Smith Beach Creek Channel Repair
Status Awarded
Contract number 587653
Solicitation number AL1458
Publication date
Contract award date
Contract value
Status Awarded
Contract number 587653
Solicitation number AL1458
Publication date
Contract award date
Contract value
This contract was awarded to:
SCOPE OF WORK .1 Work covered by this contract consists mainly in the rehabilitation of a portion of the creek at the Smith Beach of Lac Philippe, in Gatineau Park, located near Ste-Cécile de Masham, Quebec and includes, but is not limited to, the following: .1 Erosion and sediment control, including creek diversion and settling pond .2 Salvage and adjust existing temporary fencing .3 Salvage, pot, store and water existing plant material for re-use .4 Excavation, backfilling and site grading of new channel (salvaged and new fill material) .5 Supply and installation of angular stone (riprap) and key stone boulders .6 Salvage and re-installation of rounded riverstone .7 Topsoil and finish grading .8 Seeding (broadcast and/or hydroseeding) .9 Supply and installation of coir erosion control mat .10 Recover, stockpile and re-plant plant material .11 Maintenance of re-plant plant material (1 year) .12 Rehabilitation of disturbed areas
Refer to the description above for full details.