City of Lethbridge - Negotiated Request for Proposal - 2025 Construction of Concrete Sidewalks, Curbs, Gutters & Driveway Crossings
Solicitation number AB-2025-01269
Publication date
Closing date and time 2025/03/13 10:00 EDT
Last amendment date
Description
The sidewalk maintenance program was instituted to improve the condition of surfaces on sidewalks throughout the city network. To ensure public safety and reduce the possibility of claims against the City of Lethbridge.
Scope
To construct concrete sidewalks, curbs, gutters, driveway crossings, mobility ramps and utility piece repairs at various locations throughout the City of Lethbridge. To provide sidewalk grinding, mud-jacking and paving stone maintenance.
Please note the following in regards to item # 22 (High/Early Fibre Concrete) on Schedule 1 – Pricing – COL-25-29:
• To be consistent with Section 05220 of the City of Lethbridge Specifications
• Minimum 25 MPA for 48 hour compressive strength
• BASF MasterFiber (or equivalent) @ 3kg/m ³
• Colour to be Beige as per (included) concrete sidewalk detail
• “Beige” additive to be BN-1701R Taupe (1 Bag), as manufactured
Contract duration
The estimated contract period will be 12 month(s), with a proposed start date of 2025/03/31.
Trade agreements
-
Canadian Free Trade Agreement (CFTA)
Contact information
Contracting organization
- Organization
-
City of Lethbridge
- Address
-
910-4th Ave SLethbridge, CA-AB, T1J 0P6CA
- Contracting authority
- Brendan Harper
- Email
- brendan.harper@lethbridge.ca
- Address
-
910 4th Ave SLethbridge, CA-AB, T1J 0P6CA
Bidding details
Full details for this tender opportunity are available on a third-party site