City of Calgary - Request for Proposal - RFP 26-1580 Ramsay Elevated Guideway
Solicitation number AB-2026-05014
Publication date
Closing date and time 2026/09/10 10:00 EDT
Description
Overview of the Project
The planned Ramsay Elevated Guideway construction package including
elevated rail structure between the Ramsay/Inglewood Station at
approximately 11th Street (STA: 116+450) to the 26 Avenue Station (STA:
117+275). It includes civil and structural works, including but not limited
to piling, piers, approach slabs and deck for the construction of the
elevated guideway. The scope extends to earthworks, utilities, duct
banks, cable containment, OCS foundations, roadworks and multi-use
pathways, and construction management functions.
Further to the overview the scope of work comprises but not limited to the
following:
Priority Package Interface (Blackfoot Trail LRT Bridge)
a) Interfaces with Priority Package - Blackfoot Trail LRT Bridge in
between (STA IB 116+060 to 116+160).
Site Works
a) Site preparation, stripping, cut/fill, stabilization, and support of
excavation as required to enable the construction of the Works.
b) All final grading, associated landscaping works and site servicing.
c) All temporary access roads, traffic control measures and permanent
roads
d) Temporary servicing, drainage, stormwater management, and
dewatering.
e) Removal/storage/reinstatement of City street furniture.
f) Removal/relocation of any infrastructure in conflict with the Works.
g) Site preparation for transfer to Track Contractor.
Civil Works – Elevated Guideway
a) All elevated guideway works including but not limited to, piling, piers,
abutments, wingwalls, girders, deck, barriers, plinth pockets, safety
railing and deck anchorage for overhead catenary system (OCS).
b) All required elevated guideway drainage infrastructure as required.
c) Drainage infrastructure and tie-ins.
d) All infrastructure including anchors and dowels for plinths if required
to tie in with the track structure.
e) All required electrical isolation, grounding and bonding work.
f) All low voltage electrical lighting fixtures, conduits and tie-in.
g) All fire & life safety pipes, valves & appurtenances, testing &
commissioning.
Project-Wide Works
a) Design and implementation of all Temporary Works.
b) Field review, monitoring, and reporting for Temporary Works.
c) Support of excavation.
d) Laydown areas and traffic management.
e) Construction noise and vibration mitigation.
f) Environmental mitigation protection measures.
Interfaces with other Construction packages
a) Ramsay/Inglewood Station: Two stations, guideway, utilities buildings,
MSE / secant pile wall, MUPs, and roadworks.
b) Communications & Traction Power Systems (wayside).
c) Signaling & Train Control Systems.
d) Trackwork above sub-ballast.
Contract duration
The estimated contract period will be 24 month(s), with a proposed start date of 2026/09/29.
Trade agreements
-
Canada-European Union Comprehensive Economic and Trade Agreement (CETA)
Contact information
Contracting organization
- Organization
-
City of Calgary
- Address
-
677-25 Ave SECalgary, CA-AB, T2G 4K8CA
- Contracting authority
- Ujjain Repaka
- Email
- ujjain.repaka@calgary.ca
- Address
-
677-25 Ave SECalgary, Alberta, T2G 4K8Canada
Bidding details
Full details for this tender opportunity are available on a third-party site
Click on the button below to be directed to this website. Note that on the third-party site you may need an account to view and/or bid on this tender. Information on any fees or additional costs to access the full details is outlined in the Description tab of this tender opportunity.