status
ID
Title
2004-12-10SupersededH3028DARCHIVED Method of Payment/Advance Payment

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

1.     Payment in advance by Canada to the Contractor for the Work shall be 
       made within:

       (a)    thirty (30) days following the date on which an invoice and 
              substantiating documentation are received according to the 
              terms of the Contract; or

       (b)    thirty (30) days following the date specified herein for the 
              making of such advance payment;

       whichever date is the later.

2.     If Canada has any objection to the form of the invoice or the 
       substantiating documentation, within fifteen (15) days of its 
       receipt, Canada shall notify the Contractor of the nature of the 
       objection. "Form of the invoice" means an invoice which contains or 
       is accompanied by such substantiating documentation as Canada 
       requires.  Failure by Canada to act within fifteen (15) days will 
       only result in the date specified in subsection 1 of the clause to 
       apply for the sole purpose of calculating interest on overdue 
       accounts.


2000-12-01SupersededH3028DARCHIVED Method of Payment/Advance Payment
1997-09-15SupersededH3028DARCHIVED Method of Payment/Advance Payment

H4000C

Effective Date
Item Status
ID
Title
1991-06-01SupersededH4000CARCHIVED Progress Reports, etc.

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

Progress reports, costing data, duplicates of orders, flow sheets, 
   estimates of person-hours expended, and the rules of correspondence with 
   respect to the Work are to be submitted monthly to the satisfaction of 
   the Minister. 

H4001C

Effective Date
Item Status
ID
Title
1991-06-01SupersededH4001CARCHIVED Reports

Remarks – Recommended Use of SACC Item

Use the following clause in Science contracts when the schedule of reports to be 
delivered is not included in the Statement of Work. 

Legal text for SACC item

In addition to brief (letter) progress reports submitted with monthly 
   invoices, the Contractor shall deliver a draft report in ____ copies, no 
   later than _____ (date), and a final report in ____ copies, no later 
   than _____ (date), to the Scientific Authority. 

H4001D

Effective Date
Item Status
ID
Title
1997-09-15SupersededH4001DARCHIVED Draft and Final Report

Remarks – Recommended Use of SACC Item

Use the following clause when the schedule of reports to be delivered is not 
included in the Statement of Work. This clause should be used in conjunction 
with H4002D.

Legal text for SACC item

In addition to the _____ progress reports, the Contractor shall deliver a 
draft report in _____ copies, no later than _____ (date), and a final 
report in ____ copies, no later than _____ (date), to the Technical 
Authority.


H4002C

Effective Date
Item Status
ID
Title
1991-06-01SupersededH4002CARCHIVED Progress Reports - Monthly

Remarks – Recommended Use of SACC Item

Use the following clause in Science contracts when the schedule and content of 
the reports to be delivered are not detailed in the Statement of Work. 

Legal text for SACC item

The Contractor shall prepare and submit monthly progress reports in _____ 
copies to the Scientific Authority.  One copy of the report shall also be 
forwarded to the Science Contracting Officer.

Each progress report shall be in three parts:

PART 1:  The following three questions MUST be answered:

       1.  Is the project on schedule?

       2.  Is the project within budget?

       3.  Is the project free of any areas of concern in which the 
       assistance or guidance of Canada may be required?

       Each negative response must be supported with an explanation.

PART 2:  A narrative report, brief, yet sufficiently detailed to enable the 
Scientific Authority to evaluate the progress of the Work, containing as a 
minimum:

       1.  A description of the progress of each task and of the Work as a 
       whole during the period of the report.  Sufficient sketches, 
       diagrams, photographs, etc., shall be included, as necessary, to 
       describe the progress accomplished.

       2.  An explanation of any variation from the plan of Work.

       3.  A description of trips or conferences connected with the 
       Contract during the period of the report.

       4.  A description of any major equipment purchased or constructed 
       during the period of the report.

PART 3:  The Contract Plan and Report Form, DSS-MASS 9143-3, showing the 
following:

       1.  Actual and forecast expenditure on a monthly basis for the 
       period being covered.  (Expenditures are to be outlined by month and 
       by task.)

       2.  Progress of the Work against the Contractor's original Contract 
   Plan (instructions for showing the above on the Contract Plan are 
   detailed in Annex "___" attached).  The Contract Plan and Report Form 
   will provide the basis for measuring the progress of the Work and the 
   performance under this Contract. 

