Stage 2 - Halfway Brook Bridge Replacement, Cape Breton Highlands National Park
Status Awarded
Contract number 5P468-23-0142
Solicitation number 5P468-23-0142/A
Publication date
Contract award date
Contract value
Status Awarded
Contract number 5P468-23-0142
Solicitation number 5P468-23-0142/A
Publication date
Contract award date
Contract value
This contract was awarded to:
Parks Canada requires a contractor to provide construction services related to the replacement of Halfway Brook Bridge, an 18.7m single span concrete structure consisting of seven (7) AASHTO precast girders resting upon concrete abutments. The structure will be replaced with a new 42m, two lane, single span, twin trapezoidal steel box girder bridge, including the installation and removal of a temporary retaining structure to allow for new construction. The new concrete structure shall include a fully integral piled abutments and deck along with a new asphalt wearing surface.
10442 Highway 19
The contract will be for a period of 22 month(s), from 2023/09/05 to 2025/07/24.
CAD 11,466,063.50
A contracting officer can use limited tendering for specific reasons outlined in the applicable trade agreements. The reason for this contract is described below:
30 Victoria Street