Roof Replacements – BC18 and BC24 – Beaver Creek Institution - Minimum

Solicitation number 21443-27-5425701

Publication date

Closing date and time 2026/08/20 15:00 EDT


    Description

    The Correctional Service Canada (CSC) requires a qualified contractor to complete the Roof Replacement for buildings BC18 (Unit 2) and BC24 (Unit 3) at Beaver Creek Institution.

    Objectives:
    CSC requires a qualified contractor to replace the existing aged asphalt shingle roof with a durable standing seam roofing system that enhances the structural integrity, improves weather resistance and reduces long term maintenance costs.

    Deliverables:
    a)The Contractor must ensure that all employees performing work at elevated heights have a valid Working from Heights certification.
    b)The Contractor must provide all required equipment, including their own equipment for working at heights to complete the work in the project.
    c)Measurement & Verification
    1.Verify all roof dimensions and conditions prior to ordering materials and commencing work.
    d)Preparation
    1.Inspect the roof deck and structure for damage, rot and deficiencies. Report any necessary repairs and provide a quote for additional work.
    2. Remove existing vents.
    3.Ensure the roof deck is clean and suitable for installation.
    e) Installation
    1.Supply and install a full-coverage synthetic roof underlayment beneath the metal roofing system across all roof areas
    i. Underlayment must be premium grade, non‑perforated synthetic material suitable for use under metal roofing systems
    ii. Minimum material weight of approximately 200 g/m² (or equivalent)
    iii. Underlayment must provide a continuous secondary water‑shedding barrier over the entire roof deck
    iv. Material must meet or exceed industry standards for water resistance, tear strength, UV stability, and slip resistance
    v. Installation must be completed in strict accordance with manufacturer’s specifications
    vi. Contractor must provide a minimum two (2) year transferable labour warranty covering installation of the underlayment system
    2. Install ¾” strapping at manufacturer recommended spacing and orientation for the standing seam system.
    3.Install 2” drip edge around the entire perimeter.
    4. Supply and install the new snap-lock standing seam roof system, including all accessory components:
    i. Panels: 24” wide, minimum 24-gauge (0.7mm) gauge thickness.
    ii. Finish: Hot-dipped zinc coated steel with factory applied colour finish.
    iii. Attachment: Hidden clip system; all fasteners and components must be corrosion resistant.
    5. Supply and install new roof vents, flashing and transitions to match the new roof colour.
    6. Provide colour samples to the Site Authority for approval prior to fabrication.
    7. Install appropriate sealants for a weather tight finish.
    8. Supply and install snow guards at all roof edge areas to prevent snow and ice overhangs and uncontrolled shedding
    i. Installation must include continuous coverage along the full perimeter of all roof sections, not limited to doors or designated walkways
    ii. Snow guard layout and spacing must be designed to provide effective snow retention across all roof edges
    iii. System must be compatible with the installed metal roofing system and designed to avoid damage to roof panels or fasteners
    iv. Installation must be completed in accordance with accepted industry best practices for metal roofing systems and to maintain roof system integrity and performance
    f) Compliance & Quality
    1. All materials and installation must comply with the manufacturer’s specifications.
    2. Provide written warranties for materials, finish, workmanship and service life.
    g) Site Management
    1. Protect surrounding property during work.
    2. Maintain a clean worksite and secure materials to prevent wind damage.
    3. Dispose of removed roofing material in accordance with environmental and local regulations.
    4. The building will be occupied during installation, so the entrance must be protected against falling material. The emergency exits must remain usable throughout the project.

    Contract duration

    The estimated contract period will be 3 month(s), with a proposed start date of 2026/09/01.

    Trade agreements

    • Canadian Free Trade Agreement (CFTA)

    Reason for limited tendering

    A contracting officer can use limited tendering for specific reasons outlined in the applicable trade agreements. The reason for this contract is described below:

    • None
    Contact information

    Contracting organization

    Organization
    Correctional Service of Canada (CSC)
    Address

    445 Union Street West

    Kingston, Ontario, K7L 2R8
    Canada
    Contracting authority
    Elizabeth Lake
    Phone
    (613) 328-9647
    Email
    elizabeth.lake@csc-scc.gc.ca
    Address

    445 Union Street West

    Kingston, Ontario, K7L 2R8
    Canada
    Bidding details
    Full details regarding this tender opportunity are available in the documents below. Click on the document name to download the file. Contact the contracting officer if you have any questions regarding these documents. Access the Getting started page for details on how to bid, and more.

    Summary information

    Notice type
    Directed Contract
    Language(s)
    English
    Region(s) of delivery
    Ontario (except NCR)
    ,
    Gravenhurst
    Region of opportunity
    Gravenhurst
    Contract duration
    3 month(s)
    Procurement method
    Competitive – Open Bidding
    Selection criteria