The scope of work for this project consists of the furnishing of all plant, labour, equipment and material for Harbour Repairs, in King’s Cove, NL in strict accordance with specifications and accompanying drawings and subject to all terms and conditions of the Contract.
In general, the work under this contract will consist of, but will not necessarily be limited to, the following:
.1 Demolition and removal of the existing concrete launchway, existing asphalt and concrete deck overhang on marginal wharf. Clean-up of scattered boulders around the site and reshaping of the uplands, including washed out areas along the marginal wharf and the approach to the finger pier, as noted on the drawings.
.2 Construction of a new concrete launchway, complete with toe crib, to the dimensions indicated on the drawings.
.3 Asphalt paving and construction of a new uplands concrete slab on grade (supported by granular material), as noted on the drawings.
.4 Supply and installation of new treated timber cribwork, a portion of which is concrete ballasted, at the approach to the finger pier
.5 Encasement in concrete of existing conduit to provide protection for existing electrical service, as shown on the drawings.
.6 Supply and installation of rock fill core, filter stone and armour stone, as noted on the drawings.
FAMILIARIZATION WITH SITE
Before submitting a bid, bidders can visit the site and its surroundings, at their own expense, to review and verify the form, nature, and extent of the work, materials needed for the completion of the work, the means of access to the site, severity, exposure, and uncertainty of weather, soil conditions, any accommodations they may require, and in general shall obtain all necessary information as to risks, contingencies, and other circumstances which may influence or affect their bid. No allowance shall be made subsequently in this connection on account or error or negligence to properly observe and determine the conditions that will apply.
Contractors, bidders, or those they invite to site are to review specification Section 01 35 29 – Health and Safety Requirements before visiting site. Take all appropriate safety measures for any visit to site, either before or after acceptance of bid.
Refer to the description above for full details.