Disassembly of a the Old Chelsea Picnic Area Pedestrian Bridge
Status Awarded
Contract number 588163
Solicitation number AL1476
Publication date
Contract award date
Contract value
Status Awarded
Contract number 588163
Solicitation number AL1476
Publication date
Contract award date
Contract value
The National Capital Commission (NCC) is requesting bids and Waste Reduction Workplan (WRW) from general contractors for the high recovery demolition/deconstruction of: OLD CHELSEA CREEK – PEDESTRIAN BRIDGE Work includes full removal of existing 20m (approx.) wood and steel pedestrian bridge, removal of top 2/3 (approx.) of centre timber crib pier, and removal of remnants of two timber abutments on Chelsea Creek adjoining the Old Chelsea picnic area as shown in the enclosed site plan. Work also includes mobilization/ demobilization, traffic protection and environmental mitigation measures, the removal and return or off-site disposal of material removed as part of the bridge disassembly, site remediation to natural or original use state, and clean-up at all locations affected by the work. The period of work shall be between contract award and January 24, 2014 unless otherwise stipulated in contract documents. This work shall be performed in an environmentally sustainable manner maximizing the reuse and/or recycling of materials. All work shall be carried out in accordance with the requirements contained herein and the successful contractor’s accepted Waste Reduction Workplan (WRW).
Refer to the description above for full details.