MDB - Construct Transition Centre, Edmonton
Solicitation number HQ001680, 82092
Publication date
Closing date and time 2024/11/12 14:00 EST
Last amendment date
Description
*** THIS AMENDS THE PREVIOUSLY POSTED NOTICE TO CHANGE THE CLOSING DATE TO NOVEMBER 12, 2024. TIME AND CLOSING LOCATION REMAIN UNCHANGED.
*******************************************************************************************************************
Defence Construction Canada, Design and Construction of a Transition Centre, 3rd Canadian Division Support Base Edmonton, Alberta, HQ001680.
DEFENCE CONSTRUCTION CANADA (DCC) is requesting Proposals from Design-Build Teams to design and construct the Transition Centre at Canadian Forces Base (CFB) Edmonton following a modified design-build approach. Additional details are provided in the Request for Proposals (RFP) documents.
The Rough Order Magnitude construction cost estimate for this Project is $18 Million.
Firms that consider themselves qualified to provide these services are invited to submit their proposals through the MERX Electronic Bidding System on or before the closing date and time indicated on the Electronic Bidding System.
This solicitation is being conducted in accordance with the requirements set out in the Canadian Free Trade Agreement (CFTA), Chapter Nineteen of the Canada-European Union Comprehensive Economic and Trade Agreement (CETA) and the World Trade Organization Agreement on Government Procurement (WTO-AGP).
The Security Requirements for this Project are identified in the RFP Documents.
Questions regarding this solicitation are to be directed ONLY to the point of contact identified in this advertisement. Bidders who address their questions to anyone other than the point of contact during the solicitation period may, for that reason alone, be disqualified.
Bidders can obtain contract award results from the DCC website at https://www.dcc-cdc.gc.ca/industry/contract-activity.
DCC now publicly discloses information on payments made to prime contractors so that subcontractors know when they can expect payment. Information on payments made in the past 90 days on construction contracts over $100,000, as well as further information regarding DCC’s prompt payment commitment, can be obtained from the DCC website at https://www.dcc-cdc.gc.ca/industry/contract-activity.
*******************************************************************************************************************
Defence Construction Canada, Design and Construction of a Transition Centre, 3rd Canadian Division Support Base Edmonton, Alberta, HQ001680.
DEFENCE CONSTRUCTION CANADA (DCC) is requesting Proposals from Design-Build Teams to design and construct the Transition Centre at Canadian Forces Base (CFB) Edmonton following a modified design-build approach. Additional details are provided in the Request for Proposals (RFP) documents.
The Rough Order Magnitude construction cost estimate for this Project is $18 Million.
Firms that consider themselves qualified to provide these services are invited to submit their proposals through the MERX Electronic Bidding System on or before the closing date and time indicated on the Electronic Bidding System.
This solicitation is being conducted in accordance with the requirements set out in the Canadian Free Trade Agreement (CFTA), Chapter Nineteen of the Canada-European Union Comprehensive Economic and Trade Agreement (CETA) and the World Trade Organization Agreement on Government Procurement (WTO-AGP).
The Security Requirements for this Project are identified in the RFP Documents.
Questions regarding this solicitation are to be directed ONLY to the point of contact identified in this advertisement. Bidders who address their questions to anyone other than the point of contact during the solicitation period may, for that reason alone, be disqualified.
Bidders can obtain contract award results from the DCC website at https://www.dcc-cdc.gc.ca/industry/contract-activity.
DCC now publicly discloses information on payments made to prime contractors so that subcontractors know when they can expect payment. Information on payments made in the past 90 days on construction contracts over $100,000, as well as further information regarding DCC’s prompt payment commitment, can be obtained from the DCC website at https://www.dcc-cdc.gc.ca/industry/contract-activity.
