*UPDATED PRICE TABLE* MAINTENANCE DREDGING WITH FLOATING PLANT
Status Awarded
Contract number F5211-200303
Solicitation number F5211-200303
Publication date
Contract award date
Contract value
Status Awarded
Contract number F5211-200303
Solicitation number F5211-200303
Publication date
Contract award date
Contract value
This contract was awarded to:
The work consists of dredging the Rivière-au-Tonnerre harbor on the North Shore of the province of Quebec.
The volume to be dredged is approximately 6,000 m3 measured in place.
The temporary land deposit site for sediment dewatering is located near the Rivière-au-Tonnerre wharf.
The land disposal site for the final disposal of materials is located at a maximum distance of ten (10) kilometers from the temporary disposal site.
The dredging must be carried out by floating equipment.
As an indication, the material to be dredged mainly consists of sand and gravel.
The contract could run between September 2020 and the end of March 2021.
Refer to the description above for full details.