Cluster C Wastewater Treatment Plant
Solicitation number BC346-382-01
Publication date
Closing date and time 2026/06/04 17:00 EDT
Description
The District of Barriere (Owner) invites Proposals, through this Negotiated Request for Proposal
(NRFP), from Proponents for the Cluster C Wastewater Treatment Plant project.
The Proponent is to include the following work that represents a base Proposal:
• Construct Pre-EQ, Post-EQ, SBR Concrete Tanks
• Constructing filtration building c/w interior framing, equipment, pluming, and electrical
• Install owner supplied equipment
• Construct control structure for discharge to infiltration trenches
• Modify existing piping within LS2 with new pumps
• Modify existing piping within headworks building
• Install pre-cast valve chambers
• Process, air and yard piping
• Electrical works c/w new MCC, transformer, panel, PLC and automatic transfer switch,
generator c/w power and control wiring.
• Iterative disinfection of existing forcemain’
• Excavation, backfill, final grading, and paving
In addition to responding to the base Proposal, the Proponent is invited to propose any
innovations that the Proponent believes will reduce the cost of the Project, improve the
constructability of the Project, or improve the performance of the facility. The intent is for the
Proponent to use their knowledge of construction practices to improve the overall Project by
shortening the construction time frame and reducing the overall Project cost.
ActivityDate NRFP release.May 8th, 2026 Optional Site Meeting, 9:00am Pacific Standard Time.May 20th, 2026 Last date for written inquiries, 2:00pm, Pacific Standard Time.June 1st, 2026 NRFP closing time, 2:00pm Pacific Standard Time.June 4th, 2026 Expected Preferred Proponent selection and commencement of any negotiations leading to a completed agreement.June 29th, 2026 Earliest Contract Award (Expected Date of Work commencement (on or after).July 15th, 2026
(NRFP), from Proponents for the Cluster C Wastewater Treatment Plant project.
The Proponent is to include the following work that represents a base Proposal:
• Construct Pre-EQ, Post-EQ, SBR Concrete Tanks
• Constructing filtration building c/w interior framing, equipment, pluming, and electrical
• Install owner supplied equipment
• Construct control structure for discharge to infiltration trenches
• Modify existing piping within LS2 with new pumps
• Modify existing piping within headworks building
• Install pre-cast valve chambers
• Process, air and yard piping
• Electrical works c/w new MCC, transformer, panel, PLC and automatic transfer switch,
generator c/w power and control wiring.
• Iterative disinfection of existing forcemain’
• Excavation, backfill, final grading, and paving
In addition to responding to the base Proposal, the Proponent is invited to propose any
innovations that the Proponent believes will reduce the cost of the Project, improve the
constructability of the Project, or improve the performance of the facility. The intent is for the
Proponent to use their knowledge of construction practices to improve the overall Project by
shortening the construction time frame and reducing the overall Project cost.
Contract duration
Refer to the description above for full details.
Trade agreements
-
Please refer to tender description or tender documents
Contact information
Contracting organization
- Organization
-
District of Barriere
- Address
-
4936 Barriere Town RdBarrière, British Columbia, V0E 1E1Canada
- Email
- jcollyer@true.bc.ca
- Address
-
4936 Barriere Town RdBarrière, British Columbia, V0E 1E1Canada
Bidding details
Full details for this tender opportunity are available on a third-party site
Click on the button below to be directed to this website. Note that on the third-party site you may need an account to view and/or bid on this tender. Information on any fees or additional costs to access the full details is outlined in the Description tab of this tender opportunity.