.1 Work of this Contract comprises the furnishing of all plant, labour, equipment, and material for Berth 30 and 31 Repairs at the Coast Guard Base in St. John’s, NL in strict accordance with specifications and accompanying drawings and subject to all terms and conditions of the contract.
.1 The work will consist of but will not necessarily be limited to the following:
.1 Excavation to the limits as indicated on the drawings.
.2 Installation of a new timber crib, and modifications to an existing timber crib.
.3 Placement and compaction of backfill.
.4 Installation of new slab-on-grade and asphalt.
.5 Inspection of sewer as indicated on the drawings.
.6 Demolition and reinstatement of existing concrete trench.
.7 Removal and disposal of existing steel ladders.
.8 Cutting off of existing metal protrusions at the west face of Berth 31.
.9 Supply and installation of new timber ladder.
.10 Supply and installation of new temporary wheelguard gap filler.
.11 Cutting off of existing platform anchor bolts and installation of new platform anchor bolts.
Refer to the description above for full details.