Stage 2 - Construction of access roads and parking lots, Forillon National Park

Status Expired

Contract number 5P468-23-0114/A-001

Solicitation number 5P468-23-0114/A-001

Publication date

Contract award date

Last amendment date

Contract value

CAD 440,025.19

    Description
    This contract was awarded to:
    Transport Dupuis et Dupuis Inc.

    5P468-23-0114/A Stage 2 - Construction of access roads and parking lots, Forillon National Park

    REQUIREMENT

    Parks Canada is currently developing a conservation and improvement project in the Grande-Grave sector of Forillon National Park. The project aims to carry out priority restorations and to safeguard and improve several buildings of the Grande-Grave Heritage Site, which includes four houses: Elias-Gavey, Daniel-Gavey, Joseph-Gavey and Charles-Philip-Bartlett. The project's ultimate goal is to develop authentic accommodation in these heritage homes.

    To carry out this project, Parks Canada needs a contractor to build access roads and parking lots for the four heritage houses being restored as tourist accommodations. There are currently no access roads leading to the houses. These new access roads will initially be used by the teams carrying out the project, and then by future visitors who rent the homes.

    Parks Canada has already contracted a consulting engineering firm to plan, analyze and design the plans and specifications for the access road and parking lots for the Gavey and Bartlett housing developments, for which four houses will be restored as tourist accommodations. Now that this stage has been completed, Parks Canada is moving forward with building the access roads.

    Construction activities will generally include deforestation, excavation and earthworks (cut and fill), construction of access roads and revegetation (topsoil, seeding). The main features of the access roads are:

    • Gravel composition designed for passenger vehicles and maintenance vehicles (trucks);
    • Maximum total length of approx. 600 m;
    • One-way traffic, roadway width around 4 m, with widening in some places;
    • Maximum slopes around 25%;
    • Separate access for the Elias-Gavey house and a shared main road for the other houses, with entrances to each house.

    1. The work will be carried out at Forillon National Park in Quebec. The exact site is the side hill of the Grande-Grave Heritage Site, accessible via the South Sector road, less than 5 km from the entrance station. This is a very busy area for visitors to the park, open from early June to mid-October.

    2. The work covered by this contract includes, but is not limited to, supplying all materials, labour, tools and equipment for the complete construction of the access roads. Specifically, the project should include, but not be limited to, the following components:

    1.Coordination of the work schedule according to site occupancy.
    2.Supply and installation of all required environmental protection measures, including erosion and sediment control for this sloping site, to be maintained throughout the project and removed upon completion.
    3.Provision and maintenance of traffic and signage management and control for the duration of the project. The access road construction zone is located in an area where there are pedestrians, cyclists and motorists and where trails pass nearby.
    4.Transport and disposal of surplus materials (excavation residues) outside the park;
    5.Restoration of all impacted areas at the end of construction.
    6.Restoration of all off-road areas affected by construction.
    7.Keeping pavement inside the park clean and dust-free throughout the project.

    3. All work must be performed in accordance with applicable federal and provincial regulations for the agencies that have jurisdiction over the work. The work is subject to the National Parks Act and its regulations, the Canadian Environmental Protection Act, the Canada Labour Code and Québec's Act respecting occupational health and safety.

    TWO STAGE SELECTION PROCESS

    This posting is the Stage Two of a two-stage solicitation process: the first stage was to evaluate the qualifications of all interested suppliers. The second stage (Stage Two) is to invite the qualified suppliers to provide a financial bid on the project based on the specifications and drawings. Only qualified suppliers have been invited to bid.

    Business address

    501 boulevard Petit-Cap

    Gaspé, Quebec, G4X 4L1
    Canada
    Notice type
    Request for Proposal
    Procurement method
    Competitive - Traditional
    Language(s)
    English
    ,
    French
    Selection criteria
    Variations or combinations of the above methods
    Region(s) of delivery
    Canada

    Contract duration

    The contract will be for a period of 1 month(s), from 2023/09/28 to 2023/10/31.

    Commodity - UNSPSC

    • 72141000 - Highway and road construction services

    Trade agreements

    • Canadian Free Trade Agreement (CFTA)

    Reason for limited tendering

    A contracting officer can use limited tendering for specific reasons outlined in the applicable trade agreements. The reason for this contract is described below:

    • None
    Contact information

    Contracting organization

    Organization
    Parks Canada
    Address

    3 Passage du Chien-d'Or

    Québec , Québec , G1R 3Z8
    Canada
    Contracting authority
    Cloë Pelland Tessier
    Phone
    (418) 928-7252
    Email
    cloe.pelland-tessier@pc.gc.ca
    Fax
    1-855-983-1808
    Address
    Québec, Quebec, G1R 3Z8
    Canada
    Date modified: