Stage 2 - Sundance Canyon Loop Trail Bridge Repairs-Banff National Park, Alberta
Status Cancelled
Contract number 5P468-24-0220
Contract value :
Solicitation number 5P468-24-0220/A-001
Publication date
Contract award date
Last amendment date
Status Cancelled
Contract number 5P468-24-0220
Contract value :
Solicitation number 5P468-24-0220/A-001
Publication date
Contract award date
Last amendment date
5P468-24-0220/A Stage 2 - Sundance Canyon Loop Trail Bridge Repairs-Banff National Park, Alberta
*** Only qualified suppliers have been invited to bid.***
Potential and interested sub-contractors are invited to add their company’s name under the section “Partner with another business”.
REQUIREMENT
Parks Canada requires a contractor to complete repairs to a pedestrian trail bridge at ~km 4.7 on Sundance Canyon Loop Trial in Banff National Park, AB. Scope of work includes but is not limited to: bridge jacking and shoring, concrete abutment replacement & bearing replacement, timber repairs and guardrail repairs. The bridge is located on a hiking trail with no vehicle access and minimal laydown area. The nearest vehicle access via the existing trail is ~100m away at ~km 4.6, the contractor will have to utilize existing trails for access and laydown.
TWO STAGE SELECTION PROCESS
This posting is the Stage Two of a two-stage solicitation process: the first stage was to evaluate the qualifications of all interested suppliers. The second stage (Stage Two) is to invite the qualified suppliers to provide a financial bid on the project based on the specifications and drawings.
19402, 88 Ave
The contract will be for a period of 1 month(s), from 2025/06/17 to 2025/08/15.