H4002D

Effective Date
Item Status
ID
Title
2003-05-30SupersededH4002DARCHIVED Progress Reports

Remarks – Recommended Use of SACC Item

Use the following clause when the schedule and content of the reports to be 
delivered are not detailed in the Statement of Work.

Legal text for SACC item

1.     The Contractor shall submit _____ (Insert "monthly" or "bi-monthly" 
       and delete this instruction) progress reports in _____ copies to the 
       Technical Authority and one copy to the Contracting Authority.

2.     Each progress report shall be in three parts:

       (a)    PART 1: The following three questions MUST be answered:

              (i)    Is the project on schedule?

              (ii)   Is the project within budget?

              (iii)  Is the project free of any areas of concern in which 
                            the assistance or guidance of Canada may be 
                            required?

              Each negative response must be supported with an explanation.

       (b)    PART 2: A narrative report, brief, yet sufficiently detailed 
              to enable the Technical Authority to evaluate the progress of 
              the Work, containing as a minimum:

              (i)    A description of the progress of each task and of the 
                     Work as a whole during the period of the report.  
                     Sufficient sketches, diagrams, photographs, etc., 
                     shall be included, if necessary, to describe the 
                     progress accomplished.

              (ii)   An explanation of any variation from the plan of Work.

              (iii)  A description of trips or conferences connected with 
                            the Contract during the period of the report.

              (iv)   A description of any major equipment purchased or 
                     constructed during the period of the report.

       (c)    PART 3: The "Contract Plan and Report Form", PWGSC-TPSGC 9143, 
              (or an equivalent form which is acceptable to the Contracting 
              Authority) showing the following:

              (i)    Actual and forecast expenditure on a monthly basis for 
                     the period being covered. (Expenditures are to be 
                     outlined by month and by task.)

              (ii)   Progress of the Work against the Contractor's original 
                     Contract Plan (instructions for showing the above on 
                     the Contract Plan are detailed in Annex "_____" 
                     attached).  The "Contract Plan and Report Form" will 
                     provide the basis for planning and estimating the cost 
                     of work, and reporting actual progress and cost 
                     against the plan during contract performance.


2002-12-13SupersededH4002DARCHIVED Progress Reports
1997-09-15SupersededH4002DARCHIVED Progress Reports

H4003C

Effective Date
Item Status
ID
Title
1998-06-15SupersededH4003CARCHIVED Milestone Report

Remarks – Recommended Use of SACC Item

Use the following clause when milestone reports are required. This clause may be 
used in conjunction with H3005D.

Legal text for SACC item

1.     The Contractor shall prepare and submit a milestone report in ____ 
       copies to the Technical Authority. One copy of the report shall also 
       be forwarded to the Contracting Authority.

2.     This report shall be submitted for each milestone listed in the "
       Schedule of Milestones" attached as Annex "____."

3.     Each report shall consist of a narrative which shall contain, as a 
       minimum:

       (a)    a description of the Work completed under the milestone; and
       (b)    any problems encountered or foreseen (relating to time, cost 
              or technical matters).

1991-06-01SupersededH4003CARCHIVED Milestone Report

H4004C

Effective Date
Item Status
ID
Title
1991-06-01SupersededH4004CARCHIVED Milestone/Phase Authorization

Remarks – Recommended Use of SACC Item

Use the following clause in Science contracts when prior authority to proceed to 
the next milestone/phase of the work must be given to the contractor by the 
Science Contracting Officer.

Legal text for SACC item

Following completion of each milestone/phase, the Contractor shall be 
   notified, in writing, by the Science Contracting Officer either that it 
   is to proceed with the next milestone/phase or that Canada wishes to 
   withdraw any further support from the project and terminate the Contract 
   without further liability.  In the event Canada wishes to withdraw its 
   support, and subject to all other terms and conditions of the Contract, 
   the Contractor will be paid the holdback owing to it in accordance with 
   the holdback provision of the Method of Payment clause contained herein.  
   In no event will the Contractor be paid for any costs incurred in work 
   performed on any unauthorized milestone/phase.

H4004D

Effective Date
Item Status
ID
Title
1997-09-15CancelledH4004DARCHIVED Milestone / Phase Authorization

Remarks – Recommended Use of SACC Item

Use the following clause when prior authority to proceed to the next 
milestone/phase of the work must be given to the contractor by the contracting 
officer.

Legal text for SACC item

Following completion of each milestone/phase, the Contractor shall be 
notified, in writing, by the Contracting Authority either that it is to 
proceed with the next milestone/phase or that Canada wishes to withdraw any 
further support from the project and terminate the Contract without further 
liability. In the event Canada wishes to withdraw its support, and subject 
to all other terms and conditions of the Contract, the Contractor will be 
paid the holdback owing to it in accordance with the holdback provision of 
the Method of Payment clause contained herein. In no event will the 
Contractor be paid for any costs incurred in work performed on any 
unauthorized milestone/phase.


H4005C

Effective Date
Item Status
ID
Title
1991-06-01SupersededH4005CARCHIVED Draft Final Report

Remarks – Recommended Use of SACC Item

Use the following clause in Science contracts when a draft final report is 
required and details of the report content have not been included in the 
Statement of Work.  When this clause is listed in the contract, it should be 
followed by clause H4006C.

Legal text for SACC item

A draft of the final report shall be submitted on or before _____ for the 
approval of the Scientific Authority.  It must be a comprehensive report on 
all facets of the Work and must include sufficient drawings, sketches, 
photographs and a discussion of problems and successes associated with the 
Work to facilitate a full and accurate evaluation of the Work by the 
Scientific Authority.  The report will be prepared in accordance with good 
engineering/ professional practices and will include, as a minimum, the 
following: a title page, a table of contents, an executive summary, an 
introduction, a technical discussion with conclusions and include, as 
applicable, supporting graphs, tables and figures.


H4005D

Effective Date
Item Status
ID
Title
1997-09-15SupersededH4005DARCHIVED Draft Final Report

Remarks – Recommended Use of SACC Item

Use the following clause when a draft final report is required and details of 
the report content have not been included in the Statement of Work. Use this 
clause in conjunction with H4006D.

Legal text for SACC item

A draft of the final report shall be submitted by the Contractor to the 
Technical Authority for approval on or before _____. It must be a 
comprehensive report on all facets of the Work and must include sufficient 
drawings, sketches, photographs and a discussion of problems and successes 
associated with the Work to facilitate a full and accurate evaluation of 
the Work by the Technical Authority. The report will be prepared in 
accordance with good engineering/ professional practices and will include, 
as a minimum, the following: a title page, a table of contents, an 
executive summary, an introduction, a technical discussion with conclusions 
and include, as applicable, supporting graphs, tables and figures.


H4006C

Effective Date
Item Status
ID
Title
1991-06-01SupersededH4006CARCHIVED Final Report

Remarks – Recommended Use of SACC Item

Use the following clause in Science contracts when the customer department has 
requested a draft final report. 

Legal text for SACC item

After approval of the draft final report, the Contractor shall submit _____ 
copies of the final report to the Scientific Authority designated herein.  
The final report shall contain an executive summary in both the French and 
the English language.

A copy of the covering letter accompanying the final report shall be 
   forwarded to the Science Contracting Officer. 

H4006D

Effective Date
Item Status
ID
Title
1997-09-15SupersededH4006DARCHIVED Final Report

Remarks – Recommended Use of SACC Item

Use the following clause in conjunction with H4005D when the customer department 
has requested a draft final report.

Legal text for SACC item

After approval of the draft final report, the final report in _____ copies 
shall be submitted by the Contractor to the Technical Authority on or 
before _____.  The final report shall contain an executive summary, 
prepared in both of Canada's official languages.

A copy of the covering letter accompanying the final report shall be 
forwarded to the Contracting Authority.


H4007C

Effective Date
Item Status
ID
Title
1991-06-01SupersededH4007CARCHIVED Final Report

Remarks – Recommended Use of SACC Item

Use the following clause in Science Contracts when a draft final report is not 
required, and when the form and content of the final report has not been 
detailed in the Statement of Work.

Legal text for SACC item

A final report in _____ copies shall be submitted to the Scientific 
Authority on or before _____.  It must be a comprehensive report on all 
facets of the Work and must include sufficient drawings, sketches, 
photographs and a discussion of problems and successes associated with the 
Work to facilitate a full and accurate evaluation of the Work by the 
Scientific Authority.  The report will be prepared in accordance with good 
engineering/professional practices and will include, as a minimum, the 
following: a title page, a table of contents, an executive summary, an 
introduction, a technical discussion with conclusions and include, as 
applicable, supporting graphs, tables and figures.

The final report shall be prepared in both the French and the English 
language.  A sample title page is attached as Annex "___" to this Contract.  
One copy of the title page of the final report shall be submitted to the 
Science Contracting Officer.


H4007D

Effective Date
Item Status
ID
Title
1997-09-15SupersededH4007DARCHIVED Final Report

Remarks – Recommended Use of SACC Item

Use the following clause when a draft final report is not required, and when the 
form and content of the final report has not been detailed in the Statement of 
Work.

Legal text for SACC item

1.     A final report in _____ copies shall be submitted by the Contractor 
       to the Technical Authority on or before _____. It must be a 
       comprehensive report on all facets of the Work and must include 
       sufficient drawings, sketches, photographs and a discussion of 
       problems and successes associated with the Work to facilitate a full 
       and accurate evaluation of the Work by the Technical Authority. The 
       report will be prepared in accordance with good engineering/
       professional practices and will include, as a minimum, the following: 
       a title page, a table of contents, an executive summary, an 
       introduction, a technical discussion with conclusions and include, 
       as applicable, supporting graphs, tables and figures.

2.     The final report shall be prepared in both of Canada's official 
       languages. A sample title page is attached as Annex "_____" to this 
       Contract. One copy of the title page of the final report shall be 
       submitted to the Contracting Authority.


H4008C

Effective Date
Item Status
ID
Title
2007-11-30ActiveH4008CContract Plan and Report Form

Remarks – Recommended Use of SACC Item

Use the following clause in "Limitation of Expenditure" and "Ceiling Price" contracts when progress or milestone payments will be made and the submission of the contract plan and report form is a condition for payment.

Contracting officers must ensure that the submission of the contract plan and report form is indicated in the invoicing instructions of the contract.

Legal text for SACC item

  1. The Contractor must use the Contract Plan and Report Form, PWGSC-TPSGC 9143 (or an equivalent form acceptable to the Contracting Authority) to report the progress of the Work and the costs to date against the original work plan.
  2. An updated copy of the contract plan and report form must be provided with each claim for payment.
  3. Receipt and acceptance of the contract plan and report form by the Contracting Authority is a condition for payment in accordance with the Contract.
2002-12-13SupersededH4008CARCHIVED Contract Plan and Report Form
1995-03-31SupersededH4008CARCHIVED Contract Plan and Report Form
1991-06-01SupersededH4008CARCHIVED Contract Plan and Report Form

H4009C

Effective Date
Item Status
ID
Title
1998-06-15CancelledH4009CARCHIVED Cash Flow

Remarks – Recommended Use of SACC Item

Use the following clause in multi-fiscal year "Limitation of Expenditure" and 
"Ceiling Price" contracts valued at $100,000 or less.

Legal text for SACC item

Each claim submitted for payment shall be accompanied by a cash flow 
statement showing actual and forecast expenditure on a monthly basis for 
the period the Work is being performed under the Contract. The statement 
shall be in the format attached hereto as Annex "____."

1991-06-01SupersededH4009CARCHIVED Cash Flow

H4010D

Effective Date
Item Status
ID
Title
1997-02-03SupersededH4010DARCHIVED Progress Report

Remarks – Recommended Use of SACC Item

The following clause is used by Aerospace, Marine and Electronics Systems 
Sector, where applicable.

Legal text for SACC item

The Contractor shall supply _____ progress reports (original and one copy) 
to the Department of Public Works and Government Services, Aerospace, 
Marine and Electronics Systems Sector, on forms to be provided by the 
Minister until completion of the Contract.


1991-06-01SupersededH4010DARCHIVED Progress Report

H4011D

Effective Date
Item Status
ID
Title
1997-09-15SupersededH4011DARCHIVED Method of Payment - Services

Remarks – Recommended Use of SACC Item

Use the following clause in services contracts when invoices for expenses are 
required. 

Legal text for SACC item

1.     Payment will be made for services rendered, provided that:

       (a)    invoices are submitted in accordance with the invoicing 
              instructions contained herein;

       (b)    all direct expenses, travel and living expenses, etc. are 
              supported by invoices, receipts, vouchers;

       (c)    time sheets are provided to support the time being claimed.


1992-08-01SupersededH4011DARCHIVED Method of Payment
1992-01-31SupersededH4011DARCHIVED Method of Payment

H4012C

Effective Date
Item Status
ID
Title
2010-01-11ActiveH4012CSchedule of Milestones

Remarks – Recommended Use of SACC Item

Use the following clause in firm price contracts when progress payments against milestones will be made. For more information, consult 4.70.30.15 of the Supply Manual .

Use this clause in conjunction with H3010C or H3009C .

Contracting officers must revise the title of each column as applicable.

Legal text for SACC item

The schedule of milestones for which payments will be made in accordance with the Contract is as follows:

Milestone No. Description or "Deliverable" Firm Amount Due Date or "Delivery Date"

________________

________________

_______________

_________________

________________

________________

_______________

_________________

2007-11-30SupersededH4012CARCHIVED Schedule of Milestones

H4012D

Effective Date
Item Status
ID
Title
2000-12-01SupersededH4012DARCHIVED Method of Payment

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

1.     Milestone payments will be made in accordance with the following 
       schedule:

       Description   Amount        Due Date

       _____         _____         _____

       provided that:

       (a)    invoices are submitted in accordance with the invoicing 
              instructions contained herein;

       (b)    the Project Authority has certified that all work/
              deliverables required under the milestone has/have been 
              accepted.

1992-08-01SupersededH4012DARCHIVED Method of Payment
1992-01-31SupersededH4012DARCHIVED Method of Payment

H4013D

Effective Date
Item Status
ID
Title
1992-01-31SupersededH4013DARCHIVED Progress Reports

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

The Contractor shall provide the Inspection and the Contractual Authority 
with progress reports on the first and fifteenth of each month covering all 
phases of the work. The report shall include, as a minimum the following:

- a summary of work accomplished during the report period, 
- a summary of work planned for the ensuing period, 
- a statement as to whether the work is proceeding according to plan, 
- identification of potential problem areas which may affect the progress 
of the work, and the proposed solutions to those problems, 

- the Contract Plan showing the following:

- actual and forecast expenditures on a bi-monthly basis for the period of 
work being covered, 
- progress of the work against the Contract Plan, (instructions for showing 
the above on the Contract Plan are detailed in Appendix "A", attached. The 
Contract Plan and Report Form will provide the basis for measuring the 
progress of work and the performance under the proposed contract).

Where a claim for progress payment is made, the bi-monthly progress report 
is to be submitted in support of it.  

H4014D

Effective Date
Item Status
ID
Title
1996-10-30CancelledH4014DARCHIVED Cash Flow Prediction

Remarks – Recommended Use of SACC Item

Use this clause when establishing cash flow information applicable to long term 
major procurement programs.

Legal text for SACC item

As soon as reasonably practicable after the effective date of the Contract, 
the Contractor shall provide to the Contracting Authority a written annual 
fiscal year cash flow estimate based on scheduled deliveries. This 
estimated cash flow is required by Canada for planning purposes only and 
the estimate is not intended to be legally binding on the Contractor. The 
Contractor shall also amend the cash flow estimate in writing from time to 
time to effect any changes the Contractor may foresee. 


H4015C

Effective Date
Item Status
ID
Title
2016-01-28ActiveH4015CDraft and Final Report - Schedule

Remarks – Recommended Use of SACC Item

Use the following clause in contracts when the schedule of reports to be delivered is not included in the Statement of Work.

Use this clause in conjunction with H4016C .

Legal text for SACC item

In addition to the _____ (insert "monthly" or "bi-monthly" or "quarterly" as per clause H4016C) reports on the progress of the Work, the Contractor must deliver a draft final report, in electronic format, no later than _____ (insert date), and a final report no later than _____ (insert date), to the _______ (insert "Technical" or "Project") Authority.

2010-08-16SupersededH4015CARCHIVED Draft and Final Report
2008-12-12SupersededH4015CARCHIVED Draft and Final Report
2007-11-30SupersededH4015CARCHIVED Draft and Final Report

H4016C

Effective Date
Item Status
ID
Title
2010-08-16ActiveH4016CProgress Reports

Remarks – Recommended Use of SACC Item

Use the following clause in contracts when progress reports are required and the schedule and the details of the progress reports content are not included in the Statement of Work.

Use this clause in conjunction with H4015C , if applicable.

Legal text for SACC item

  1. The Contractor must submit _____ (insert "monthly" or "bi-monthly" or "quarterly") reports, in electronic format, on the progress of the Work, to both the ______ (insert "Technical" or "Project") Authority and the Contracting Authority.
  2. The progress report must contain three parts:
    1. Part 1: The Contractor must answer the following three questions:
      1. Is the project on schedule?
      2. Is the project within budget?
      3. Is the project free of any areas of concern in which the assistance or guidance of Canada may be required?

      Each negative response must be supported with an explanation.

