2026 Local Street Renewal Program - Rogan Drive and Various Other Locations
Solicitation number 27-2026
Publication date
Closing date and time 2026/03/16 13:00 EDT
Last amendment date
Description
D2.1 The Work to be done under the Contract shall consist of three parts:
(a) Part 1 – City Funded Work
(b) Part 2 – Transit Improvements
(c) Part 3 – Water and Waste Work.
Part 1 – City Funded Work
D2.2
Part 1 – City Funded Work shall consist of:
(a) Pavement Rehabilitation
(i) Addington Bay (North Leg) from End to Oakdale Drive
(ii) Addington Bay (South Leg) from End to Oakdale Drive
(iii) Alenbrook Bay (South Leg) From End to Oakdale Drive
(iv) Bellavista Crescent from Rogan Drive to Voyageur Avenue
(v) Radar Place from Rogan Drive to Voyageur Avenue
(vi) Rogan Drive from Bellavista Crescent to Hamilton Avenue
(vii) Raquette Street from Assiniboine Avenue to Browning Boulevard
(viii) West Avenue from Whitegates Crescent to Rouge Road
(ix) Denton Place from Grant Avenue to End
(x) Golf Boulevard from Meadowside Drive to McBey Avenue
(b) Thin Bituminous Overlay
(i) Cora Avenue from Whitegates Crescent to Maureen Street
(ii) Kilmer Avenue from Longfellow Bay to Carroll Road
(iii) Greenacre Boulevard from McBey Avenue to Portage Avenue
(c) Alley Pavement Rehabilitation
(i) Bedson Street and Best Street Alley from Allard Avenue to Portage Avenue
(ii) Portage Avenue Alley from Bedson Street to Best Street
(iii) Woodfield Bay Alley from Woodfield Bay to Woodfield Bay
(iv) Portage Avenue Alley from Thompson Drive to Wallasey Street
(v) Portage Avenue Alley from Wallasey Street to Aldine Street
(vi) Portage Avenue Alley from Olive Street to Whytewold Road
(vii) Portage Avenue Alley from Whytewold Road to Vernon Road
(d) Sidewalk Renewal (Local Streets)
(i) Morton Bay to Barker Boulevard
(ii) Westgrove Way to Westgrove School
(iii) Kersey Bay to Westgrove School
(iv) Hammond Road to Sandham Crescent
(v) Betsworth Avenue from Evenwood Crescent to Cullen Drive
(vi) Savoy Crescent to Alley North of Speyside Avenue
Aldershot Boulevard to Cuthbertson Avenue
(e) Sidewalk Renewal (Regional Street)
(i) Portage Avenue (South Side) – 25m West of Strathmillan Road to Sharp Boulevard
Part 2 – Winnipeg Transit Funded Work
3
Part 2 – Winnipeg Transit Funded Work shall consist of:
(a) Transit Improvements
(i) Cavalier Drive and Ness Avenue
(ii) Betsworth Avenue and Cullen Drive
Part 3 – Water and Waste Funded Work
D2.4 Part 3 – Water and Waste Funded Work shall consist of:
(a) Manhole Repairs
(i) Addington Bay (South Leg)
(ii) Alenbrook Bay (South Leg)
(iii) Raquette Street
(iv) Portage Avenue Alley between Wallasey Street and Aldine Street
(b) Sewer Repairs
(i) Raquette Street
D2.5 The City currently has no approved funding in the Capital Budget for Part 2 or Part 3
of the Work, but is anticipating receiving notification about funding from Winnipeg Transit and the
City of Winnipeg Water and Waste Department, respectively, by late May. Part 2 and Part 3 of the
Work are contingent upon Winnipeg Transit and the City of Winnipeg Water and Waste Department
approving sufficient funding.
D2.5.1 Further to C7.1, if notice of sufficient funding is not received, the City shall
have the right to eliminate all or any portion of Part 2 or Part 3, and the Contract Price will be
reduced accordingly.
D2.5.2 Further to C7.5, C7.5.1, and C7.6, a reduction in the Contract Price pursuant to
D2.5.1 shall not be considered in calculating the aggregate reduction in the Contract Price for
purposes of C7.5.
D2.5.3 If all or any portion of Part 2 or Part 3 is eliminated pursuant to D2.5.1, the
time periods stipulated in D19 for Substantial Performance of the Work and in D20 for Total
Performance of the Work will be reduced proportionally by the Contract Administrator acting
reasonably.
D2.6 The major components of the Work are as follows:
(a) Street Pavement Rehabilitation (Addington Bay (North Leg), Addington Bay (South Leg),
Alenbrook Bay (South Leg), Bellavista Crescent, Radar Place, Rogan Drive, Raquette Street, West
Avenue, Denton Place, Golf Boulevard)
(i) Installation of new catch basins/catchpits and sewer service/drainage connection pipe
(ii) Renewal of miscellaneous pavement slabs (150mm reinforced concrete pavement)
(iii) Renewal of existing barrier curb
(iv) Planing of existing mountable curb
(v) Construction of modified 75mm lip curb
(vi) Renewal of existing sidewalks c/w detectable warning tiles as required
(vii) Adjustment of catch basins and manholes
(viii) Planing of existing asphalt pavement
(ix) Installation of pavement repair fabric at various locations
(x) Construction of new asphalt overlay (85mm average thickness)
(xi) Adjustment of paving stones or patio blocks
(xii) Boulevard restoration
(b) Thin Bituminous Overlay (Cora Avenue, Kilmer Avenue, Greenacre Boulevard)
(i) Renewal of miscellaneous pavement slabs (150mm reinforced concrete pavement)
(ii) Renewal of existing 7 mm lip curb
(iii) Adjustment of catch basins and manholes
(iv) Construction of new asphalt overlay (65mm average thickness)
(v) Boulevard restoration
(c) Alley Pavement Rehabilitation (Bedson Street and Best Street Alley, Portage Avenue Alleys)
(i) Renewal of miscellaneous pavement slabs (150mm reinforced concrete pavement)
(ii) Adjustment of catch basins and manholes
(iii) Construction of new asphalt overlay on Portage Avenue north alley bounded by Wallasey
Street and Aldine Street
(iv) Boulevard and granular surface restoration
(d) Sidewalk Renewal (Local Streets and Portage Avenue)
(i) Abandonment of existing drainage inlets, installation of new catch pits / catch basins and
renewal of miscellaneous slabs (150mm reinforced concrete pavement) (Westgrove Way to Westgrove
School and Savoy Crescent to Alley North of Speyside Avenue)
(ii) Removal of existing sidewalk (Local Streets and Portage Avenue)
(iii) Construction of new 100mm sidewalk (Local Streets and Portage Avenue)
(iv) Construction of new monolithic curb and 100mm sidewalk (Betsworth Avenue and Portage
Avenue)
(v) Construction of new monolithic curb and 150mm reinforced sidewalk for Transit shelters
(Portage Avenue)
(vi) Installation of detectable warning surface tiles (Betsworth Avenue and Portage Avenue)
(vii) Adjustment of curb stop boxes, valves, and manhole frames (Local Streets and Portage
Avenue)
(viii) Boulevard restoration (Local Streets and Portage Avenue)
(e) Transit Improvements (Ness Avenue and Cavalier Drive, Betsworth Avenue and Cullen Drive)
(i) Removal of existing concrete bus pads
(ii) Construction of new concrete monolithic curb and 150mm reinforced sidewalk at specified
locations
(iii) Renewal of existing barrier curb
(iv) Boulevard restoration
(f) Water and Waste Work (Addington Bay (South Leg), Alenbrook Bay (South Leg), Raquette Street,
and Portage Avenue Alley between Wallasey Street and Aldine Street)
(i) Grouting cracks and creviced on manhole walls
(ii) Replace existing pre-cast concrete risers
(iii) Repair of concrete benching in manholes
(iv) External point repairs to existing sewer mains
(v) Inspection of manholes
(vi) Inspection of sewers.
Bidding and Documents are available on http://www.merx.com. Fees may apply; See https://www.merx.com/public/pricing for more information.
Contract duration
The estimated contract period will be 0 month(s), with a proposed start date of 2026/08/31.
Trade agreements
-
Canadian Free Trade Agreement (CFTA)
-
Please refer to tender description or tender documents
Contact information
Contracting organization
- Organization
-
The City of Winnipeg
- Address
-
185 King StreetWinnipeg, Manitoba, R3B 1J1Canada
- Contracting authority
- Drew Murray
- Phone
- 204-986-2492
- Email
- DMurray@winnipeg.ca
Bidding details
Full details for this tender opportunity are available on a third-party site
Click on the button below to be directed to this website. Note that on the third-party site you may need an account to view and/or bid on this tender. Information on any fees or additional costs to access the full details is outlined in the Description tab of this tender opportunity.