Transportation and Economic Corridors - Invitation to Bid - TND0020479 – Hwy 40 - GBC, ACP, Street Light Installation, Construction of S.P.C.S.P. Culvert, Precast Prestressed Concrete Girder Bridge, Structural Steel Girder Bridge and Other Work
Solicitation number AB-2026-02915
Publication date
Closing date and time 2026/06/11 10:01 EDT
Description
Tender available date: Saturday, April 11, 2026.
Tender closing date: Thursday, June 11, 2026.
Pre-Tender Meeting:
Session No. 1: April 27, 2026 at 1:30 to 3:30 pm, MST , Main Conference Room at 1st Floor 4709 44 Ave, Stony Plain, AB, T7Z 1N4.
Attendees may also join the meeting via Microsoft Teams using the link below:
https://teams.microsoft.com/meet/285728849795821?p=hPtfqfcvn7sorAtMFh
Session No. 2: To Be Determined (TBD)
Project Inquiries: Ikhtiyar Mammadov, Project Procurement Officer, Alberta Transportation and Economic Corridors. E-mail: Ikhtiyar.Mammadov@gov.ab.ca.
TENDERS will only be received by email at trans.tender@gov.ab.ca, before 2:01:00 P.M., for construction of the following work:
TND0020479
Clearing, Grading, Granular Base Course, Asphalt Concrete Pavement and Other Work
40:30 to :32, S. of Pinto Creek to N. of Berland River, AB
kilometre 53.910 to 57.220
kilometre 9.400 to 25.200
Grading, Granular Base Course, Asphalt Concrete Pavement, Street Light Installation and Other Work
40:32, Safety Rest Area - Adjacent to the N.B.L. of Hwy. 40, S. of the Berland River, AB
Construction of S.P.C.S.P. Culvert, Grouting and Abandoning of Existing Culvert and Other Work
40:30, B.F. 77193 - Carrying Hwy 40 over a Watercourse, N. of Entrance, AB
Construction of S.P.C.S.P. Culvert, Removal and Disposal of Existing Culvert and Other Work
40:30, B.F. 77194 - Carrying Hwy 40 over Pinto Creek, N. of Entrance, AB
Construction of Precast Prestressed Concrete Girder Bridge, River Training, Demolition of Existing Bridge Structure and Other Work
40:32, B.F. 77196 - Carrying Hwy. 40 over the Tributary to Fox Creek, S. of the Berland River, AB
Construction of Structural Steel Girder Bridge, Bank Protection, Demolition of Existing Bridge Structure and Other Work
40:32, B.F. 74710 - Carrying Hwy. 40 over the Berland River, AB
NORTH CENTRAL REGION
APPROXIMATE QUANTITIES:
1 Lump Sum Environmental Management
276,016.25 Tonne Supply of Aggregate - With Option
5.7 Hectare Clearing, Timber Salvage and Mulching
41,130 Cubic Metre Rippable Rock Excavation - Premium
685,490 Cubic Metre Common Excavation
46,060 Cubic Metre Borrow Topsoil Excavation
72,000 Cubic Metre Borrow Excavation
59,500 Cubic Metre Common and/or Borrow Excavation Loaded to Trucks
252,170 Cubic Metre Kilometre Overhaul
218 Metre Culverts - Supply and Install (600 mm dia. C.S.P.)
286 Metre Culverts - Supply and Install (800 mm dia. C.S.P.)
84 Metre Smooth Wall Steel Pipe - Supply and Install (900 mm dia.)
76 Metre Smooth Wall Steel Pipe - Supply and Install (1 200 mm dia.)
3,730 Cubic Metre Filter Material Des. 8 Class 25
1,930 Metre Turbidity Curtain - 1.5 m High
1,830 Cubic Metre Heavy Rock Riprap (Class 1)
2,650 Cubic Metre Heavy Rock Riprap (Class 1M)
12,770 Square Metre Turf Reinforcement Mat (Type C)
33,770 Square Metre Erosion Control Soil Covering - Supply and Install (Type C)
3,220 Metre Synthetic Permeable Ditch Barrier
769,340 Square Metre Topsoil Placement
46.93 Hectare Drill Seeding
19.60 Hectare Hydro-Seeding
240,400 Square Metre Slope Texturing
8.7 Hectare Tree Planting - 2 m x 2 m Grid
234,960 Square Metre Preparing Subgrade Surface (First Layer)
196,800 Tonne Granular Base Course Des. 2 Class 25
33,910 Metre Cutting of Pavement
1,890 Metre Crack Repair - Shallow Mill and Fill
34,380 Square Metre Cold Milling Asphalt Pavement - 50 mm Depth
57,570 Tonne Asphalt Concrete Pavement - EPS Mix Type H2 (PG 58-28)
9,890 Tonne Asphalt Concrete Pavement - EPS Mix Type S3 (PG 58-28)
19,11 Kilometre Roadway Lines - Supplying Paint and Painting (Directional Dividing and 2 Edge Lines)
31.80 Kilometre Milled Rumble Strip - Shoulder
B.F. 77193 - Carrying Hwy 40 over a watercourse near Entrance
1 Lump Sum Traffic Accommodation for Bridge Construction (B.F. 77193)
1 Lump Sum Grouting of Abandoned Culverts (B.F. 77193)
1 Lump Sum SPCSP - Supply (B.F. 77193)
1 Lump Sum SPCSP - Assembly (B.F. 77193)
B.F. 77194 - Carrying Hwy 40 over Pinto Creek near Entrance
1 Lump Sum Traffic Accommodation for Bridge Construction (B.F. 77194)
1 Lump Sum Demolition and Disposal of Bridge Structure (B.F. 77194)
1 Lump Sum SPCSP - Supply (B.F. 77194)
1 Lump Sum SPCSP - Assembly (B.F. 77194)
B.F. 77196 - Carrying Hwy 40 over the Tributary to Fox Creek, 67 Km NW of Hinton
1 Lump Sum Traffic Accommodation for Bridge Construction (B.F. 77196)
1 Lump Sum Demolition and Disposal of Bridge Structure (B.F. 77196)
1 Lump Sum Headslope Preparation and Backfill - (B.F. 77196)
306 Metre Supply of Piling - Plain Steel H-Pile - 310 x 79 mm (B.F. 77196)
18 Pile Pile Set-up (Driven Piles) - H-Pile (B.F. 77196)
185 Metre Supply of Piling - Plain Steel Pipe Pile - 610mm dia. x 9.5mm (B.F. 77196)
265 Metre Pile Driving - Pipe Pile (B.F. 77196)
1 Lump Sum Precast Concrete Units - Supply and Fabrication, Delivery and Erection - 8 m SLC-510 (B.F. 77196)
1 Lump Sum Precast Concrete Units - Supply and Fabrication, Delivery and Erection - 10 m SLC-510 (B.F. 77196)
78 Cubic Metre Pile Concrete (Class) - Supply and Place (B.F. 77196)
50 Cubic Metre Concrete (Class C) - Supply and Place (B.F. 77196)
B.F. 74710 - Carrying Hwy 40 over the Berland River, 62 Km N. of Entrance
1 Lump Sum Demolition and Disposal of Bridge Structure (B.F. 74710)
1 Lump Sum Excavation - Structural (B.F. 74710)
16 Pile Drill Rig Set-up (Drilled Piles) - 600 mm Dia. Concrete Pile (B.F. 74710)
192 Metre Pile Installation (Drilled Piles) - 600 mm Dia. Concrete Pile (B.F. 74710)
307 Cubic Metre Concrete (Class HPC) - Supply and Place (B.F. 74710)
37,692 Kilogram Corrosion Resistant Reinforcing Steel - Supply (B.F. 74710)
1 Lump Sum Structural Steel - Supply and Fabrication, Delivery and Erection (B.F. 74710)
1 Lump Sum Bridgerail - Supply and Fabrication, Delivery and Installation (B.F. 74710)
2,800 Cubic Metre Heavy Rock Riprap (Modified Class 3) - (B.F. 74710)
Contractor to supply all materials.
Contract Completion Date: May 30, 2028.
Contract duration
The estimated contract period will be 23 month(s), with a proposed start date of 2026/06/12.
Trade agreements
-
World Trade Organization Agreement on Government Procurement (WTO GPA)
Contact information
Contracting organization
- Organization
-
Transportation and Economic Corridors
- Address
-
4999 98 AvenueEdmonton, CA-AB, T6B 2X3CA
- Contracting authority
- Ikhtiyar Mammadov
- Email
- ikhtiyar.mammadov@gov.ab.ca
- Address
-
4999 98 Ave NWEdmonton, CA-AB, T6B 2X3CA
Bidding details
Full details for this tender opportunity are available on a third-party site
Click on the button below to be directed to this website. Note that on the third-party site you may need an account to view and/or bid on this tender. Information on any fees or additional costs to access the full details is outlined in the Description tab of this tender opportunity.