    2. Part 2: A narrative report, brief, yet sufficiently detailed to enable the ______ (insert "Technical" or "Project") Authority to evaluate the progress of the Work, containing as a minimum:
      1. A description of the progress of each task and of the Work as a whole during the period of the report. Sufficient sketches, diagrams, photographs, etc., must be included, if necessary, to describe the progress accomplished.
      2. An explanation of any variation from the work plan.
      3. A description of trips or conferences connected with the Contract during the period of the report.
      4. A description of any major equipment purchased or constructed during the period of the report.
    3. Part 3: The "Contract Plan and Report Form", PWGSC-TPSGC 9143, (or an equivalent form acceptable to the Contracting Authority) showing the following:
      1. Actual and forecast expenditure on a monthly basis for the period being covered. (Expenditures are to be outlined by month and by task.)
      2. Progress of the Work against the Contractor's original Contract Plan (instructions for showing the above on the Contract Plan are detailed in Annex "_____ " attached). The form will provide the basis for planning and estimating the cost of work, and reporting actual progress and cost against the plan during contract performance.
2007-11-30SupersededH4016CARCHIVED Progress Reports

H4017C

Effective Date
Item Status
ID
Title
2016-01-28ActiveH4017CDraft Final Report - Details

Remarks – Recommended Use of SACC Item

Use the following clause in contracts when a draft final report is required and details of the report content are not included in the Statement of Work.

Use this clause in conjunction with H4018C .

Legal text for SACC item

The Contractor must submit a draft of the final report in electronic format to the ________ (insert "Technical" or "Project") Authority for approval on or before _____ (insert date). It must be a comprehensive report on all facets of the Work and must include sufficient drawings, sketches, photographs and a discussion of problems and successes associated with the Work to facilitate a full and accurate evaluation of the Work by the ________ (insert "Technical" or "Project") Authority. The report must be prepared in accordance with good engineering/professional practices and include, as a minimum, the following: a title page, a table of contents, an executive summary, an introduction, a technical discussion with conclusions and include, as applicable, supporting graphs, tables and figures.

2010-08-16SupersededH4017CARCHIVED Draft Final Report
2007-11-30SupersededH4017CARCHIVED Draft Final Report

H4018C

Effective Date
Item Status
ID
Title
2016-01-28ActiveH4018CDraft Final Report

Remarks – Recommended Use of SACC Item

Use the following clause in contracts when a draft final report is required.

Use this clause in conjunction with H4017C .

Legal text for SACC item

The Contractor must provide the final report, in electronic format, to the _______(insert "Technical" or "Project") Authority within_____ days following approval of the draft final report. The final report must contain an executive summary prepared in both of Canada's official languages.

The Contractor must forward an electronic copy of the covering letter accompanying the final report to the Contracting Authority.

2010-08-16SupersededH4018CARCHIVED Final Report
2007-11-30SupersededH4018CARCHIVED Final Report

H4019C

Effective Date
Item Status
ID
Title
2007-11-30ActiveH4019CFinal Report

Remarks – Recommended Use of SACC Item

Use the following clause in contracts when the requirement does not require a draft final report, and the details of the final report content are not included in the Statement of Work.

Legal text for SACC item

  1. The Contractor must submit a final report in _____ copies to the ______(insert "Technical" or "Project") Authority on or before _____ (insert date). It must be a comprehensive report on all facets of the Work and must include sufficient drawings, sketches, photographs and a discussion of problems and successes associated with the Work to facilitate a full and accurate evaluation of the Work by the ______ (insert "Technical" or "Project") Authority. The report must be prepared in accordance with good engineering/professional practices and include, as a minimum, the following: a title page, a table of contents, an executive summary, an introduction, a technical discussion with conclusions and include, as applicable, supporting graphs, tables and figures. A sample title page is attached as Annex "_____ " to the Contract.
  2. The final report must be prepared in both of Canada's official languages.
  3. The Contractor must forward a copy of the title page of the final report to the Contracting Authority.

H4500C

Effective Date
Item Status
ID
Title
2010-01-11ActiveH4500CLien - Section 427 of the Bank Act

Remarks – Recommended Use of SACC Item

Use the following clause in all contracts for goods with Canadian-based suppliers when advance or progress payments will be made.

For more information, consult 4.70.30.15 of the Supply Manual .

Legal text for SACC item

  1. If any lien under section 427 of the Bank Act, S.C.. 1991, c. 46, exists in respect to any materials, parts, work-in-process, or finished work for which the Contractor intends to claim payment, the Contractor agrees to inform the Contracting Authority without delay and agrees, unless instructed otherwise by the Contracting Authority, either:
    1. to cause the bank to remove such lien and to provide the Contracting Authority with written confirmation from the bank; or,
    2. to provide to the Contracting Authority an undertaking from the bank that the bank will not make any claim under section 427 of the Bank Act on materials, parts, work-in-process, or finished work in respect of which payment is made to the Contractor under the Contract.
  2. Failure to inform the Contracting Authority of such lien or failure to implement paragraph 1(a) or (b) above will constitute default under the default section of the general conditions and will entitle Canada to terminate the Contract.
2007-11-30SupersededH4500CARCHIVED Lien - Section 427 of the Bank Act
1997-09-15SupersededH4500CARCHIVED Liens - Section 427 of the Bank Act
1992-12-01SupersededH4500CARCHIVED Liens Under Section 427 of the Bank Act
1991-06-01SupersededH4500CARCHIVED Liens Under Section 427 of the Bank Act

H4900D

Effective Date
Item Status
ID
Title
1997-09-15SupersededH4900DARCHIVED Method of Payment

Remarks – Recommended Use of SACC Item

Use the following clause in all contracts, standing offers, purchase orders, or 
bid solicitations that provide for progress payments.  Use this clause in 
conjunction with H1003D.

Legal text for SACC item

1.     Payment by Canada to the Contractor for the Work shall be made:

       (a)    in the case of a progress payment other than the final 
              payment, within thirty (30) days following the date of 
              receipt of a duly completed "Claim for Progress Payment", 
              form PWGSC-TPSGC 1111;

       (b)    in the case of a final payment, within thirty (30) days 
              following the date of receipt of a duly completed final "
              Claim for Progress Payment", form PWGSC-TPSGC 1111, or within 
              thirty (30) days following the date on which the Work is 
              completed,

              whichever date is the later. 

2.     If Canada has any objection to the form of the progress claim, 
       within fifteen (15) days of its receipt, Canada shall notify the 
       Contractor of the nature of the objection. "Form of the claim" means 
       a claim which contains or is accompanied by such substantiating 
       documentation as Canada requires. Failure by Canada to act within 
       fifteen (15) days will only result in the date specified in 
       subsections 1(a) and (b) of the clause to apply for the sole purpose 
       of calculating interest on overdue accounts.

1991-06-01SupersededH4900DARCHIVED Method of Payment

H5000C

Effective Date
Item Status
ID
Title
1998-02-16SupersededH5000CARCHIVED Invoicing

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

1.     The invoicing instructions detailed in the Standard Instructions and 
       Conditions and those on page 1 of this document apply.

2.     In addition, send one (1) copy of each invoice and one (1) copy of 
       the Release Document, if applicable, to the Contract Delivery 
       Follow-up (CDFU) office stated herein; AND

       one (1) copy to:

       National Defence Headquarters
       Ottawa, Ontario
       K1A 0K2

       Attention:  _____.

1996-05-01SupersededH5000CARCHIVED Invoicing

H5001C

Effective Date
Item Status
ID
Title
2008-12-12ActiveH5001CInvoicing Instructions

Remarks – Recommended Use of SACC Item

Use the following clause in contracts for goods and services when all information required are covered under the general conditions.

Legal text for SACC item

  1. The Contractor must submit invoices in accordance with the section entitled "Invoice Submission" of the general conditions. Invoices cannot be submitted until all work identified in the invoice is completed.
    Instruction to contracting officers: Use the following paragraph when invoices must be accompanied by supporting documents. The documents listed are examples only and must be revised to reflect the requirement. Delete this paragraph if no supporting documents are required.
    Each invoice must be supported by:
    1. a copy of time sheets to support the time claimed;
    2. a copy of the release document and any other documents as specified in the Contract;
    3. a copy of the invoices, receipts, vouchers for all direct expenses, and all travel and living expenses;
    4. a copy of the monthly progress report.
  2. Invoices must be distributed as follows:
    1. The original and one (1) copy must be forwarded to the address shown on page 1 of the Contract for certification and payment.
      OR
    2. The original and one (1) copy must be forwarded to the following address for certification and payment.
      ______________ (Insert the name of the organization)
      ______________ (Insert the address of the organization)
    3. One (1) copy must be forwarded to the Contracting Authority identified under the section entitled "Authorities" of the Contract.
    4. Instruction to contracting officers: Insert additional distribution as applicable. The following is an example.
      one (1) copy must be forwarded to the consignee.
2008-05-12SupersededH5001CARCHIVED Invoicing Instructions
2007-11-30SupersededH5001CARCHIVED Invoicing Instructions

H5001D

Effective Date
Item Status
ID
Title
2005-06-10SupersededH5001DARCHIVED Invoicing Instructions

Remarks – Recommended Use of SACC Item

No remarks.

