City of Edmonton - Negotiated Request for Proposal - 935485 CM Southeast Transit Garage
Solicitation number AB-2024-07573
Publication date
Closing date and time 2024/10/16 12:00 EDT
Last amendment date
Description
The Southeast Transit Garage is planned to be an up to 430
forty-foot equivalent emissions neutral facility able to store and
maintain a fully zero emission fleet. The garage is planned to include
a mix of zero emission technology, including both Fuel Cell Electric
Buses (FCEB) and Battery Electric Buses (BEB). The final
determination of Zero Emission Bus (ZEB) technology will be
informed by results from the City’s current BEB deployment and
FCEB pilot project and will be confirmed during the preconstruction
stage of the project.
The project delivery method will be Construction Management at
Risk (CMAR) which is recognised for collaboration between all
members of the Project team during the pre-construction,
construction, and post construction stages. This collaboration
includes activities such as design reviews, constructability and value
analysis/engineering, development of the tender process as well as
other key objectives as identified in the Contract.
Contract duration
The estimated contract period will be 79 month(s), with a proposed start date of 2024/10/21.
Trade agreements
-
Canada-European Union Comprehensive Economic and Trade Agreement (CETA)
Contact information
Contracting organization
- Organization
-
City of Edmonton
- Address
-
9803-102A AvenueEdmonton, CA-AB, T5J 3A3CA
- Contracting authority
- Linda Lu
- Email
- linda.lu@edmonton.ca
- Address
-
9803-102A AvenueEdmonton, Alberta, T5J 3A3Canada
Bidding details
Full details for this tender opportunity are available on a third-party site
Click on the button below to be directed to this website. Note that on the third-party site you may need an account to view and/or bid on this tender. Information on any fees or additional costs to access the full details is outlined in the Description tab of this tender opportunity.