Madeira Park Wharf Reconstruction, BC
Solicitation number 30007053
Publication date
Closing date and time 2025/09/08 14:00 EDT
Last amendment date
Description
The mandatory work to be carried out under this contract includes pile driving to replace deteriorated bearing piles and other heavy timber wharf construction such as stringer replacements and pile cap replacements on the wharf. The optional work to be carried out, upon award, under this contract includes additional pile driving and heavy timber construction such as replacing wharf cross braces, fender pile replacement, and pile bearing repairs on the wharf in Madeira Park Small Craft Harbour.
The site is located at 12967 Madeira Park Rd, Madeira Park BC V0N 2H0.
Mandatory work to be performed:
1. Replace Timber Wharf Bearing Piles
2. Replace Wharf Pile Cap
3. Replace Stringer
Optional work to be performed:
1. Replace Wharf Cross Bracing
2. Replace Fender Piles
3. Repair Bearing for Piles
4. Repair Bearing Between Stringer and Pile Cap
5. Band and Epoxy Timber Piles
6. Install Aluminum Caps on Piles
7. Replace Wheel Guard
Contract duration
The estimated contract period will be 4 month(s).
Trade agreements
-
Canadian Free Trade Agreement (CFTA)
Reason for limited tendering
A contracting officer can use limited tendering for specific reasons outlined in the applicable trade agreements. The reason for this contract is described below:
-
None
Contact information
Contracting organization
- Organization
-
Department of Fisheries and Oceans (DFO)
- Address
-
200 Kent Street
Ottawa, ON, K1A 0E6Canada
- Contracting authority
- Paige Yang
- Phone
- Email
- Paige.Yang@dfo-mpo.gc.ca
Bidding details
| Document title | Amendment no. | Language | Unique downloads | Date added |
|---|---|---|---|---|
| 30007053 - Madeira Park Wharf Reconstruction - RFQ.pdf | 001 | EN and FR | 54 | 2025/08/21 |
| 30007053 - Madeira Park Wharf Reconstruction - DDP_1.pdf | 001 | EN and FR | 37 | 2025/08/21 |