Agriculture and Irrigation - Request for Proposal - SPRINGBANK OFFSTREAM RESERVOIR (SR1) PROJECT - Annual Performance Review

Solicitation number AB-2025-04023

Publication date

Closing date and time 2025/07/03 10:00 EDT

Last amendment date


    Description
    The objective of this Annual Performance Review (APR) is for the performance of the Springbank Offstream Reservoir (SR1 Dam Project) and associated structures to ensure safety, identify deficiencies, and make recommendations to address the deficiencies. The APR should evaluate if the performance of all the project component structures is adequate to meet dam safety requirements under the Water Act and the Water (Ministerial) Regulation – Part 6 (Dam and Canal Safety), as well as the CDA Dam Safety Guidelines 2007 and its 2013 revision, CDA Guidelines for Public Safety around Dams (2011) and Technical Bulletins (2007) and Alberta Dam and Canal Safety Directive (ADCSD) 2018, which are used as best practices for the dam safety reviews of all Agriculture and Irrigation (AGI) dams. Under the ADCSD the APR must: a. Include a level of detail that is commensurate with i. The risk to factors at risk posed by the dam or canal. ii. The complexity of the structures of the dam or canal. b. Be performed based on current industry standards and best practices. c. Include a detailed engineering inspection to examine and document the condition of the structures. d. Include a detailed review, analysis and assessment of instrumentation monitoring data used to monitor performance of the structures. e. Assess performance of the structures by reviewing and comparing any observed anomalies with established quantifiable performance objectives and previously documented performance and inspections of the structures. f. Make recommendation for appropriate measures to monitor, mitigate, and manage the risks posed by identified safety deficiencies and critical safety deficiencies, including: i. A detailed review and re-adjustment of established quantifiable performance objectives; ii. A detailed review and re-adjustment of the design of the structures.

    Contract duration

    The estimated contract period will be 8 month(s), with a proposed start date of 2025/07/02.

    Contact information

    Contracting organization

    Organization
    Agriculture and Irrigation
    Address
    7000 - 113 Street
    Edmonton, CA-AB, T6H 5T6
    CA
    Contracting authority
    Hasan Zaidi
    Email
    dam.safety@gov.ab.ca
    Address
    8th Floor Oxbridge Place 9820-106 Street Edmonton Alberta T5K 2J6 Canada
    Edmonton, Alberta, T5K 2J6
    Canada
    Bidding details

    Full details for this tender opportunity are available on a third-party site

    Click on the button below to be directed to this website. Note that on the third-party site you may need an account to view and/or bid on this tender. Information on any fees or additional costs to access the full details is outlined in the Description tab of this tender opportunity.

    Summary information