Agriculture and Irrigation - Request for Proposal - SPRINGBANK OFFSTREAM RESERVOIR (SR1) PROJECT - Annual Performance Review
Solicitation number AB-2025-04023
Publication date
Closing date and time 2025/07/03 10:00 EDT
Last amendment date
Description
The objective of this Annual Performance Review (APR) is for the performance of the Springbank Offstream Reservoir (SR1 Dam Project) and associated structures to ensure safety, identify deficiencies, and make recommendations to address the deficiencies. The APR should evaluate if the performance of all the project component structures is adequate to meet dam safety requirements under the Water Act and the Water (Ministerial) Regulation – Part 6 (Dam and Canal Safety), as well as the CDA Dam Safety Guidelines 2007 and its 2013 revision, CDA Guidelines for Public Safety around Dams (2011) and Technical Bulletins (2007) and Alberta Dam and Canal Safety Directive (ADCSD) 2018, which are used as best practices for the dam safety reviews of all Agriculture and Irrigation (AGI) dams.
Under the ADCSD the APR must:
a. Include a level of detail that is commensurate with
i. The risk to factors at risk posed by the dam or canal.
ii. The complexity of the structures of the dam or canal.
b. Be performed based on current industry standards and best practices.
c. Include a detailed engineering inspection to examine and document the condition of the
structures.
d. Include a detailed review, analysis and assessment of instrumentation monitoring data
used to monitor performance of the structures.
e. Assess performance of the structures by reviewing and comparing any observed
anomalies with established quantifiable performance objectives and previously
documented performance and inspections of the structures.
f. Make recommendation for appropriate measures to monitor, mitigate, and manage the
risks posed by identified safety deficiencies and critical safety deficiencies, including:
i. A detailed review and re-adjustment of established quantifiable performance
objectives;
ii. A detailed review and re-adjustment of the design of the structures.
Contract duration
The estimated contract period will be 8 month(s), with a proposed start date of 2025/07/02.
Contact information
Contracting organization
- Organization
-
Agriculture and Irrigation
- Address
-
7000 - 113 StreetEdmonton, CA-AB, T6H 5T6CA
- Contracting authority
- Hasan Zaidi
- Email
- dam.safety@gov.ab.ca
- Address
-
8th Floor Oxbridge Place 9820-106 Street Edmonton Alberta T5K 2J6 CanadaEdmonton, Alberta, T5K 2J6Canada
Bidding details
Full details for this tender opportunity are available on a third-party site
Click on the button below to be directed to this website. Note that on the third-party site you may need an account to view and/or bid on this tender. Information on any fees or additional costs to access the full details is outlined in the Description tab of this tender opportunity.