- code : 1.01
description : Lead Architect Architecte principal
unitOfMeasure : Hourly Rate - code : 1.02
description : Senior Architect Architecte sénior
unitOfMeasure : Hourly Rate - code : 1.03
description : Intermediate Architect Architecte intermédiaire
unitOfMeasure : Hourly Rate - code : 1.04
description : Lead Sustainable Designer Spécialiste principal en conception durable
unitOfMeasure : Hourly Rate - code : 1.05
description : Senior Sustainable Designer Spécialiste sénior en conception durable
unitOfMeasure : Hourly Rate - code : 1.06
description : Intermediate Sustainable Designer Spécialiste intermédiaire en conception durable
unitOfMeasure : Hourly Rate - code : 1.07
description : Lead Structural Engineer Ingénieur en structure principal
unitOfMeasure : Hourly Rate - code : 1.08
description : Senior Structural Engineer Ingénieur en structure sénior
unitOfMeasure : Hourly Rate - code : 1.09
description : Intermediate Structural Engineer Ingénieur en structure intermédiaire
unitOfMeasure : Hourly Rate - code : 1.1
description : Lead Mechanical Engineer Ingénieur mécanique principal
unitOfMeasure : Hourly Rate - code : 1.11
description : Senior Menchanical Engineer Ingénieur mécanique sénior
unitOfMeasure : Hourly Rate - code : 1.12
description : Intermediate Mechanical Engineer Ingénieur mécanique intermédiaire
unitOfMeasure : Hourly Rate - code : 1.13
description : Lead Electrical Engineer Ingénieur électrique principal
unitOfMeasure : Hourly Rate - code : 1.14
description : Senior Electrical Engineer Ingénieur électrique sénior
unitOfMeasure : Hourly Rate - code : 1.15
description : Intermediate Electrical Engineer Ingénieur électrique intermédiaire
unitOfMeasure : Hourly Rate - code : 1.16
description : Lead Civil or Municipal Engineer Ingénieur civil ou municipal principal
unitOfMeasure : Hourly Rate - code : 1.17
description : Senior Civil or Municipal Engineer Ingénieur civil ou municipal sénior
unitOfMeasure : Hourly Rate - code : 1.18
description : Intermediate Civil or Municipal Engineer Ingénieur civil ou municipal intermédiaire
unitOfMeasure : Hourly Rate - code : 1.19
description : Lead Building Information Modeling Specialist Spécialiste principal en modélisation des données du bâtiment
unitOfMeasure : Hourly Rate - code : 1.2
description : Senior Architectural or Engineering Technologists/Technician/Draftsperson Technologue, technicien, ou dessinateur sénior en architecture ou en génie
unitOfMeasure : Hourly Rate - code : 1.21
description : Intermediate Architectural or Engineering Technologists/Technician/Draftsperson Technologue, technicien, ou dessinateur intermédiaire en architecture ou en génie
unitOfMeasure : Hourly Rate - code : 1.22
description : Project Manager Gestionnaire de projet
unitOfMeasure : Hourly Rate - code : 1.23
description : Superintendent Surintendant
unitOfMeasure : Hourly Rate - code : 1.24
description : Indigenous Relations Coordinator Coordonnateur des relations avec les Autochtones
unitOfMeasure : Hourly Rate - code : 1.25
description : Lead Commissioning Manager or Commissioning Agent Gestionnaire principal de la mise en service ou agent de mise en service
unitOfMeasure : Hourly Rate - code : 1.26
description : Total Classification Rate Taux Horaire Pondéré Total
unitOfMeasure : Hourly Rate - code : 2
description : Maximum Upset Fee for the Contract Award Scope of Services Honoraire maximum pour l’étendue des services visés par l’attribution du contrat
unitOfMeasure : Dollar - code : 3.01
description : Estimated Cost of Travel for the Contract Award Scope of Services Coût de déplacement estimé pour l’étendue des services visés par l’attribution du contrat
unitOfMeasure : Dollar - code : 3.02
description : Maximum Upset Unit Travel Rate Coût de déplacement maximum unitaire
unitOfMeasure : Trip - code : 4
description : Disbursement Rate Taux des débours
ratioType : BOTH
unitOfMeasure : Percent - code : 5
description : Design-Builder Mark-Up Allowance Allocation majorée du concepteur-constructeur
ratioType : MARKUP
unitOfMeasure : Percent
Bidding and Documents are available on http://www.merx.com. Fees may apply; See https://www.merx.com/public/pricing for more information.
Contract duration
The estimated contract period will be 58 month(s).
Trade agreements
-
World Trade Organization Agreement on Government Procurement (WTO GPA)
-
Canadian Free Trade Agreement (CFTA)
-
Canada-European Union Comprehensive Economic and Trade Agreement (CETA)
Contact information
Contracting organization
- Organization
-
Defence Construction Canada / Construction de Défense Canada
- Address
-
350 Albert St,, 19th floor,Ottawa, Ontario, K1A 0K3Canada
- Contracting authority
- Sarah Montesano
- Phone
- 613-294-7162
- Email
- sarah.montesano@dcc-cdc.gc.ca
Bidding details
Full details for this tender opportunity are available on a third-party site
Click on the button below to be directed to this website. Note that on the third-party site you may need an account to view and/or bid on this tender. Information on any fees or additional costs to access the full details is outlined in the Description tab of this tender opportunity.