Launchway and Breakwater Construction - North Harbour, St, Mary’s Bay, NL
Status Awarded
Contract number F5211-190317
Solicitation number F5211-190317
Publication date
Contract award date
Contract value
Status Awarded
Contract number F5211-190317
Solicitation number F5211-190317
Publication date
Contract award date
Contract value
This contract was awarded to:
DELIVERABLES / SCOPE OF WORK
Launchway and Breakwater Construction, North Harbour, St, Mary’s Bay, NL
The scope of work for this project consists of the furnishing of all plant, labour, equipment and material for launchway and breakwater construction at North Harbour, St. Mary’s Bay, NL in strict accordance with specifications and accompanying drawings and subject to all terms and conditions of the Contract.
In general, the work under this contract will consist of, but will not necessarily be limited to, the following:
.1 Construction of timber cribwork with associated rock ballast, wheelguard and wheelguard blocking.
.2 Supply and installation of precast concrete boat launch panels.
.3 Supply and placement of Class “A’ granular material and quarried core stone, filter stone and armour stone of sizes indicated on drawings.
.4 Construction of rubble mound breakwater.
.5 Removal of existing boat, utility pole and guard rail and the relocation of an existing shed.
.6 Construction of reinforced concrete slab-on-grade foundation for relocated shed.
FAMILIARIZATION WITH SITE
Before submitting a bid, bidders can visit the site and its surroundings, at their own expense, to review and verify the form, nature, and extent of the work, materials needed for the completion of the work, the means of access to the site, severity, exposure, and uncertainty of weather, soil conditions, any accommodations they may require, and in general shall obtain all necessary information as to risks, contingencies, and other circumstances which may influence or affect their bid. No allowance shall be made subsequently in this connection on account or error or negligence to properly observe and determine the conditions that will apply.
Contractors, bidders, or those they invite to site are to review specification Section 01 35 28 – Health and Safety Requirements before visiting site. Take all appropriate safety measures for any visit to site, either before or after acceptance of bid.
Refer to the description above for full details.