CULVERT INSTALLATION OAK BLUFF DRAIN AT ROAD 50NE AND AT ROAD 6E RM OF MACDONALD

Status Awarded

Amendment value :

CAD 1,244,220.20

Solicitation number 7604

Publication date

Contract award date


    Description
    This contract was awarded to:
    Hugh Munro Construction Ltd.
    Drain Site No.1: (F31091)
    Remove existing 2 x 1520mm Ø 20.0 m long CSP and install three (3) new 2700mm Ø x 28.2m long CSP with concrete headwalls for N-07-09-2E on Road 50NE, at Oak Bluff Drain in the Rural Municipality of MacDonald.

    Drain Site No.2: (F31092)
    Remove existing 2 x 1530mm Ø 30.0 m long CSP and install three (3) new 2700mm Ø x 44.3m long CSP with concrete headwalls for W-18-09-2E on Road 6E at Oak Bluff Drain in the Rural Municipality of MacDonald.
     
    Business address
    8-3149 Red Fife Road
    Centreport, Manitoba, R4B 0A4
    Canada
    Procurement method
    Competitive – Open Bidding
    Language(s)
    English

    Contract duration

    The contract will be for a period of 2 month(s), from 2025/07/18 to 2025/09/21.

    Trade agreements

    • Canadian Free Trade Agreement (CFTA)
    • Canada-European Union Comprehensive Economic and Trade Agreement (CETA)
    • Comprehensive and Progressive Agreement for Trans-Pacific Partnership (CPTPP)
    • Please refer to tender description or tender documents
    Contact information

    Contracting organization

    Organization
    Manitoba Transportation and Infrastructure - Tendering and Contracts
    Address
    1630 215 Garry St
    Winnipeg, Manitoba, R3C 3P3
    Canada
    Contracting authority
    Allison Saniuk
    Phone
    431-279-3466
    Email
    Allison.Saniuk@gov.mb.ca