Culvert Installation - PTH 10

Status Awarded

Solicitation number 7357

Publication date

Contract award date

Contract value

CAD 1,255,550.63

    Description

    This contract was awarded to:

    Hodgson Construction Inc
    Section I: Bridge Site No. 7642-10 (Project ID F15194)
    Remove existing timber bridge and install three (3) corrugated steel pipe culverts with reinforced concrete headwalls by open trench cut in Rolling Drain under Municipal Road 93N, adjacent to PTH 10 located in the South East ¼ of sec. 20-16-18W, Municipality of Minto-Odanah, Bridge Site No. 7642-10.

    Section II: Bridge Site No. 7734-00 (Project ID F08000)
    Remove existing culverts and install three (3) corrugated steel pipe culverts with reinforced concrete headwalls on east access to PTH 10, North of Road 93N located in the South East ¼ of sec. 20-16-18W, Municipality of Minto-Odanah, Bridge Site No. 7734-00.
    Business address
    Box 907, Souris, MB R0K2C0
    Souris, Manitoba, R0K 2C0
    Canada
    Procurement method
    Competitive – Open Bidding
    Language(s)
    English

    Contract duration

    The contract will be for a period of 3 month(s), from 2023/07/26 to 2023/10/31.

    Trade agreements

    • Canadian Free Trade Agreement (CFTA)
    • Canada-European Union Comprehensive Economic and Trade Agreement (CETA)
    • Please refer to tender description or tender documents
    Contact information

    Contracting organization

    Organization
    Manitoba Infrastructure - Contract Services
    Address
    1630 215 Garry St
    Winnipeg, Manitoba, R3C 3P3
    Canada
    Contracting authority
    Kevin Sawatzky
    Phone
    204-803-1052
    Email
    kevin.sawatzky@gov.mb.ca
    Date modified: