Matane – Floating Docks Repair
Status Awarded
Contract number 4500041069
Solicitation number 30003854
Publication date
Contract award date
Contract value
Status Awarded
Contract number 4500041069
Solicitation number 30003854
Publication date
Contract award date
Contract value
The floating docks repair at Matane fishing harbour in the Gaspesia Peninsula includes, but is not limited to, clearing snow and ice from the 16 floating docks stored in the harbour, loading and transporting floating docks to a workshop, picking up material supplied by DFO at the Gascons-Chapados warehouse and providing the materials, labour and equipment to carry out the repair work outlined in drawings and specifications.
Duration of contract: The services of the Contractor shall begin after contract award. The expected completion date of this project is April 30th, 2023.
Refer to the description above for full details.