Rehabilitation of the Voyageur pathway – Flooding Damage
Status Awarded
Contract number PO-005618
Solicitation number AL1743
Publication date
Contract award date
Contract value
Status Awarded
Contract number PO-005618
Solicitation number AL1743
Publication date
Contract award date
Contract value
SCOPE OF WORK
.1 Works under this contract covers selective shoreline rehabilitation along the shoreline. This contract includes shoreline work, erosion control methods, removals of invasive plant material and grading.
To mitigate negative environmental effects on the terrestrial environment, equipment used at site for project construction should be limited to those with rubber tires (not tracks). Sedentary wildlife remaining at the site during construction should be humanely trapped and relocated; this may require permits and written permission by NCC Representative.
The work of this Contract includes, but is not limited to, the following:
1. Supply and installation silt curtain;
2. Safety Pruning
3. Relocation of existing boulders including granular base
4. Earth Excavation and hauling off site
5. Removal of exposed geotextile
6. Supply and installation of angular rip rap
7. Supply and installation of armour stone wall
8. Supply and installation of new geotextile
9. Supply and installation of backfill and Granular ‘A’
10. Supply and installation of asphalt and pavers
11. Pathway sink hole repair with infrastructure allocation
12. Supply and installation of concrete pad for site furniture
13. Supply and installation of site furniture
14. Relocation and installation of existing light standard
15. Contaminated soil conditions.
16. Supply and installation of topsoil and finish grading and compost tilling
17. Sod cutting
18. Supply and installation of plant material and cedar mulch
19. Supply and installation of seed and paper mulch
20. 2 year plant material warranty
21. Poured in place concrete wing walls
Refer to the description above for full details.