Placing, Lifting/Removal, Maintaining and the Servicing of Seasonal Aids to Navigation on the Stuart Lake System
Status Awarded
Contract number F5211-170016
Solicitation number F5211-170016
Publication date
Contract award date
Contract value
Status Awarded
Contract number F5211-170016
Solicitation number F5211-170016
Publication date
Contract award date
Contract value
This contract was awarded to:
Title
Placing, Lifting/Removal, Maintaining and the Servicing of Seasonal Aids to Navigation on the Stuart Lake System
Contract Period
The Contract is for one year – April 1, 2017 to March 31, 2018 with the option to renew the contract for three (3) additional one year periods at the sole discretion of Fisheries and Oceans Canada (DFO)
Option periods if exercised will be April 1, 2018 through to March 31, 2019, April 1, 2019 through to March 31, 2020 and April 1, 2020 through to March 31, 2021.
Background
Fisheries and Oceans Canada (DFO), Canadian Coast Guard (CCG) maintains a Seasonal Aids to Navigation System, consisting of forty three (45) lighted and unlighted buoy; twelve (13) lighted and unlighted beacons and 72 pairs of unlighted ranges on the Stuart Lake System in Northern British Columbia. The buoys are deployed in May right after the ice recedes and are checked for correct position once a month until they are recovered and stored in October, shortly before freeze up. The beacons are left in place all year and are checked for correct operation once a month during the navigation season. In addition to these planned monthly checks; repairs and repositioning are done as required.
Objectives of the Requirement
The CCG, Aids to Navigation (AtoN) and Waterways establish aids to navigation that assist vessels to navigate safely through our waterways. The program benefits pleasure craft, fishing and commercial vessels, and ensures the public's right to navigate. CCG Marine Aids to Navigation is mandated to keep waters accessible by providing aids to navigation, developing waterways, and protecting navigable waters.
Background, Assumptions and Specific Scope of the Requirement
CCG is contracting out for the provision of placing, lifting/removal; maintaining and servicing of the following buoys/beacons as per the attached documents.
General Description of the Work:
Tasks, Activities, Deliverables and Milestones
At the beginning of each navigation season or as directed by the Supervisor AtoN, the Contractor must place the seasonal buoys on their advertised position and ensure that the characteristics displayed agree with those described in the “Technical data and Schedule of Rates for Buoys”. The Contractor must ensure the work is complete prior to the commencement of the navigation season for the local area and that the buoys remain in service until the end of the navigation season.
The Contractor must inspect each of the fixed aids covered by the contract monthly or more often as required to determine that it is functioning properly and that the characteristics displayed agree with those described in the “Technical Data and Schedule of Rates for Beacons”.