Highway 93S Culvert Replacement - Kootenay National Park
Status Awarded
Contract number 5P420-19-0026
Solicitation number 5P420-19-0026/A
Publication date
Contract award date
Contract value
Status Awarded
Contract number 5P420-19-0026
Solicitation number 5P420-19-0026/A
Publication date
Contract award date
Contract value
This contract was awarded to:
Requirement:
The project work consists of a culvert replacement at km 17.0 which includes excavation, removal, and disposal of the existing 65m Corrugated Steel Pipe Arch (CSPA) culvert and associated road and parking lot (Day Use Area) infrastructure. The work also includes the supply and installation of a new Precast Concrete Box Culvert (PCBC) with an offset to the south of the current alignment underneath Hwy 93S and the Marble Canyon DUA, construction of a temporary detour to accommodate traffic and coordination the relocation of utility lines, and slope stability measures at km 17.2 along the river bank.
See specifications and drawings for further details on the requirement of this project.
To assist with bonding and insurance requirements, this project is estimated at a value between $1,000,001 > $5,000,000, Taxes extra.
Period of Contract:
The Contractor shall perform and complete all onsite Work by October 15, 2019
Refer to the description above for full details.