Elevator Repair and Inspection

Solicitation number 53000-25-5104094

Publication date

Closing date and time 2025/08/19 16:00 EDT

Last amendment date


    Description

    The contractor must provide maintenance to the Elevating Devices.

    The contractor must provide a maintenance Log for each elevating device, in a manner that will identify the Contractor's adherence to the Maintenance Services, and the applicable Codes and Standards, as described in the Safety Codes. The Project Authority will use this Log as proof of service delivery should there be a discrepancy between services the contractor has rendered, and the services invoiced. The contractor must adhere to the maintenance requirements and intervals provided within the Elevating Devices Log as a minimum.

    Should the contractor deem
    that the maintenance requirements and intervals need to be increased for the elevating devices, the contractor must advise the Project Authority who must approve the increased services. The contractor must note the increased maintenance requirements and intervals in the Maintenance Logbook.

    The contractor must register all work performed on the equipment under this contract in maintenance logbook must include the equipment number, date, time of arrival, contracts employees s name, nature of the work performed, any identified problem(s) and actions taken to rectify them and time of departure. The Contractor must provide the Logbook at the start of the contract, which must be kept in the elevator machine room.

    The Project Authority will provide any site-specific examination and test frequencies for this contract which is provided in the tasks on statement of work.

    The contractor must provide an equipment specific Maintenance Control Program (MCP) as per the requirements of the regulatory Authority Having Jurisdiction and ASME A17.1/CSA B 44 Safety Code for Elevators (requirement 8.6.1.2.1). The contractor must adopt and comply with any portion of the MCP that is deemed more stringent than the Particular Requirements described in this statement of work.

    The contractor must maintain records of all maintenance activities, adjustments, verifications, tests, repairs and modifications for the duration of the contract, and provide them to the project authority upon request.

    When the contractor cannot return malfunctioning elevating equipment to service within the same day, the Contractor must provide, by the end of the following working day, a written report to the project authority describing the nature of the problem and the expected date of the service resumption.

    When the contractor determines it is necessary to take all or part of the elevator system(s) out of service for inspections, tests maintenance services and repairs, the contractor must make arrangements with the project authority a minimum of seventy-two (72) hours in advance). The contractor must provide details of the devices to be taken out of service electronically to the Project Authority outlining the scope of the work to be performed, anticipated time frame and the equipment involved.

    The Contractor must use proven information collection and delivery techniques, methodologies and systems as necessary to efficiently meet CSC requirements for regulatory reporting and documentation as well as invoice verification.

    The contractor must ensure that computer systems and information are protected with due regard to security and ensure disaster recovery and backup plans and procedures are in place to protect that information.

    The contractor must provide copies of all maintenance related work, tickets and visitation records with the invoices to allow the Project Authority to verify that the contractor meets inspection and maintenance frequencies stated in the contract.

    Contract duration

    The estimated contract period will be 60 month(s), with a proposed start date of 2025/10/01.

    Trade agreements

    • Canada-Chile Free Trade Agreement (CCFTA)
    • Canada-Peru Free Trade Agreement (CPFTA)
    • Canada-Colombia Free Trade Agreement
    • Canada-Panama Free Trade Agreement
    • Canada-Honduras Free Trade Agreement
    • Canadian Free Trade Agreement (CFTA)

    Reason for limited tendering

    A contracting officer can use limited tendering for specific reasons outlined in the applicable trade agreements. The reason for this contract is described below:

    • None
    Contact information

    Contracting organization

    Organization
    Correctional Service of Canada (CSC)
    Address

    3427 Faithfull Ave

    Saskatoon, Saskatchewan, S7K8H6
    Canada
    Contracting authority
    Katherine Booth
    Phone
    (306) 659-9300
    Email
    501Contracts@csc-scc.gc.ca
    Fax
    (306) 659-9317
    Address

    3427 Faithfull Ave

    Saskatoon, Saskatchewan, S7K8H6
    Canada
    Bidding details
    Full details regarding this tender opportunity are available in the documents below. Click on the document name to download the file. Contact the contracting officer if you have any questions regarding these documents.
    Caption
    Document title Amendment no. Language Unique downloads Date added
    001 EN 12 2025/07/11
    001 FR 0 2025/07/11
    001 EN 6 2025/07/11
    001 FR 0 2025/07/11
    Access the Getting started page for details on how to bid, and more.

    Summary information

    Notice type
    Request for Proposal
    Language(s)
    English, French
    Region(s) of delivery
    Drumheller
    Region of opportunity
    Drumheller
    Contract duration
    60 month(s)
    Procurement method
    Competitive – Open Bidding
    Selection criteria
    Lowest Price
    Commodity - UNSPSC
    Click the links below to see a list of notices associated with the UNSPSC.