SSI 2022-013 Centennial Park Revitalization
Solicitation number 8596
Publication date
Closing date and time 2022/11/04 17:16 EDT
Description
SSI 2022-013 Centennial Park Revitalization
The works to be constructed under this Contract generally include, but is not limited to, the following:
The removal and replacement of the existing Centennial Park concrete and brick paver plaza in Ganges, Saltspring Island BC. New works include the replacement of approximately 1275 square meters of sand blast patterned cast in place wire mesh reinforced concrete, updates to the on-site drainage, lighting, landscaping and furnishings as well as approximately 56 m of new concrete curb and gutter on the NW and SW limits of the plaza. The existing curb and brick sidewalk on Fulford-Ganges Road and the planters and trees that border and occur within the plaza will be retained.
Closing Date: Monday, November 28th, 2022 at 2 PM
Optional Pre-tender Site Meeting: Wednesday November 9th at 10 AM at Centennial Park
For information and/or enquiries on this project please contact please contact Dan Ovington, Manager Salt Spring Island Parks and Recreation.
Dan Ovington, Manager Salt Spring Island Parks and Recreation
Salt Spring Island Electoral Area
108 – 121 McPhillips Avenue
Salt Spring Island, BC V8K 2T6
Tel: 250.537.4448
Fax: 250.537.4456
Email: dovington@crd.bc.ca
The works to be constructed under this Contract generally include, but is not limited to, the following:
The removal and replacement of the existing Centennial Park concrete and brick paver plaza in Ganges, Saltspring Island BC. New works include the replacement of approximately 1275 square meters of sand blast patterned cast in place wire mesh reinforced concrete, updates to the on-site drainage, lighting, landscaping and furnishings as well as approximately 56 m of new concrete curb and gutter on the NW and SW limits of the plaza. The existing curb and brick sidewalk on Fulford-Ganges Road and the planters and trees that border and occur within the plaza will be retained.
Closing Date: Monday, November 28th, 2022 at 2 PM
Optional Pre-tender Site Meeting: Wednesday November 9th at 10 AM at Centennial Park
For information and/or enquiries on this project please contact please contact Dan Ovington, Manager Salt Spring Island Parks and Recreation.
Dan Ovington, Manager Salt Spring Island Parks and Recreation
Salt Spring Island Electoral Area
108 – 121 McPhillips Avenue
Salt Spring Island, BC V8K 2T6
Tel: 250.537.4448
Fax: 250.537.4456
Email: dovington@crd.bc.ca
Contract duration
Refer to the description above for full details.
Trade agreements
-
Please refer to tender description or tender documents
Contact information
Contracting organization
- Organization
-
Capital Regional District
- Address
-
181 McPhillips AveSalt Spring Island, British Columbia, V8K 2V8Canada
- Email
- dovington@crd.bc.ca
- Address
-
181 McPhillips AveSalt Spring Island, British Columbia,Canada
Bidding details
Full details for this tender opportunity are available on a third-party site
Click on the button below to be directed to this website. Note that on the third-party site you may need an account to view and/or bid on this tender. Information on any fees or additional costs to access the full details is outlined in the Description tab of this tender opportunity.