Entretien du système SAP Ariba

En raison d'entretien planifié, SAP Ariba ne sera pas disponible aux heures indiquées ci-dessous. Nous nous excusons pour tout inconvénient. 

  • le samedi 18 mai de 20h00 à 23h00 (heure de l'Est) 

Workforce Management Solution

Numéro de sollicitation 1220-030-2023-006

Date de publication

Date et heure de clôture 2023/12/06 18:00 HNE

Date de la dernière modification


    Description
    REQUEST FOR PROPOSALS

    SCOPE OF SERVICES


    The scope of services for implementation of the Solution includes the following:

    Requirements Review and Discovery Assessment
    • Operational-based scheduling, time entry, exception-based scheduling, analysis, planning and preparation.
    • Review the requirements gathered and conduct a needs/discovery assessment to understand the scheduling, time entry, leave management and job costing requirements and challenges.
    • Engage with key stakeholders, including program managers, supervisors, and staff, to review requirements and capture their input on the Solution.

    Solution Design and Configuration
    • Design and configure a comprehensive Solution that incorporates the specific requirements of the City’s operational-based scheduling and exception-based scheduling groups.
    • Develop operational-based scheduling and exception-based scheduling algorithms and rules that optimize resource allocation and minimize conflicts.
    • Ensure that the Solution design/configuration will be able to support the City’s initial Phase 1 operational-based scheduling and exception-based scheduling groups as well as the functional requirements of the remaining Phase 2 business units.

    Proponent and City Project Management
    • The proponent is expected to provide a dedicated project manager for the duration of the implementation.
    • This role will work alongside the City's Portfolio Lead and/or Sr. Project or Program Manager to ensure project alignment, facilitate communication, and manage deliverables and timelines.

    Environments for Project Support
    • Collaborate with the City to identify and deploy the necessary environments required to support project delivery and operational continuity after the initial deployment, which may include but not limited to Development, Test, Stage, User Acceptance Testing, and Training.

    System Implementation and Testing
    • Install and configure the Solution infrastructure if/as required.
    • Develop, configure and deploy the necessary software components and modules.
    • Develop a Test Strategy, Test Plan including test cases and scenarios and conduct comprehensive testing to ensure the Solution meets all functional, security, integration, load and performance requirements.
    • Address any product defects, bugs or issues identified during the testing phases.

    Training and Change Management
    • Develop Training Strategy, Training Plan, materials, and conduct training sessions to cover all Users including but not limited to system administrators, technical support, schedulers, train the trainer, end-users, including Program managers, supervisors, and staff.
    • Provide ongoing support and guidance during the transition to the new Solution.
    • Develop change management strategies and plan, in collaboration with the City, to ensure a smooth transition and User adoption of the new system.

    Ongoing Sustainment and Support Collaboration
    • Work collaboratively and support the City in establishing an ongoing sustainment and support team.
    • Advise the City in best practices to develop a sustainment and support strategy that aligns with the City’s operational objectives and technology roadmap.
    • Assist the City with defining roles and responsibilities across the organization for the ongoing sustainment and support of the implemented Solution.
    • Assist with identifying upskilling, training, and skill gap requirements for City staff to effectively manage and maintain the platform.
    • Ensure a full and complete knowledge transfer to the City’s IT and business teams, empowering them to sustain and optimize the platform post-implementation.

    INFORMATION MEETING

    An information meeting will be hosted by the City Representative to discuss the City’s requirements under this RFP (the “Information Meeting”). While attendance is at the discretion of Proponents, Proponents who do not attend will be deemed to have attended the Information Meeting and to have received all of the information given at the Information Meeting. At the time of issuance of this RFP a meeting has been scheduled as follows:

    When: October 17, 2023
    Where: Video/Phone Conference – Microsoft Teams Meeting
    Time: 2:00 pm PST


    Proponents interested in participating in this Information Meeting should email their request to purchasing@surrey.ca before October 16th.

    ADDENDA

    If the City determines that an amendment is required to this RFP, the City Representative will issue a written addendum by posting it on the BC Bid Website at www.bcbid.gov.bc.ca and the City Website at www.surrey.ca (collectively, the “Websites”), and upon posting, any addenda will form part of this RFP. It is the responsibility of Proponents to check the Websites for addenda. The only way this RFP may be added to, or amended in any way, is by a formal written addendum. No other communication, whether written or oral, from any person will affect or modify the terms of this RFP or may be relied upon by any Proponent. By delivery of a Proposal the Proponent is deemed to have received, accepted and understood the entire RFP, including any and all addenda.

    All inquiries related to this RFP should be directed in writing to purchasing@surrey.ca 

    Durée du contrat

    Voir la description ci-dessus pour voir tous les détails.

    Accords commerciaux

    • Veuillez consulter la description ou les documents de l'appel d'offres

    Former un partenariat avec une autre entreprise

    La fonctionnalité permettant d'ajouter le nom de votre entreprise à la liste des entreprises intéressées est temporairement indisponible.

    Cette liste ne remplace pas et n'affecte pas les procédures de l'appel d'offres pour ce processus d'achat. Les entreprises doivent tout de même répondre aux demandes de soumissions et concurrencer en fonction des critères établis. Pour plus d'informations, veuillez lire les conditions d'utilisation.

    Coordonnées

    Organisation contractante

    Organisation
    City of Surrey
    Autorité contractante
    Sunny Kaila
    Adresse courriel
    purchasing@surrey.ca
    Détails de l'offre

    Les détails complets de cette occasion de marché sont disponibles sur un site tiers

    Cliquez sur le bouton ci-dessous pour vous rendre vers ce site Web. Le site tiers pourrait exiger la création d’un compte personnel pour consulter l’occasion de marché ou pour soumissionner. Les informations reliées aux frais encourus pour accéder aux détails complets sont indiqués sous l’onglet Description.

    Admissibilité et conditions d’utilisation

    Les occasions de marché du gouvernement du Canada, ainsi que les avis d’attribution, les documents de sollicitations et autres documents sont disponibles sans frais sur AchatsCanada, sans devoir s’inscrire.

    Les informations peuvent être disponibles sur une autre source avant d'être disponibles sur AchatsCanada. Vous avez peut-être reçu ces informations via un distributeur tiers. Le gouvernement du Canada n'est pas responsable des avis d'appel d'offres ou des documents et pièces jointes qui ne sont pas accédés directement à partir d’AchatsCanada.canada.ca.

    Les appel d'offres ou avis d'attribution du gouvernement du Canada sont titulaire d’une licence du gouvernement ouvert - Canada qui régit son utilisation. Les documents de sollicitation et / ou les pièces jointes à l'appel d'offres sont protégés par le droit d'auteur. Veuillez consulter les conditions d’utilisation pour obtenir plus d'information.

    Détails

    Type d’avis
    Autre
    Langue(s)
    Anglais

    Soutien aux petites et moyennes entreprises

    Si vous avez des questions concernant cette occasion de marché, veuillez communiquer avec l'agent de négociation des contrats, dont les coordonnées se trouvent sous l'onglet Coordonnées.

    Consultez notre page de soutien si vous avez besoin d'aide ou si vous avez des questions sur le processus d'approvisionnement du gouvernement, y compris sur la façon de soumissionner ou de s'inscrire dans SAP Ariba. Vous pouvez également contacter Soutien en approvisionnement Canada, qui dispose de bureaux à travers le Canada.

    Date de modification: