Arlington Street - Asphalt Reconstruction McPhillips Street - Mill and Fill
Solicitation number 17-2026
Publication date
Closing date and time 2026/03/11 13:00 EDT
Last amendment date
Description
D2.1 The Work to be done under the Contract shall consist of two parts:
(a) Part 1 – City Funded Work
(b) Part 2 – Federally and Provincially Funded Work.
Part 1 – City Funded Work
D2.2 Part 1 – City Funded Work shall consist of:
(a) Asphalt Reconstruction and Associated Works
(i) Arlington Street from Inkster Boulevard to Enniskillen Avenue
(b) Sewer Repairs and Associated Works
(i) Arlington Street from Inkster Boulevard to Enniskillen Avenue
Part 2 – Federally and Provincially Funded Work
D2.3 Part 2 – Federally and Provincially Funded Work shall consist of:
(a) Asphalt Mill and Fill and Associated Works
(i) McPhillips Avenue from Emes Road to North Point Boulevard
D2.4 The major components of the Work are as follows:
(a) Asphalt Reconstruction and Associated Works
(i) Abandon existing catch basins and drainage inlets;
(ii) Installation of catch basins and sewer service pipes;
(iii) Installation of manhole;
(iv) Installation of new 300mm combined sewer;
(v) Removal of existing sidewalk;
(vi) Removal of existing curb as required;
(vii) Renewal of existing concrete sidewalk as required;
(viii) Removal of existing pavement;
(ix) Excavation;
(x) Compaction of existing sub-grade;
(xi) Placement of wicking geogrid composite (E20);
(xii) Insulation of water mains;
(xiii) Installation of sub drains;
(xiv) Placement and compaction of sub-base material;
(xv) Placement and compaction of base course material;
(xvi) Construction of 150mm concrete pavement (reinforced);
(xvii) Construction of barrier curb and reversed gutter for asphalt pavement (SD-200B),
utilizing slip-form paving equipment;
(xviii) Construction of barrier curb for asphalt pavement (SD-200A);
(xix) Construction of modified barrier curb for asphalt pavement (SD-203C);
(xx) Construction of lip curb for asphalt pavement (SD-202E);
(xxi) Construction of curb ramp for asphalt pavement (SD-229F);
(xxii) Renewal of existing curb as required;
(xxiii) Placement and compaction of suitable site material as backfill behind barrier curb and
reversed gutter;
(xxiv) Placement and compaction of 50mm granular B behind barrier curb and modified barrier
curb for asphalt pavements;
(xxv) Grading of boulevards;
(xxvi) Placement and compaction of topsoil;
(xxvii) Placement of asphalt pavement (Type MS2, 60mm thickness);
(xxviii) Installation of pavement repair fabric at gutter inlets and manholes (SD-220E and
SD-220G);
(xxix) Placement of asphalt pavement (Type MS1, 50mm thickness);
(xxx) Placement of asphalt pavement tie-ins (Type MS2 and MS1); and
(xxxi) Placement of sod.
(b) Sewer Repairs and Associated Works
(i) Pre-construction sewer and sewer service video inspection;
(ii) External point repair of existing sewer main;
(iii) Sewer service reconnection;
(iv) Install new manhole and connect to existing sewer;
(v) Post construction sewer and sewer service video inspection.
(c) Asphalt Mill and Fill and Associated Works
(i) Asphalt pavement removal;
(ii) Re-grading existing ditch and side slopes;
(iii) Excavation;
(iv) Sub-grade compaction;
(v) Placement of geotextile fabric;
(vi) Preparation of existing shoulder;
(vii) Placement and compaction of sub-base material;
(viii) Placement of geogrid;
(ix) Placement and compaction of base course material;
(x) Milling existing asphalt pavement (1-50mm);
(xi) Full depth concrete repairs of existing slabs and joints (200mm reinforced);
(xii) Asphalt patching;
(xiii) Renewal of existing curb as required;
(xiv) Renewal of existing concrete bull-nose;
(xv) Construction of 150mm concrete pavement (reinforced);
(xvi) Construction of modified barrier curb;
(xvii) Grading of boulevards;
(xviii) Placement of asphalt pavement (Type MS1);
(xix) Placement and compaction of topsoil; and
(xx) Hydroseeding
Bidding and Documents are available on http://www.merx.com. Fees may apply; See https://www.merx.com/public/pricing for more information.
Contract duration
The estimated contract period will be 0 month(s), with a proposed start date of 2026/09/01.
Trade agreements
-
Canadian Free Trade Agreement (CFTA)
-
Please refer to tender description or tender documents
Contact information
Contracting organization
- Organization
-
The City of Winnipeg
- Address
-
185 King StreetWinnipeg, Manitoba, R3B 1J1Canada
- Contracting authority
- Drew Murray
- Phone
- 204-986-2492
- Email
- DMurray@winnipeg.ca
Bidding details
Full details for this tender opportunity are available on a third-party site
Click on the button below to be directed to this website. Note that on the third-party site you may need an account to view and/or bid on this tender. Information on any fees or additional costs to access the full details is outlined in the Description tab of this tender opportunity.