Mt. Dennis Slope Stabilization in Yoho National Park, BC

Status Awarded

Contract number 5P420-15-5118

Solicitation number 5P420-15-5118/B

Publication date

Contract award date

Last amendment date


    Description

    This contract was awarded to:

    Max Helmer Construction Ltd.
    During a hazard and risk assessment it was noted that a large mass of potentially unstable soil (earth slump), as evidenced by open cracks and signs of mass slope movement, existed a short distance upstream from the Village of Field, BC. Previous studies and initial field investigations have identified a significant amount of surface water running on to the instability from upslope. Parks Canada requires a contractor to intercept a large portion of the upslope run-on and divert this water around the instability to Stephen Creek. The work needs to occur as soon as possible to reduce the risk of immediate failure.
    Business address
    P.O. Box 2529
    Invermere, BC, V0A 1K0
    Procurement method
    Competitive – Open Bidding
    Language(s)
    English
    ,
    French

    Contract duration

    Refer to the description above for full details.

    Commodity - GSIN

    • 5139A - Construction Services, Not Elsewhere Specified
    Contact information

    Contracting organization

    Organization
    Parks Canada
    Address
    30 Victoria Street
    Gatineau, Quebec, J8X 0B3
    Canada
    Contracting authority
    National Contracting Services
    Address
    Parks Canada Agency
    635 – 8 Avenue S.W., Suite 1300
    Calgary, AB, T2P 3M3

    Buying organization(s)

    Organization
    Parks Canada
    Address
    30 Victoria Street
    Gatineau, Quebec, J8X 0B3
    Canada
    Date modified: