Wharf Repair - L’Anse au Clair and L’Anse au Loup, NL
Status Awarded
Contract number F5211-190366
Solicitation number F5211-190366
Publication date
Contract award date
Contract value
Status Awarded
Contract number F5211-190366
Solicitation number F5211-190366
Publication date
Contract award date
Contract value
This contract was awarded to:
The scope of work for this project consists of the furnishing of all plant, labour, equipment and material for wharf repairs at L’Anse au Clair and L’Anse au Loup, NL in strict accordance with specifications and accompanying drawings and subject to all terms and conditions of the Contract.
In general, the work under this contract will consist of, but will not necessarily be limited to, the following:
.1 Demolition and disposal of existing wharf deck and existing crib at L’Anse au Clair. Installation of two (2) cribs c/w reinforced concrete deck, cleats, ladders, wheelguard, blocking, coping and new fenders, as indicated on drawings.
.2 Demolition, removal and disposal of partial concrete deck at L’Anse au Loup and replace with new 250mm thick reinforced concrete wharf deck as noted on drawings.
.3 Partial replacement of existing concrete deck at L’Anse au Clair as detailed on drawings.
.4 Partial replacement of existing concrete apron at L’Anse au Clair as noted on drawings.
.5 Partial to total demolition, removal and replacement of wheelguards, coping, fenders and ladders for both L’Anse au Clair and L’Anse au Loup, as indicated on drawings.
FAMILIARIZATION WITH SITE
Before submitting a bid, bidders can visit the site and its surroundings, at their own expense, to review and verify the form, nature, and extent of the work, materials needed for the completion of the work, the means of access to the site, severity, exposure, and uncertainty of weather, soil conditions, any accommodations they may require, and in general shall obtain all necessary information as to risks, contingencies, and other circumstances which may influence or affect their bid. No allowance shall be made subsequently in this connection on account or error or negligence to properly observe and determine the conditions that will apply.
Contractors, bidders, or those they invite to site are to review specification Section 01 35 29 – Health and Safety Requirements before visiting site. Take all appropriate safety measures for any visit to site, either before or after acceptance of bid.
Refer to the description above for full details.