The scope of work for this project consists of the furnishing of all plant, labour, equipment and material for wharf repairs at Port aux Basques, NL in strict accordance with specifications and accompanying drawings and subject to all terms and conditions of the Contract.
In general, the work under this contract will consist of, but will not necessarily be limited to, the following:
.1 Partial or total demolition and removal of wheelguards, coping and fenders, as detailed on drawings.
.2 Replacement of the horizontal and vertical wood fenders, as indicated on drawings.
.3 Replacement of coping along the wharf structure.
.4 Replace and repair existing wheelguards, as noted on drawings.
.5 Partial replacement of existing concrete deck, as indicated on drawings.
.6 Partial replacement of existing asphalt surfaces, as detailed on drawings.
.7 Installation of new tire bumpers, as detailed on drawings.
FAMILIARIZATION WITH SITE
Before submitting a bid, bidders can visit the site and its surroundings, at their own expense, to review and verify the form, nature, and extent of the work, materials needed for the completion of the work, the means of access to the site, severity, exposure, and uncertainty of weather, soil conditions, any accommodations they may require, and in general shall obtain all necessary information as to risks, contingencies, and other circumstances which may influence or affect their bid. No allowance shall be made subsequently in this connection on account or error or negligence to properly observe and determine the conditions that will apply.
Contractors, bidders, or those they invite to site are to review specification Section 01 35 29 – Health and Safety Requirements before visiting site. Take all appropriate safety measures for any visit to site, either before or after acceptance of bid.
Refer to the description above for full details.