Invitation to Bid 230525-20 Boiler Upgrade - Blueridge Elementary School
Solicitation number BC170748
Publication date
Closing date and time 2023/06/26 17:00 EDT
Description
The Board of Education of School District No. 44 (North Vancouver) (the “Owner”) is requesting bids from contractors
with a proven record of performance and experience in the type, kind, quality of work required by this document for the
Boiler Upgrade Project at Blueridge Elementary.
The new upgrade work will include all associated general, electrical and controls. The existing boilers, boiler venting,
wiring (power and controls), piping (hydronic, gas, and condensate) and zone circulating pumps are being replaced with
three high-efficiency condensing boilers as well as new zone circulating pumps (with integrated frequency converters).
Existing controls will be modified to work with the new boilers and pumps and the boiler control sequence updated to
account for the new heating plant configuration. Also included in the upgrade work is the new ventilation system for the
existing kiln which is also located in the Boiler Room. The Contractor shall also clean, make good, and paint the Boiler
Room floor in all areas where equipment (including existing concrete housekeeping pads) are removed. Additionally,the
Contractor shall provide a new concrete housekeeping pad for the new expansion tank.
with a proven record of performance and experience in the type, kind, quality of work required by this document for the
Boiler Upgrade Project at Blueridge Elementary.
The new upgrade work will include all associated general, electrical and controls. The existing boilers, boiler venting,
wiring (power and controls), piping (hydronic, gas, and condensate) and zone circulating pumps are being replaced with
three high-efficiency condensing boilers as well as new zone circulating pumps (with integrated frequency converters).
Existing controls will be modified to work with the new boilers and pumps and the boiler control sequence updated to
account for the new heating plant configuration. Also included in the upgrade work is the new ventilation system for the
existing kiln which is also located in the Boiler Room. The Contractor shall also clean, make good, and paint the Boiler
Room floor in all areas where equipment (including existing concrete housekeeping pads) are removed. Additionally,the
Contractor shall provide a new concrete housekeeping pad for the new expansion tank.
Contract duration
Refer to the description above for full details.
Trade agreements
-
Please refer to tender description or tender documents
Contact information
Contracting organization
- Organization
-
School District 44 North Vancouver
- Email
- purchasing@sd44.ca
Bidding details
Full details for this tender opportunity are available on a third-party site
Click on the button below to be directed to this website. Note that on the third-party site you may need an account to view and/or bid on this tender. Information on any fees or additional costs to access the full details is outlined in the Description tab of this tender opportunity.