Tk'emlups te Secwepemc Paul Lake Dam Spillway Upgrade
Solicitation number 176451
Publication date
Closing date and time 2023/08/25 18:00 EDT
Description
To improve the existing spillway capacity requires construction of an opening across the full width of the existing dam crest, which when combined with the existing CMP spillway culverts will be able to flow the upgraded spillway flow required by the new Dam Safety Regulations, basically a concrete bridge or a box culvert structure which will carry full highway traffic loading as the dam provides an embankment whose crest serves as part of a Provincial Highway which has to be kept continuously open for public vehicle and pedestrian traffic. To be able to maintain traffic, construction of the additional spillway capacity necessitates doing the work in five stages.
Contract duration
The estimated contract period will be 2 month(s).
Trade agreements
-
Please refer to tender description or tender documents
Contact information
Contracting organization
- Organization
-
Regional, Municipal, Indigenous governments
- Address
-
760 Seymour StKamloops, British Columbia, V2C 2H3Canada
- Email
- watson@direct.ca
- Address
-
760 Seymour StKamloops, British Columbia,Canada
Bidding details
Full details for this tender opportunity are available on a third-party site
Click on the button below to be directed to this website. Note that on the third-party site you may need an account to view and/or bid on this tender. Information on any fees or additional costs to access the full details is outlined in the Description tab of this tender opportunity.