Launchway Construction - Coomb's Cove, NL
Status Awarded
Contract number F5211-190363
Solicitation number F5211-190363
Publication date
Contract award date
Contract value
Status Awarded
Contract number F5211-190363
Solicitation number F5211-190363
Publication date
Contract award date
Contract value
This contract was awarded to:
DELIVERABLES / SCOPE OF WORK
The work covered under this contract consists of the furnishing of all plant, labour, equipment, and material for Launchway Construction at Coomb’s Cove, NL, in strict accordance with the specifications and accompanying drawings and subject to all terms and conditions of the contract.
In general, work under this contract will consist of but will not necessarily be limited to the following:
• Demolition of the existing wharf, as noted on the drawings.
• Dredging and excavation to limits as indicated on drawings.
• Construction of one (1) new treated timber crib, to the dimensions as indicated on the drawings, founded on rock mattress.
• Supply and installation of rock fill for new launchway topped with pre-cast concrete panels.
• Construction of an armour stone groyne including geotextile, geogrid, core stone, filter stone, and armour stone, as indicated on the drawings.
FAMILIARIZATION WITH SITE
Before submitting a bid, bidders can visit the site and its surroundings, at their own expense and schedule, to review and verify the form, nature, and extent of the work, materials needed for the completion of the work, the means of access to the site, severity, exposure and uncertainty of weather, soil conditions, any accommodations they may require, and in general shall obtain all necessary information as to risks, contingencies and other circumstances which may influence or affect their bid. No allowance shall be made subsequently in this connection on account or error or negligence to properly observe and determine the conditions that will apply.
Contractors, bidders, or those they invite to site are to review specification section on Health and Safety before visiting site. Take all appropriate safety measures for any visit to site, either before or after acceptance of bid.
Refer to the description above for full details.