Moveable Wall Replacement, Guildford Rec Centre
Solicitation number BC1220-040-2024-007
Publication date
Closing date and time 2024/03/01 19:00 EST
Last amendment date
Description
REQUEST FOR QUOTATIONS
DESCRIPTION OF SCOPE OF WORK
The Work covered under this project consists of the furnishing of all superintendence, overhead, labour, materials, tools, equipment, insurance, fuel, transportation and all things necessary for and incidental to the satisfactory performance and completion of construction and renovation of moveable wall replacement, Guildford Rec Centre, located at 15105 105 Ave Surrey, British Columbia, V3R 7G8 (the “Place of Work”) in strict accordance with the Specifications and accompanying Drawings and subject to all terms and conditions of this RFQ.
The general components of the Work include:
• Supply, installation of a new replacement manual movable wall partition system, including removal and disposal of existing movable wall assembly, as identified in the attached specification.
The detailed scope of Work is as described in the Special Provisions (Schedule B – Appendix 1), Supplementary Specifications (Project) (Schedule B- Appendix 2), and Contract Drawings (listed below) (Schedule B – Appendix 2A).
The lack of and/or omission of detailed specifications does not minimize the acceptable levels of service and only the best commercial practices are acceptable.
Contractor to comply with all BC Plumbing Code, BC Fire Marshal, BC Workers’ Compensation Board, National Building Code of Canada, BC Boiler Inspector, BC Electrical Inspector, National Fire Protection Association, and any other authorities having local jurisdiction. Failure to abide by these rules and regulations will result in being immediately escorted from the work site.
INFORMATION MEETING
An information meeting will be hosted by the City Representative to discuss the City’s requirements under this RFQ (the “Information Meeting”). While attendance is at the discretion of Contractors, Contractors who do not attend will be deemed to have attended the Information Meeting and to have received all of the information given at the Information Meeting.
At the time of issuance of this RFQ a meeting has been scheduled as follows:
Date: February 14th, 2024
Time: 1:00PM Local time
Location: Guildford Recreation Centre – 15105 105 Ave, Surrey, B.C.
Meet in the lower lobby near the front desk.
It is possible that some questions raised, and information provided during the Information Meeting may be the only source of critical information essential to prepare and submit a successful Quotation. Contractors are responsible to ensure they are fully informed and have a clear understanding of the requirements.
Contractors are to examine the site prior to submitting a Quotation to fully acquaint themselves with all existing conditions reasonably inferable from examination of the site and its surroundings and the RFQ and to make allowance for such conditions in the Quotation. By submitting a Quotation, a Contractor represents that it has examined the site fully as to all conditions, contingencies, risks and circumstances, local or otherwise, which might influence or affect the performance of the Work.
Note: No minutes of the Information Meeting will be provided
The Contractor is responsible for any fees incurred as a result of the Information Meeting.
ADDENDA
If the City determines that an amendment is required to this RFQ, the City Representative will issue a written addendum by posting it on the BC Bid website at www.bcbid.gov.bc.ca and the City website at www.surrey.ca (collectively, the “Websites”), and upon posting, any addenda will form a part of this RFQ. It is the responsibility of Contractors to check the Websites for addenda. The only way this RFQ may be added to, or amended in any way, is by a formal written addendum. No other communication, whether written or oral, from any person will affect or modify the terms of this RFQ or may be relied upon by any Contractor. By delivery of a Quotation the Contractor is deemed to have received, accepted and understood the entire RFQ, including any and all addenda.
All inquiries related to this RFQ should be directed in writing to purchasing@surrey.ca
DESCRIPTION OF SCOPE OF WORK
The Work covered under this project consists of the furnishing of all superintendence, overhead, labour, materials, tools, equipment, insurance, fuel, transportation and all things necessary for and incidental to the satisfactory performance and completion of construction and renovation of moveable wall replacement, Guildford Rec Centre, located at 15105 105 Ave Surrey, British Columbia, V3R 7G8 (the “Place of Work”) in strict accordance with the Specifications and accompanying Drawings and subject to all terms and conditions of this RFQ.
The general components of the Work include:
• Supply, installation of a new replacement manual movable wall partition system, including removal and disposal of existing movable wall assembly, as identified in the attached specification.
The detailed scope of Work is as described in the Special Provisions (Schedule B – Appendix 1), Supplementary Specifications (Project) (Schedule B- Appendix 2), and Contract Drawings (listed below) (Schedule B – Appendix 2A).
The lack of and/or omission of detailed specifications does not minimize the acceptable levels of service and only the best commercial practices are acceptable.
Contractor to comply with all BC Plumbing Code, BC Fire Marshal, BC Workers’ Compensation Board, National Building Code of Canada, BC Boiler Inspector, BC Electrical Inspector, National Fire Protection Association, and any other authorities having local jurisdiction. Failure to abide by these rules and regulations will result in being immediately escorted from the work site.
INFORMATION MEETING
An information meeting will be hosted by the City Representative to discuss the City’s requirements under this RFQ (the “Information Meeting”). While attendance is at the discretion of Contractors, Contractors who do not attend will be deemed to have attended the Information Meeting and to have received all of the information given at the Information Meeting.
At the time of issuance of this RFQ a meeting has been scheduled as follows:
Date: February 14th, 2024
Time: 1:00PM Local time
Location: Guildford Recreation Centre – 15105 105 Ave, Surrey, B.C.
Meet in the lower lobby near the front desk.
It is possible that some questions raised, and information provided during the Information Meeting may be the only source of critical information essential to prepare and submit a successful Quotation. Contractors are responsible to ensure they are fully informed and have a clear understanding of the requirements.
Contractors are to examine the site prior to submitting a Quotation to fully acquaint themselves with all existing conditions reasonably inferable from examination of the site and its surroundings and the RFQ and to make allowance for such conditions in the Quotation. By submitting a Quotation, a Contractor represents that it has examined the site fully as to all conditions, contingencies, risks and circumstances, local or otherwise, which might influence or affect the performance of the Work.
Note: No minutes of the Information Meeting will be provided
The Contractor is responsible for any fees incurred as a result of the Information Meeting.
ADDENDA
If the City determines that an amendment is required to this RFQ, the City Representative will issue a written addendum by posting it on the BC Bid website at www.bcbid.gov.bc.ca and the City website at www.surrey.ca (collectively, the “Websites”), and upon posting, any addenda will form a part of this RFQ. It is the responsibility of Contractors to check the Websites for addenda. The only way this RFQ may be added to, or amended in any way, is by a formal written addendum. No other communication, whether written or oral, from any person will affect or modify the terms of this RFQ or may be relied upon by any Contractor. By delivery of a Quotation the Contractor is deemed to have received, accepted and understood the entire RFQ, including any and all addenda.
All inquiries related to this RFQ should be directed in writing to purchasing@surrey.ca
Contract duration
Refer to the description above for full details.
Trade agreements
-
Please refer to tender description or tender documents
Contact information
Contracting organization
- Organization
-
City of Surrey
- Contracting authority
- Sunny Kaila
- Email
- purchasing@surrey.ca
Bidding details
Full details for this tender opportunity are available on a third-party site
Click on the button below to be directed to this website. Note that on the third-party site you may need an account to view and/or bid on this tender. Information on any fees or additional costs to access the full details is outlined in the Description tab of this tender opportunity.