City of Cold Lake - Invitation to Bid - Lakeshore Drive Phase 1B
Solicitation number AB-2024-02002
Publication date
Closing date and time 2024/04/08 07:30 EDT
Description
Due to the proximity to the lake and recent landslide remediation’s along the lakeshore, the replacement of the underground utilities (water, sewer and Storm) posed the potential to destabilize the embankment. Therefore, the embankment will be reinforced with a sea wall. The seawall will not only allow for the replacement of the underground utilities, it will also allow for additional green space to be created overlooking the lake. Updates will also be made to the flow of traffic, overall parking plan, walkability and visual appeal of Lakeshore Drive. The project can be broadly classified into three main components: Slope stability on the lake side; Infrastructure improvements – roads, underground pipes, drainage improvements; and Landscape architectural enhancements to develop the corridor as a linear parkway connecting Kinosoo Beach and Cold Lake Marina.
Contract duration
The estimated contract period will be 13 month(s), with a proposed start date of 2024/05/22.
Trade agreements
-
No trade agreements are applicable to this solicitation process
Contact information
Contracting organization
- Organization
-
City of Cold Lake
- Address
-
5513-48 AvenueCold Lake, CA-AB, T9M 1A1CA
- Contracting authority
- Wade Friesen
- Email
- wfriesen@coldlake.com
- Address
-
5513-48 AvenueCold Lake, Alberta, T9M 1A1Canada
Bidding details
Full details for this tender opportunity are available on a third-party site
Click on the button below to be directed to this website. Note that on the third-party site you may need an account to view and/or bid on this tender. Information on any fees or additional costs to access the full details is outlined in the Description tab of this tender opportunity.