Stage 2 - Parking Lot Construction, Cape Breton Highlands National Park
Status Expired
Contract number 5P468-23-0206
Solicitation number 5P468-23-0206/A
Publication date
Contract award date
Last amendment date
Contract value
Status Expired
Contract number 5P468-23-0206
Solicitation number 5P468-23-0206/A
Publication date
Contract award date
Last amendment date
Contract value
REQUIREMENT
The project will be carried out within the Cape Breton Highlands National Park (CBHNP) in Nova Scotia – generally in the vicinity of Ingonish. The project will involve the construction of new parking lot(s) and/or rehabilitation of existing parking lot(s).
It is anticipated that the work will include:
• The construction of one new paved parking lot with a capacity of approximately 45 to 50 vehicles (mix of cars, buses/RVs, and motorcycles).
• The rehabilitation of one existing paved parking lot with a capacity of approximately 40 vehicles (mix of cars and motorcycles).
• The rehabilitation of one existing unpaved parking lot with a capacity of approximately 12 vehicles (mix of cars and RVs).
The number of parking lots, and type and size of parking lot(s) is subject to change.
Generally, the construction is expected to include:
• Labour, plant, material, tools, construction machinery and equipment, water, heat, light, power, transportation and other facilities and services required to perform the work.
• Site preparation consisting of surveying, clearing and grubbing, excavation, cut and fill, grading, placement and compaction of aggregate coarses, and landscape reinstatement.
• Retaining wall construction.
• Ditch and rock lined dispersion apron construction
• Culvert supply and installation.
• Concrete work consisting of curbs / gutters, sidewalk and pads.
• Asphalt placement.
• Line and symbol painting on asphalt
• Provision of erosion and sediment control measures.
• Hard and soft landscaping and associated amenities such as bicycle rack.
• The work involves multiple activities and must be coordinated by a General Contractor. Furthermore, the General Contractor shall be responsible for Occupational Health and Safety on site including traffic control during construction.
645 Keltic Drive
The contract will be for a period of 8 month(s), from 2023/11/28 to 2024/08/16.
CAD 1,417,648.70
A contracting officer can use limited tendering for specific reasons outlined in the applicable trade agreements. The reason for this contract is described below:
30 Victoria Street