Header Pipe Replacement Project

Solicitation number BC192495

Publication date

Closing date and time 2024/04/05 16:41 EDT


    Description
    It is the intent of this specification to provide installation of a new Header Pipe in our Ice Centre.

    This consists of the existing cool floor and warm floor brine charge to be removed from system prior to header demolition. Brine is to be stored onsite at contractor’s expense. The District of Taylor will provide secure storage location. The existing headers and supports to need to be removed and disposed of. New painted steel header brackets to be installed inside header trench every 10’ and at ends as required. The overall length of this project is 92 ft. The new headers to be connected to existing rink piping with flexible hoses, nylon barbed connectors and SS gear clamps. All joints must receive 2x gear clamps per side. System to be pressure tested as 50 PSI with compressed air for 24 hours prior to recharging with brine. Air to be purged during brine charging to ensure system is ready to service.

    Contract duration

    Refer to the description above for full details.

    Trade agreements

    • Please refer to tender description or tender documents
    Contact information

    Contracting organization

    Organization
    District of Taylor
    Contracting authority
    Kimberly Westgate
    Email
    kwestgate@districtoftaylor.com
    Bidding details

    Full details for this tender opportunity are available on a third-party site

    Click on the button below to be directed to this website. Note that on the third-party site you may need an account to view and/or bid on this tender. Information on any fees or additional costs to access the full details is outlined in the Description tab of this tender opportunity.

    Summary information

    Notice type
    Other
    Language(s)
    English