20.20.07-05 - Replacement to Bilston Creek Bridges

Numéro de sollicitation BC20.20.07-05

Date de publication

Date et heure de clôture 2023/03/15 17:00 HAE

Date de la dernière modification


    Description
    The works to be constructed under this Contract generally include, but is not limited to, the following:

    The supply, fabrication, and installation of replacement bridges that form part of the Galloping Goose Regional Trail and span Bilsten Creek near Luxton Road and Wild Ridge Way in Langford, BC.  Includes demolition of the existing timber structures and supports, excavation for new abutments, and supply and installation of new concrete bridge structures.  The work will include preparation of shop drawings and as-constructed drawings.
     

    Durée du contrat

    Voir la description ci-dessus pour voir tous les détails.

    Accords commerciaux

    • Veuillez consulter la description ou les documents de l'appel d'offres
    Coordonnées

    Organisation contractante

    Organisation
    Capital Regional District
    Autorité contractante
    Kade Hardy
    Adresse courriel
    khardy@crd.bc.ca
    Détails de l'offre

    Les détails complets de cette occasion de marché sont disponibles sur un site tiers

    Cliquez sur le bouton ci-dessous pour vous rendre vers ce site Web. Le site tiers pourrait exiger la création d’un compte personnel pour consulter l’occasion de marché ou pour soumissionner. Les informations reliées aux frais encourus pour accéder aux détails complets sont indiqués sous l’onglet Description.

    Détails

    Type d’avis
    Autre
    Langue(s)
    Anglais