Kingsview Park Shoreline – Contaminated Soil Remediation
Status Awarded
Contract number 595443
Solicitation number AL1646
Publication date
Contract award date
Contract value
Status Awarded
Contract number 595443
Solicitation number AL1646
Publication date
Contract award date
Contract value
This contract was awarded to:
SCOPE OF WORK
.1 Work under this contract covers the work involved in the capping and protection from digging of a 640 metre long length of shoreline, on the east shore of the Rideau River, between St. Patrick Street and Montreal Road, Ottawa, Ontario and includes, but is not limited to, the following:
.1 Erosion and sediment control
.2 Floating silt curtain
.3 Temporary pathway detour
.4 Selective clearing of shrubs and saplings
.5 Salvaging and reinstating shoreline logs
.6 Filter layer
.7 Rip rap
.8 Large stones
.9 Topsoil and finish grading
.10 Seeding
Please ensure that you download your document from this site, in order to obtain all information related to the tender. It is your responsibility to ensure that you have received all the posted tender information to ensure tender compliance and not be disqualified.
Refer to the description above for full details.