11735 Construction- Pedestrian Bridge Removal- Mill Creek
Numéro de sollicitation BC190486
Date de publication
Date et heure de clôture 2024/04/22 17:00 HAE
Description
The project involves the removal and demolition of two bridges over Mill Creek, specifically Structure 77 and Structure 94, accompanied by riparian restoration and improvements. Structure 94, an abandoned railway bridge now repurposed as a pedestrian bridge, spans 22.5 meters across Mill Creek, approximately 10.6 km upstream from its confluence with Okanagan Lake. Built around 2006 for the C.N.R Railway to access a steel facility, it features a single-span steel girder design with a 4.9-meter-wide concrete deck and rock crush fill barriers. Structure 77, located about 5.6 km upstream from the confluence, is an abandoned timber pedestrian bridge with three spans totaling 14.06 meters in length. It includes a 3.5-meter-wide deck with a gravel surface and a 0.92-meter-wide pedestrian walkway alongside.
Durée du contrat
Voir la description ci-dessus pour voir tous les détails.
Accords commerciaux
-
Veuillez consulter la description ou les documents de l'appel d'offres
Coordonnées
Organisation contractante
- Organisation
-
City of Kelowna
- Autorité contractante
- Anna Levay
- Adresse courriel
- purchasing@kelowna.ca
Détails de l'offre
Les détails complets de cette occasion de marché sont disponibles sur un site tiers
Cliquez sur le bouton ci-dessous pour vous rendre vers ce site Web. Le site tiers pourrait exiger la création d’un compte personnel pour consulter l’occasion de marché ou pour soumissionner. Les informations reliées aux frais encourus pour accéder aux détails complets sont indiqués sous l’onglet Description.