ACP Toplift Paving South Link Connector and TWP Road 240_
Numéro de sollicitation 2023-CGIPMO-RFP-020
Date de publication
Date et heure de clôture 2023/08/14 18:30 HAE
Date de la dernière modification
Description
The South Link Connector and Township Road 240 project has been ongoing for a period of 3 years, and it is now at a crucial stage where an asphalt toplift is required. This asphalt toplift will ensure the road is in optimal condition and can withstand future years of usage.
It is imperative that this asphalt toplift is completed within this year to maintain the road's durability and functionality.
Durée du contrat
La durée estimée du contrat sera de 2 mois, avec une date de début proposée du 2023/08/23.
Accords commerciaux
-
Accord de libre-échange canadien (ALEC)
-
Accord économique et commercial global (AECG) entre le Canada et l’Union européenne (UE)
Coordonnées
Organisation contractante
- Organisation
-
City of Chestermere
- Adresse
-
105 Marina RoadChestermere, Alberta, T1X 1V7Canada
- Autorité contractante
- Renee Spuler
- Numéro de téléphone
- 1-403-207-7075 ext 7105
- Adresse courriel
- procurement@chestermere.ca
- Adresse
-
105 Marina RdChestermere, Alberta, T1X 1V7Canada
Détails de l'offre
Les détails complets de cette occasion de marché sont disponibles sur un site tiers
Cliquez sur le bouton ci-dessous pour vous rendre vers ce site Web. Le site tiers pourrait exiger la création d’un compte personnel pour consulter l’occasion de marché ou pour soumissionner. Les informations reliées aux frais encourus pour accéder aux détails complets sont indiqués sous l’onglet Description.