STRUCTURE REPLACEMENT WANIPIGOW DAM

Status Awarded

Solicitation number 7332

Publication date

Contract award date

Contract value

CAD 4,158,236.50

    Description

    This contract was awarded to:

    PCL Constructors Canada Inc.
    The replacement of the overflow dam consists of Concrete repairs to the existing concrete dam core followed by backfill entombment of the entire concrete dam core with riprap. Bedrock
    excavation for a new riparian channel and construction of a new concrete stoplog control structure located at the left abutment of the existing structure. Construction of abutment and
    wing walls at the new concrete control structure. Construction of a new concrete core wall extension located on the right-side of the existing structure. Post-tensioned anchoring of the
    new concrete control structure. Fabrication and installation of a new structural steel operation platform and hoist system. Fabrication and installation of wooden stoplogs and a permanent
    concrete bulkhead. Demolition is required for select existing structures.
    Business address
    1540 Gamble Place
    Winnipeg, Manitoba, R3T 1N6
    Canada
    Procurement method
    Competitive – Open Bidding
    Language(s)
    English

    Contract duration

    The contract will be for a period of 16 month(s), from 2023/03/17 to 2024/08/01.

    Trade agreements

    • Canadian Free Trade Agreement (CFTA)
    • Canada-European Union Comprehensive Economic and Trade Agreement (CETA)
    • Please refer to tender description or tender documents
    Contact information

    Contracting organization

    Organization
    Manitoba Infrastructure - Contract Services
    Address
    1630 215 Garry St
    Winnipeg, Manitoba, R3C 3P3
    Canada
    Contracting authority
    Kevin Sawatzky
    Phone
    204-803-1052
    Email
    kevin.sawatzky@gov.mb.ca