Legal text for SACC item

1.     The Contractor shall submit invoices on its own form, and shall 
       include the following information: the date, name and address of the 
       consignee(s), item number, quantity, part number, reference number 
       and description, contract file, serial numbers, Client Reference 
       Number, and Procurement Business Number.  Invoices will be 
       distributed as follows:

       (a)    The original and one copy to (Choose one or the other):
              (i)    Consignee            (    );
              (ii)   Originator           (    ).

       (b)    One (1) copy to:

              Department of Public Works and Government Services 
              (Division) ____________________
              (Address) ____________________
              (City/Prov.) ___________________
              (Postal/Code) _________________

              Attention: _____________________

       (c)    One (1) copy to (Choose one or the other):
              (i)    Consignee            (    );
              (ii)   Originator           (    ).

2.     Canada will only make payment upon receipt of a satisfactory invoice 
       duly supported by specified release documents and any other 
       documents called for under the Contract.

3.     The Contractor shall not submit an invoice prior to either:

       (a)    shipment of the items to which it relates, or
(b)    submission of the shipping application to Canada.


2004-12-10SupersededH5001DARCHIVED Invoicing Instructions
2002-12-13SupersededH5001DARCHIVED Invoicing Instructions
2000-05-12SupersededH5001DARCHIVED Invoicing Instructions
1996-10-30SupersededH5001DARCHIVED Invoicing Instructions

H5002D

Effective Date
Item Status
ID
Title
2002-12-13SupersededH5002DARCHIVED Invoices

Remarks – Recommended Use of SACC Item

Use this clause for Technical Investigation and Engineering Support (TIES) 
requirements.

Legal text for SACC item

1.     The Contractor shall submit monthly invoices for tasks authorized 
       under the Contract. Each invoice shall clearly show the following:

       (a)    contract serial number;
       (b)    contract price;
       (c)    task authorization number;
       (d)    engineering or technical support classification.
       (e)    rate of payment;
       (f)    number of hours applicable to the task;
       (g)    cost of materials related to the task,
       (h)    travel expenses related to the task,
       (i)    Client Reference Number (CRN), and
       (j)    Procurement Business Number (PBN).

2.     The original and two (2) copies of each invoice together with 
       attachments, shall be forwarded to:

       National Defence Headquarters
       MGen George R. Pearkes Building
       101 Colonel By Drive
       Ottawa, ON  K1A 0K2

       Attention: _____.

3.     One copy each invoice, together with attachments, shall be forwarded 
       to the Contracting Authority.


2000-05-12SupersededH5002DARCHIVED Invoices
1996-10-30SupersededH5002DARCHIVED Invoices

H9000D

Effective Date
Item Status
ID
Title
1991-06-01CancelledH9000DARCHIVED Payment and Appropriations

Remarks – Recommended Use of SACC Item

The clause below shall be included in all bid solicitations and contract 
documents apart from those utilising General Conditions - Short Form, DSS-MAS 
9329.  

Legal text for SACC item

Payment under the Contract is subject to there being an appropriation for 
   the particular requirement during the fiscal year when any commitment 
   under the Contract would occur.  

H9001C

Effective Date
Item Status
ID
Title
2007-11-30ActiveH9001CFunding by Fiscal Year

Remarks – Recommended Use of SACC Item

Use the following clause in contracts when the contract period covers more than one fiscal year and the customer department requests that maximum funding for each fiscal year be limited.

Legal text for SACC item

Despite the Total Estimated Cost (Limitation of Expenditure) specified in the Contract, and unless otherwise authorized in writing by the Contracting Authority, the maximum amount which may be paid for work completed in the period ending 31 March of the year specified is as follows:

  • Period of 1st April 20___ to 31 March 20___: $________
  • Period of 1st April 20___ to 31 March 20___: $________
  • Period of 1st April 20___ to 31 March 20___: $________.
2003-05-30SupersededH9001CARCHIVED Funding by Fiscal Year
1991-06-01SupersededH9001CARCHIVED Funding by Fiscal Year