Gamelin Street Defragmentation and Naturalization – Phase 2
Status Awarded
Contract number 590388
Solicitation number AL1525
Publication date
Contract award date
Contract value
Status Awarded
Contract number 590388
Solicitation number AL1525
Publication date
Contract award date
Contract value
This contract was awarded to:
Work under this contract covers the work involved in the construction of a 385 metre long and 4.0 metre wide recreational pathway within Gamelin street limits in the city of Gatineau (Hull sector), between St-Raymond blvd and Promenade de la Gatineau. The work under this contract also covers the naturalization of the recreational pathway between St-Raymond blvd and des Fées street, and includes, but is not limited to, the following: .1 Erosion and sediment control .2 Vegetation and environmental protection .3 Excavation, backfilling and site grading including removal of contaminated material (i.e. excavated granular material and/or others, when required) .4 Stockpiling and reuse of acceptable topsoil material, as required .5 Supply and installation of a new bituminous concrete recreational pathway including his granular shoulder .6 Supply and installation of a new pedestrian pathway (in crushed granite particles) .7 Supply and installation of concrete curbs .8 Relocation of existing pathway signs on site .9 Supply and installation of signs and pavement markings .10 Supply and installation of a traffic lighting lamppost .11 Relocation of existing boulders on site .12 Supply and installation of new granite boulders .13 Supply and installation of imported topsoil (when required), as well as seed mixture, fertilizers and hydro mulch .14 Supply and installation of plant material, including maintenance during maintenance and warranty period (2 years) .15 Rehabilitation of disturbed areas
Refer to the description above for full details.