KIKOMUN CREEK PROVINICAL PARK – SURVEYORS LAKE BRIDGE REPLACEMENT
Solicitation number BCENV27-BCPKO-16
Publication date
Closing date and time 2026/06/23 16:00 EDT
Description
This tender includes the detailed design and scope of work to replace the existing pedestrian bridge at
the Kikomun Creek Provincial Park. In general, the work consists of the following:.1 The work of this Contract consists of the supply and installation of materials, including
all labour, equipment and tools related to the Surveyors Lake Bridge Replacement, all
in accordance with the drawings and specifications, and for the prices tendered in the
Schedule of Quantities and Unit Price Table.
.2 The components of the work are generally described as follows:a. Supply and install two (2) cast-in-place concrete abutments complete with steel
reinforcement, frost cushion and three (3) screw piles per each abutment with
minimal ground disturbance under original abutment footprint.
b. Design, Supply and install 18.0 m clear-span, pre-engineered prefabricated
aluminum bridge complete with sliding bearings, bearing plates, anchor bolts,
transition cover plates as designed by the bridge fabricator, aluminum dripthrough
decking, and railings as shown on the Contract Drawings. Shop drawings
shall be prepared, sealed, and signed by a Structural Engineer registered with
EGBC and submitted to ISL Engineering for review and approval prior to
fabrication.
c. Remove and dispose of existing wooden bridge and all related components.
d. The work site is primarily accessible by helicopter, with the staging area located
at the Upper Parking Lot of Saunders Day Use Area. Removal of the existing
bridge span and installation of the new bridge span, as well as transport of all
major materials and equipment, will be conducted by helicopter. Personnel and
limited small equipment may access the site via an existing 1.0 m wide
machine‑built access trail. Any impacted trails shall be reclaimed once
construction has been completed complete.
The lowest or any tender will not necessarily be accepted.
Schedule:
• Commence the Work: on or before the 5th day of October 2026.
• Substantial Performance: on or before the 23rd day of November 2026.
• Total Performance: on or before the 2nd day of December 2026.
the Kikomun Creek Provincial Park. In general, the work consists of the following:.1 The work of this Contract consists of the supply and installation of materials, including
all labour, equipment and tools related to the Surveyors Lake Bridge Replacement, all
in accordance with the drawings and specifications, and for the prices tendered in the
Schedule of Quantities and Unit Price Table.
.2 The components of the work are generally described as follows:a. Supply and install two (2) cast-in-place concrete abutments complete with steel
reinforcement, frost cushion and three (3) screw piles per each abutment with
minimal ground disturbance under original abutment footprint.
b. Design, Supply and install 18.0 m clear-span, pre-engineered prefabricated
aluminum bridge complete with sliding bearings, bearing plates, anchor bolts,
transition cover plates as designed by the bridge fabricator, aluminum dripthrough
decking, and railings as shown on the Contract Drawings. Shop drawings
shall be prepared, sealed, and signed by a Structural Engineer registered with
EGBC and submitted to ISL Engineering for review and approval prior to
fabrication.
c. Remove and dispose of existing wooden bridge and all related components.
d. The work site is primarily accessible by helicopter, with the staging area located
at the Upper Parking Lot of Saunders Day Use Area. Removal of the existing
bridge span and installation of the new bridge span, as well as transport of all
major materials and equipment, will be conducted by helicopter. Personnel and
limited small equipment may access the site via an existing 1.0 m wide
machine‑built access trail. Any impacted trails shall be reclaimed once
construction has been completed complete.
The lowest or any tender will not necessarily be accepted.
Schedule:
• Commence the Work: on or before the 5th day of October 2026.
• Substantial Performance: on or before the 23rd day of November 2026.
• Total Performance: on or before the 2nd day of December 2026.
Contract duration
The estimated contract period will be 5 month(s).
Trade agreements
-
Canadian Free Trade Agreement (CFTA)
-
Please refer to tender description or tender documents
Contact information
Contracting organization
- Organization
-
Ministry of Environment and Parks
- Address
-
Kikomun Creek Provincial Park, East Kootenay B, BC, CanadaEast Kootenay B, British Columbia, V0B 1T4Canada
- Email
- jkoshure@hotmail.com
- Address
-
Kikomun Creek Provincial Park, East Kootenay B, BC, CanadaEast Kootenay B, British Columbia, V0B 1T4Canada
Bidding details
Full details for this tender opportunity are available on a third-party site
Click on the button below to be directed to this website. Note that on the third-party site you may need an account to view and/or bid on this tender. Information on any fees or additional costs to access the full details is outlined in the Description tab of this tender opportunity.