SAP Fieldglass system maintenance

SAP Fieldglass will be unavailable for scheduled maintenance at the times listed below. We apologize for any inconvenience.  

  • Friday, November 1 from 7:00 pm until Monday, November 4 8:00 am (EDT) 

Construction of one (1) equipment shelter and one (1) generator building

Status Awarded

Contract number FP802-200292

Solicitation number FP802-200292

Publication date

Contract award date


    Description

    This contract was awarded to:

    84653 Newfoundland and Labrador Inc.

    Construction of One (1) Equipment Trailer and One (1) Generator Building

    MCTS Site: St. Lawrence, Newfoundland & Labrador

    Nature of Work:

    The work covered under this project consists of all architectural, structural, mechanical and electrical work to facilitate the installation of new equipment and generator shelters for the Canadian Coast Guard.

    .1Contract consists of construction of one (1) 9.75m x 3.7m equipment shelter, and one (1) 4.27m x 4.27m generator building as per these specifications and drawings.

    .2The supply and installation of all mechanical and electrical equipment/systems, as indicated on the contract drawings and more particularly, specified herein.

    .3The supply and installation of foundations as indicated on the contract drawings.

    .4Site preparation, including site grading; services, etc. as indicated on the contract drawings.

    .5The contractor is responsible for the testing of all systems in presence of Coast Guard personnel at delivery and a report of the testing results to be delivered to owner no later than ten (10) working days after completion of all the testing. Testing shall include but not be limited to:

    .1Ventilation System

    .2Lighting

    .3Heating System

    .4All alarm points back to alarm cabinet

    .5Verification of electrical circuit designations

    .6Verification of documentation

    .7Physical inspection of equipment shelters

    .6 Documentation on the system and subsystem is to be provided by the contractor. This shall include but not limited to:

    .1Complete set of as-built drawings.

    .2 A complete maintenance manual indicating required maintenance for all installed components, schedule and parts list.

    .3A complete report on all system testing.

    .7The work included in this contract is specified in the format of general specification document with specific works identified on drawings. The contractor remains responsible for the appropriation of the work between the trade, contractors, his own forces and suppliers. The Engineer will not be responsible for determination of or for providing opinion on the scope of work split between sub-contractors and trade jurisdictions.

    Location of Work:

    St Lawrence VHF Site

    St Lawrence, Newfoundland and Labrador

    Latitude: 46º 55’ 08" North

    Longitude: 55º 22’ 44" West

    Start Date:

    Two (2) weeks after Contract Award.

    Completion Date:

    40% completion by March 31, 2021.

    Final completion by July 16, 2021.

    Business address
    143 River Road, Box 60, Site 4
    Appleton,
    NL
    Procurement method
    Competitive – Open Bidding
    Language(s)
    English
    ,
    French

    Contract duration

    Refer to the description above for full details.

    Commodity - GSIN

    • 5129B - Construction of Other Buildings
    • 5151A - Foundation Work
    • 5159B - Other Special Trade Construction Work
    • 5139A - Construction Services, Not Elsewhere Specified
    Contact information

    Contracting organization

    Organization
    Fisheries and Oceans Canada
    Address
    200 Kent St, Station 13E228
    Ottawa, Ontario, K1A 0E6
    Canada
    Contracting authority
    Aliaga, Ginette
    Phone
    343-540-9331
    Address
    Fisheries and Oceans Canada
    200 Kent Street
    Ottawa, ON, K1A 0E6
    Canada

    Buying organization(s)

    Organization
    Fisheries and Oceans Canada
    Address
    200 Kent St, Station 13E228
    Ottawa, Ontario, K1A 0E6
    Canada
    Date modified: