Stage 2 - Lake Audy Road Crossing Replacements - Riding Mountain National Park
Solicitation number 5P468-23-0049/A
Publication date
Closing date and time 2023/06/02 16:00 EDT
Last amendment date
Description
5P468-23-0049/A Stage 2 - Lake Audy Road Crossing Replacements- Riding Mountain National Park
REQUIREMENT
Parks Canada Agency requires the reconstruction of the Lake Audy Road Crossings over Jackfish Creek at Km 18 and 26 in Riding Mountain National Park. The crossings are to consist of corrugated plate arch structures with concrete footings on each side of the channel to ensure proper seating of the arch structure. Erosion protection, allowing for continued water flow during construction and protection of aquatic habitat are required.
TWO STAGE SELECTION PROCESS
This posting is the Stage Two of a two-stage solicitation process: the first stage was to evaluate the qualifications of all interested suppliers. The second stage (Stage Two) is to invite the qualified suppliers to submit an Indigenous Benefits Plan and provide a financial bid on the project based on the specifications and drawings. Only qualified suppliers have been invited to bid.
Contract duration
The estimated contract period will be 2 month(s), with a proposed start date of 2023/08/14.
Trade agreements
-
Canadian Free Trade Agreement (CFTA)
Reason for limited tendering
A contracting officer can use limited tendering for specific reasons outlined in the applicable trade agreements. The reason for this contract is described below:
-
None
Businesses interested in partnering for this tender opportunity:
Note: Information may not be available in both English and French. This is because the Official Languages Act does not apply.
Contact information
Contracting organization
- Organization
-
Parks Canada
- Address
-
30 Victoria Street
Gatineau, Québec, J8X 0B3Canada
- Contracting authority
- Carmen Song
- Phone
- (604) 358-9479
- Email
- carmen.song@pc.gc.ca